DEVELOPMENT AGREEMENT
BY AND BETWEEN THE CITY OF LANSING
AND B & A OF MICHIGAN, INC.
This Agreement, (hereinafter referred to as the "Agreement") entered
into this day of � (� '72_r 1986 , by and between the
City of Lansing, a Home Rule City (hereinafter referred to as "City" ) ,
having its office at 124 W. Michigan, City of Lansing, State of
Michigan, 4893.3 , and B & A of Michigan, Inc. , a Michigan Corporation,
(which; is hereinafter referred to as "the Company") , and the Lansing
Building Authority, 7th Floor, City Hall , Lansing, Michigan, 48933 ,
hereinafter referred to as "Building Authority" .
Whereas , the City intends to declare that the area proposed for
development identified in "Exhibit A" , a copy of which is attached to
this Agreement and is hereinafter referred to as "344 Master Plan
Area" is "blighted" pursuant to No. - 344 P.A. of 1945 , specifically
MCLA 125 . 71 et seq; and
Whereas the City has determined that the proposed Development
consisting of a Hotel , Conference Center, parking ramp and public site
(hereinafter referred to as "Development") to eliminate deteriorated
conditions which exist in the 344 Master Plan Area and the proposed
Development will result in improved land usage complementary to adjacent
public and private operations and properties and will be in conformance
with adopted or to be adopted plans and resolutions outlining development
plans for the 344 Master Plan Area; and
Whereas the proposed Conference Center is a necessary component of
the adjacent Greater Lansing Convention/Exhibition Center, through its
provision of providing an adequate number of conference and meeting
rooms ; and
Whereas , the proposed Hotel will provide hotel . rooms which will
enable the Greater Lansing Convention/Exhibition Center to attract
additional bookings by increasing the number of available hotel rooms
in the immediate area; and
Whereas , the provision for parking and a public site are necessary
to support the activities of the Greater Lansing Convention/Exhibition
Center, proposed Conference Center and the proposed Hotel and to
accommodate visitors; and
Whereas , the proposed Development will stimulate additional economic
development of surrounding properties which will result in further
expansion of the City ' s tax base and the creation of additional jobs;
and
Whereas, the Company has committed to constructing and equipping
and operating a hotel and full service kitchen contingent upon the
City ' s construction of an adjacent Conference Center, public parking
and public site; and
Whereas , the City is entering into this Agreement in reliance on
the representations of the Company as to the feasibility of the proposed
Development with the responsibility for documentation of feasibility
including any marketing studies resting solely with the Company; and
Whereas , the City has determined that the development of the 344
Master Plan Area pursuant to this Agreement, and the fulfillment generally
of this Agreement, are in the vital and best interest of the City and
the health, safety, and welfare of its residents , and in accord with
the public purpose and provisions of applicable state and local laws
and requirements under which this project is being undertaken and is
being assisted;
Now, Therefore, in consideration of the provisions and the mutual
obligations of the parties hereto, each of them does hereby covenant
and agree with the other as follows :
ARTICLE I
PROJECT
A. Subject to the satisfactory completion of all of the conditions
described herein, the Company shall be responsible at its sole expense
for the land acquisition, construction, equipping and operation of a
-2-
Hotel and for the land acquisition, construction and operation of the
full service kitchen for the Hotel . Subject to the mandatory financial
limitations contained in Article II (B) of this Agreement, the City
shall share in the cost of equipping the full service kitchen. The
Hotel and the land for the Hotel site shall be owned by the Company
and shall be an "Embassy Suites" Hotel with a minimum of 272 suites
(hereinafter referred to as "Hotel" ) and shall include a full service
kitchen which is adequate to serve the needs of the Hotel and Conference
Center. The Hotel shall be constructed in a manner so as to be fully
handicapper accessible and barrier free.
B. Subject to the satisfactory completion of all of the conditions
described herein, the Building Authority shall borrow monies and construct
a Conference Center with televideo down linking capabilities in accordance
with a turn-key construction agreement among the Company and the City
and the Building Authority. The Conference Center shall not be less
than 30 , 000 gross square feet and shall be constructed in a manner so
as to be fully handicapper accessible and barrier free. The Company
shall operate and maintain the Conference Center in complete accordance
with the terms and conditions of a Management Agreement between the
City, Building Authority and Company. The Conference Center shall be
dedicated to public use and open for use by the public on a non-
discriminatory basis. The Building Authority shall retain fee simple
title to the Conference Center until such time as the bonds issued by
the Building Authority to finance the Conference Center are paid in
full at which time the Building Authority shall convey title to the
Conference Center to the City. The Building Authority shall lease to
the City the Conference Center pursuant to a lease between the Building
Authority and the City until such time as the bonds issued by the
Building Authority to finance the Conference Center are paid in full .
The Company shall have the right to review and comment on this lease
prior to its execution.
C. Subject to the satisfactory completion of all of the terms and
conditions contained herein, the Building Authority shall borrow monies
to acquire land and construct a parking ramp immediately adjacent to
the Conference Center and Hotel which is not less than two levels and
containing space for not less than 440 vehicles (hereinafter referred
to as "Parking Ramp" ) . The Parking Ramp shall be leased to the City by
-3-
the Building Authority and dedicated to the public on a first come
first serve basis and shall be subject to all the requirements set
forth in the bonding ordinances , rates , regulations, rules and ordinance
of the City parking system. If any of the Company ' s employees , hotel
guests , Company agents , the Company itself or any guests of the Conference
Center utilize parking space within the parking ramp, they shall pay
the market rate as determined solely by City Council .
D. The Company shall purchase subject to the satisfactory completion
of all of the terms and conditions contained herein marketable fee
simple title to any parcels located within the Public Site, the location
of which is set forth in Exhibit B, a copy of which is attached to
this Agreement and which the Company has options on at the time of
execution of this Agreement. The City shall no later than two (2)
years from the date of the City' s , TIFA ' s and Building Authority' s
written approval as to the financing of the Hotel by the Company,
purchase from the Company the land located within the Public Site and
which is owned by the Company in fee simple title for no greater than
the Company ' s cost of acquisition of the land. For purposes of this
Agreement "cost of acquisition" shall mean the purchase price, title
work, cost of recordation, reasonable real estate commission, and
interest on borrowings by the Company to purchase the parcels located
within the Public Site but shall not include any cost of demolition.
Within a reasonable time thereafter, the City. shall begin to construct
a public use which may include an urban park or public parking on the
parcels which are located within the Public Site and have been purchased
by the City from the Company. The public use for the Public Site shall
be compatible with the Hotel and Conference Center use. If at any
time subsequent to the date the City, TIFA' and Building Authority
furnishes to the Company satisfactory evidence of its financing for
the Hotel , the Company furnishes evidence to the City that the Company
is unable to purchase or obtain the parcels located within the Public
Site, which the Company did not have options on at the time of execution
of this Agreement, the Company shall notify the City so that if
necessary, appropriate legal action by the City may be taken.
ARTICLE II
FINANCING
A. The Company shall be solely responsible for acquiring the land
-A-
for the Hotel site and the site of the full service kitchen and
construct and equip not less than a 272 suite, "Embassy Suites" Hotel
and full service kitchen for a total cost of not less than $24, 000 , 000 . 00.
The City shall not be responsible for any costs associated with or
connected with the land acquisition, construction, equipping or operation
of the Hotel . The City shall not be responsible for any costs associated
with or connected with the land acquisition, construction or operation
of the full service kitchen. Prior to commencement of construction of
the Hotel and full service kitchen, the Company shall submit satisfactory
proof to the City, Building Authority and Tax Increment Finance Authority
(hereinafter called TIFA) in the form of written certification by
independent professionals including a licensed Michigan architect
selected by the City regarding the total cost of the construction and
equipping of the Hotel and full service kitchen. For purposes of this
Agreement, the term "commencement of construction" shall mean excavation
to design footing depth.
B. The Building Authority shall borrow monies by issuing bonds
sufficient to acquire the land, construct and equip the Conference
Center and share in the cost of equipping the full service kitchen but
under no circumstances shall said amount exceed the total sum of
$4, 500, 000 . 00 plus capitalized interest, plus construction . period
interest, if any. Any equipment which the City and/or Building Authority
is purchasing in order to share in the cost of equipping the full
service kitchen shall be equipment which is determined by the Building
Authority and City to be necessary for the operation of the Conference
Center. The Building Authority and City shall have the right to tag
or otherwise specifically identify the equipment which is purchased
for use in the full service kitchen with Building Authority bonds.
Prior to the purchasing with monies from Building Authority bonds of
any equipment for use in the full service kitchen, the Company shall
provide to the Building Authority and City an itemized list of said
equipment along with the cost associated with each piece of equipment.
The Building Authority and City shall approve the equipment identified
in the list - submitted by the Company prior to the Company being
authorized to purchase said equipment with monies from the Building.
Authority bonds .
-5-
The Company shall be solely responsible and shall guarantee to the
satisfaction and sole discretion of the City, Building Authority and
TIFA to pay for any costs or expenses incurred by the City, Building
Authority or TIFA and which are necessary to acquire the land for the
Conference Center and construct and equip the Conference Center and
equip the full service kitchen which costs are in excess of. $4, 500 , 000. 00
plus capitalized interest, if any, plus construction. period interest,
if any. The Building Authority bonds shall be supported by lease
payments from the City which lease payments shall be supported by the
tax increments created by the taxable development within the Tax Increment
Financing Authority (hereinafter referred to as "TIFA" ) Development
Area, as shown by Exhibit C a copy of which is attached to this
Agreement. The TIFA Development Area shall be created pursuant to a
development plan and financing plan prepared and approved pursuant to
the provisions of P.A. 450 of Michigan Public Acts of 1980 specifically
MCLA 125 . 1801 et seq. The Company, its successors and assigns shall
provide an unequivocal - and absolute guarantee in a. form and by an
entity (ies) satisfactory to the City, Building Authority and TIFA for
the repayment of the bonds . The guarantee shall provide that if
during the term of the bonds , accumulated tax increments collected by
TIFA. and paid to the City or Building Authority pursuant to an executed
Agreement between the City, the Building Authority and TIFA are
insufficient to pay on an annualized basis the. principal and interest
payable on the bonds as set forth in the attached amortization schedule
entitled Exhibit D (to be supplied at the time of bond sale) or a
determination is made whether by legal opinion or by any judicial
decision that the accumulated tax increments collected by TIFA from
the TIFA Development Area are not legally collectable for the repayment
of the Building Authority bonds , the Company, its assigns or successors-
and the entity (ies) which furnished the guarantee shall unequivocally
and absolutely be obligated to repay the bonds which were issued by
the Building Authority to finance the land acquisition, construction
and equipping of the Conference Center and the sharing in the equipping
of the full service kitchen. Satisfactory evidence of said guarantee
by the Company, its assigns or successors and/or other entity (ies)
satisfactory to the City, Building Authority and TIFA shall be provided
to the City, Building Authority and TIFA prior to the City, Building
Authority or TIFA having any obligation under this Agreement.
-6-
C. The Building Authority shall borrow monies by issuing revenue
bonds sufficient to acquire the land and construct a Parking Ramp as
described in paragraph I (C) of this Agreement immediately adjacent to
the Conference Center, full service kitchen and Hotel . The Building
Authority shall lease pursuant to an executed agreement between the
Building Authority and City Council the Parking Ramp to the City and
the revenue bonds shall be supported by the revenue from the City
Parking System and backed by the full faith and credit of the City.
Upon repayment of the bonds the Building Authority shall convey fee
simple title to the Parking Ramp and land on which it is located to
the City. The bonds shall be issued by the Building Authority for not
more than $3 , 500 , 000. 00 plus capitalized interest, if any. If the
cost of constructing the Parking Ramp as described in paragraph I (C)
of this Agreement and as bid by the Building Authority exceeds $2. 0
Million, the Company shall construct the Parking Ramp pursuant to the
specifications as approved by the City Council and Building Authority
and as bid by the Building Authority for an amount not to exceed $2 . 0
Million. The Company shall have the opportunity to review and comment
on the plans and specifications for the Parking Ramp prior to City
Council and Building Authority approval of the plans and specifications
of the Parking Ramp as described in paragraph I (C) of this Agreement.
D. Upon written approval by the City, Building Authority and TIFA
of the financing for the Hotel and full service kitchen submitted by
the Company, the City shall make a good faith effort to obtain funding
for the land acquisition and construction and development of the Public
Site as described in Exhibit. B from other public sources including the
State of Michigan. If the City is unable to obtain financing from
other public sources within two (2) years from the date of written
approval of the financing for the Hotel and full service kitchen as
submitted by the Company to the City, Building Authority and TIFA, the
Building Authority shall borrow monies by issuing revenue bonds backed
by the full faith and credit of the City in an amount sufficient to
acquire the land which is located within the Public Site and owned by
the Company but under no circumstances in an amount greater than
$2 , 200 , 000 . Any tax .increments collected by TIFA from the TIFA
Development Area which are not needed to amortize the bonds issued
pursuant to 11 (B) of this Agreement and as set forth in the attached
amortization schedule, Exhibit D, may be applied to repayment of Building
-7-
Authority bonds which have been issued for acquisition and development
of the property in the Public Site. Upon obtaining sufficient monies
but not later than two (2) years from the date of the City ' s TIFA ' s
and Building Authority ' s written approval of financing for the Hotel
and full service kitchen by the Company, the Company shall convey to
the City and .City shall purchase fee simple title to the land which
the Company owns within the Public Site at the cost of acquisition to
the Company provided that said amount sha 11 not be greater than $1 , 800, 000.
E. Upon acquisition of any of the properties by either the
Building Authority, City or Company, within the Site Development Area,
the Company shall be solely responsible for all the costs of demolition
and shall demolish all structures located within the Site Development
Area. Demolition by the Company shall be performed by the Company in
conformance with all applicable Federal State and local laws and
regulations. The Company shall maintain those sites which are not
scheduled for immediate construction after demolition in a condition
satisfactory to the City Building Safety Division until the time of
conveyance to the City or Building Authority whichever is applicable.
ARTICLE III
DEVELOPMENT PLANS
A. Subsequent to the written approval by the City, Building
Authority and TIFA of the financing for the Hotel and full service
kitchen, the City shall prepare a Development Area Plan for the overall
development of an area identified and described in Exhibit C, which is
attached and incorporated as part of this Agreement. The Development
Area Plan shall be prepared consistent with the provisions of P.A. 450
of Public Acts of 1980; specifically, MCLA 125. 1801 et seq. and submitted
for approval to the TIFA and the City Council .
B. On or before the execution of this Agreement, the Company
shall prepare and submit to the City Council and the Building Authority,
at the Company ' s sole expense a preliminary Site Development Plan
which is Exhibit E, a copy of which is attached and incorporated
herein as if fully set forth herein. The Preliminary Site Development
Plan as submitted shall include the type, design, size and location of
all buildings , landscaping, sidewalks , driveways , parking facilities
-8-
located within the area set forth in the Preliminary Site Development
Plan. The Preliminary Site Development Plan shall be approved by the
City Council and Building Authority. Such approval shall not be
unreasonably withheld.
C. No later than twelve (12) months from the date of the written
approval by the City, TIFA and Building Authority of the financing for
the Hotel and full service kitchen, the City shall prepare a proposed
344 Master Plan for an area which is described in Exhibit A a copy of
which is attached and submit same to the Planning Board for the
Planning Board ' s review and approval .
ARTICLE IV
TIMING
A. Immediately, upon written approval by the City, TIFA and
Building Authority of financing for the Hotel and full service kitchen,
the Company shall be responsible for acquiring fee simple title to the
Hotel Site and Conference Center Site, Parking- Ramp Site and all
properties located within the Public Site which the Company has options
on at the time of execution of this Agreement.
B. Immediately upon purchase of the Hotel Site and site for the
full service kitchen by Company, and provided that satisfactory evidence
of the Company ' s absolute and irrevocable guarantee to repurchase the
Hotel Site and site for the full service kitchen has been furnished to
the City, the City may purchase the Hotel Site and site for the full
service kitchen from the Company at a cost not greater than $600 , 000.
The. City shall hold title to Hotel Site, allowing Company its agents,
contractors or subcontractors possession. No later than thirty (30)
days after January 1 , 1987 the Company shall purchase the Hotel Site
and site for the full •service kitchen at the City' s complete costs of
acquisition. During the Company ' s possession of the Hotel Site the
Company shall furnish satisfactory proof of insurance and indemnification
to the City as determined solely by the City.
C. On or before 30 calendar days from the date of written approval
by the City, TIFA and Building Authority for the financing of the
Hotel and full service kitchen, the Company shall proceed, at its own
-9-
cost, to demolish all _uctures located on land wi._.:h has been acquired
by the Company, City or Building Authority.
D. On or before 60 calendar days from the City, TIFA and Building
Authority written approval of financing of the Hotel and full service
kitchen, the Company shall commence construction of the Hotel and full
service kitchen as located within the approved Site Development Area
Plan.
E. On or before 180 calendar days after the commencement of the
construction of the Hotel and full service kitchen, pursuant to the
terms and conditions of a Construction Agreement between the City
Council , Building Authority and Company, the Building Authority shall
purchase the Conference Center Site from the Company and commence
construction of the Conference Center as located within the approved
Site Development Area Plan.
F. On or before 180 calendar days after the date of commencement
of construction of the Hotel and full service kitchen the Building
Authority shall purchase the Parking Ramp Site from the Company and
commence construction of the parking ramp as located within the approved
Site Development Area Plan.
ARTICLE V
MISCELLANEOUS
A. The Company shall assist the City and/or the Building Authority
and/or TIFA in obtaining financing or in execution of any of the
documents necessary for the public financing. The City and Building
Authority shall assist the Company in obtaining financing or in execution
of any of the documents necessary for the financing of the Hotel .
B. During the term of the Building Authority' s bonded indebtedness
for the Conference Center, any change in Hotel affiliation or operation
or name or ownership shall be subject to the City Council ' s and Building
Authority ' s prior review and written approval . The approval shall not
be unreasonably withheld.
C. The City shall provide at a cost not to exceed $10 , 000 . 00
storm and sanitary sewer leads to the private property line of the
Site Development Area.
D. Company shall provide a good faith effort to employ as many
-10-
residents of the Ci as is possible and fea. _ble provided that
not less than 25% of the total operational work force of the Hotel ,
Conference Center and full service kitchen shall be residents
of the City. The Company shall require the payment of prevailing wages pursuant
to Section 2-57 of the Lansing Code of Ordinances. to all persons working on the construction
of the Hotel, Full Service Kitchen, Conference Center and Parking Ramp.
ARTICLE VI- CONTINGENCIES
The terms and conditions of this Agreement are expressly contingent
upon the following acts :
A. The City ' s , the Building Authority ' s and TIFA' s and Company' s
obligation to act in accordance with all of the terms and conditions
of this Agreement are expressly contingent upon the Building Authority ' s
ability to sell and issue bonds which are required to cover the
financial obligations as proposed in this Agreement and the Company' s
ability to obtain acceptable financing for the Hotel and full service
kitchen. The inability of the Building Authority to issue or sell
bonds the principal and interest of which are payable with revenue
generated by tax increment financing derived from the taxable
development within the TIFA development area or the inability of the
Company to arrange financing for the Hotel and full service kitchen
shall result in the automatic termination of this Agreement. The
parties commit to undertake a good faith effort to obtain financing
for their respective obligations under this Agreement. If termination
of this Agreement occurs due to an inability to obtain financing
necessary to fulfill responsibilities under this Agreement, the term-
ination shall not subject the party unable to obtain financing to
any damages , claims , injuries or liabilities as a result of activities
undertaken by the other party prior to the determination of unfeas-
ibility or inability to obtain financing by the other party. For
purposes of this Agreement, the phrase "Building Authority' s ability
to sell and issue bonds" shall include, inter alia, submission of
satisfactory guarantee by the Company, its successors and assigns
and by entity (ies) acceptable to the City, TIFA and the Building
Authority as set forth in Article II (B) of this Agreement.
B. Approval by the City Council and TIFA of a financing and
development plan for the TIFA Development Area pursuant to the require-
ments of P.A. 450 of 1980; specifically MCLA 125 . 1801 et seq.
C. . The execution of an agreement among the City Council , TIFA
and the Building Authority concerning the collection of and payment
of tax increments derived from the taxable development within the
approved
-11-
• D. Subsequent tc he obtaining by the Compar,r , Building Authority
or the City of marketable fee simple title to the properties within
the Site Development Area Plan, the City, Building Authority or the
Company including any of their representatives or agents , officers or
employees shall be permitted access to the properties at all times
including but not limited to inspection of all work being performed in
connection with the construction of any improvements.
E. Subsequent to the commencement of the construction of the
w
Hotel and full service kitchen, the Company shall at no cost to the
City, Building Authority or TIFA make reports at no cost to the City,
Building Authority and/or TIFA and in such detail and at such times as
may be reasonably requested by the City, Building Authority or TIFA as
to actual progress of the Company with respect to such construction.
F. During the term of the bonds issued pursuant to II (B) of this
Agreement, Company shall notify the City and Building Authority in
writing and obtain the City' s and the Building Authority ' s prior written
approval of any proposed change in the identity of any general partners
of the Company or any sale or conveyance of more than 50% of the
controlling interest in the Company.
G. The Company or any of its agents or representatives shall not
discriminate against any employee or in complying with any of the
terms and conditions of this Agreement on any illegal basis including
race, sex, height, weight, age, marital status , religion or national
origin. Company shall require that in any of its construction agreements
or in any of the agreements between the general contractor and its
subcontractors an anti-discrimination clause shall be included.
H. Time is of the essence of this Agreement and every covenant,
term, condition and provision hereof. The City, Building Authority
and Company shall undertake their best efforts to expedite all procedures
and approvals to ensure this project is completed on schedule.
I . . Any titles of the several parts , articles, and sections of
this Agreement are inserted for convenience of reference only and
shall be disregarded in construing or interpreting any of its provisions.
-13-
TIFA Development Area.
D. Execution of a Construction Agreement for the Conference Center
between the City Council , Building Authority and Company.
E. Execution of a Management Agreement for the Conference Center
between the City Council , Building Authority and the Company.
F. Approval by all appropriate public bodies of all development
plans as set forth in Article III of this Agreement.
ARTICLE VI
OTHER PROVISIONS
A. The City and the Building Authority have entered into this
Agreement relying on evidence of options submitted to the City which
indicate that the Company has obtained optionson a substantial part
of the properties located in the proposed Site Development Area Plan.
The Company shall use its best efforts to continue said options with
all costs of maintaining these options solely the responsibility of
the Company. If the City, Building Authority and Company fail to
enter into a written development agreement on or before September 30,
1986 , the Company is under no obligation to continue any of these
options beyond September 30 , 1986.
B. The Company has selected the Hotel , full service kitchen site
and Conference Center site and agrees that it has not received any
guarantees , representations, or statements , whether verbal or written,
from the Building Authority, City, their agents', employees or officers ,
regarding- the condition of the property or soil or suitability of the
property for the construction of a Hotel , full service kitchen and
Conference Center.
C. The Company shall not construct any building or other structure
or improvement on, over or within the boundary lines, of any recorded
easement for public utilities unless such construction has been approved
by the Public Service Department and/or Board of Water & Light, whichever
is appropriate.
-12
J. Any notice, demand or other communication under this Agreement
by any party to the other shall be sufficiently given or delivered if
it is dispatched by registered or certified mail , postage prepaid,
return receipt requested or delivered personally and
1) In the case of the Company is addressed to or delivered to: W.
Warren Barberg, President, 307 S. Farwell , Eau Claire, Wisconsin, 54701 .
2) In the case of the City is addressed to or delivered to Mayor
and City Clerk, Ninth Floor, City Hall , Lansing, Michigan, 48933 .
Building Authority Chairperson, Seventh Floor, City Hall , Lansing,
Michigan, 48933 .
K. The City, Building Authority and Company agree that this
Agreement constitutes the entire Agreement between the parties and any
representations, warranties or statements , whether verbal or written,
not contained herein shall not be binding on either party. No alterations ,
modifications, amendments or waiver of this Agreement or any of its
terms or conditions shall be effective unless in writing and executed
by both parties to this Agreement.
L. This Agreement is not intended nor shall it create any rights ,
expectations , or benefit to any third parties ,including any creditor
of the parties .
M. The City Council and Building Authority may, in their sole
discretion, upon written request of the Company, grant written extensions
of any due dates in this Agreement.
N. This Agreement shall be governed by and in accordance with the
laws of the State of Michigan.
O. This Agreement shall not create any partnership or joint
venture between the parties hereto, or render any party liable for any
of the debts or obligations of the other party.
P. Any permits or licenses required by Federal , State or local
laws for the construction, operation and maintenance of the Hotel and
-14-
Conference Center shall be the sole responsibility of the Company.
The City and Building Authority shall provide assistance of a non-
financial nature for the Company in obtaining any required permits or
licenses .
Q. The time for performance of any term, convenant, condition, or
agreement of this Agreement shall be extended by any period of unavoidable
delays . In this Agreement, "unavoidable delays" means beyond the
reasonable control of the party obligated to perform the applicable
term, convenant, condition or agreement under this Agreement and shall
include, without limiting the genality of the foregoing, delays
attributable to acts of God, any other party to this Agreement (for
example, a delay in transfer of possession) , strikes, labor disputes,
governmental restrictions , court injunctions , riot, civil commotion,
acts of public enemy, and casualty.
R. In construing any of the terms and conditions of this Agreement,
this Agreement and each of its terms and conditions shall be deemed to
have been drafted and prepared by all of the parties to this Agreement
and not by any one party to this Agreement.
S. The Company shall indemnify and hold •the City, the Building
Authority and their agents , representatives , officers , members , and
employees harmless against any and all claims asserted by or on behalf
of any person, firm or corporation, private or public, arising or
resulting from, or in any way connected with the financing, construction,
installation, operation, use or maintenance of the Hotel , full service
kitchen and Conference Center, including all liabilities , costs and
expenses including reasonable counsel fees , incurred in any action or
proceeding brought by reason of any such claim. In the event that any
action or proceeding is brought against the City or the Building
Authority (or any other person indemnified hereby) by reason of any
such claim, such action or proceeding shall be defended against by
such counsel as is designated by the. City or the Building Authority at
the sole expense of the Company. The Company shall also indemnify the
City and the Building Authority from and against all costs and expenses,
including reasonable counsel fees, incurred in enforcing any obligation
of the Company under this Agreement or in fulfilling any responsibility
-15-
or exercising any right of the City or the Building Authority hereunder.
Notwithstanding anything to the contrary herein, the foregoing
indemnification agreement of the Company shall not apply to any claim,
liability, cost or expense to the extent that such claim, liability,
cost or expense is occasioned by the negligence or willful misconduct
of the City or the Building Authority. The obligations of the company
under this Section shall survive the repayment of the loans and the
termination of this Agreement.
IN WITNESS WHEREOF the parties hereto have executed this Agreement
as of the date and year first above written.
-16-
• k'ITN�' SES CITY OF LANSING
By
Te_ y J a e, Mayor
By
Rita M. Bauman, City Clerk
LANSING BUILDING AUTHORITY
By
• Howard G. McCaffery
Its Chairman
B & A OF MICHIGAN, INC.
ByLL tkA1L&k
• Its ��^S(0
APPROVED AS TO FORM ONLY •
UtkP •
Alvan P. Knot
Chief Assistant City Attorney •
• Certification as to the availability
of funds for the performance of this
• Agreement in Accoun No.
tep n W. Duarte, Cl
-13
«;AL N 2 t IL
vst NO J sr. r1t),_ ro1 SEND s r. SE YM r R s r. L
ll [ iLCAkOLJI_AVEJI ' hi 1LN. 1LcAr/11L_1L
TL
1u1fl JJAS/ GTO S- /A FEL1LI1L 0 3
iS. i6 :; AVE.
________ ____ ___
• __
r - 1 ` iU
a Iv n3 b CE-DAR fTLL' - if
r ' ;ct ] LARCH s% �I Arc//•
-� _ ll
I�_L_A5T JJr*� ST. �'� _ b MYRA1L 1---
_ _
I105,1I T L HOSI�IE' s r OOi' ••!c&
/ J I !' � �I ,'r/{ s7 l inn,e 1 `''.
I
NG:
LEvE D CA S..
O
- DDQ _ :
sERvicE AEA:
I
r- --T--r- 1_1 , I '
1 c I I ' I I -
ic
CNFER EN 1 - --
____ J ____
i I J
,
C.� IIJ 'i T
PUBLIC SITE
; ' . "• .MIC lIGAN AVENUE' ' • •
EXHIBIT B
PUBLIC SITE
• -NUrl ) If I,Uli_iI_IMLNc 5r. Ib____ I� N. flJIALNLfl_1I _ JL
HL_ roj /sENvjt_
V5ENa s). J UI sI `' ISTrMJ,L 5t.
____ft
• I s. CAr -oL ii_AV1.L' + 1tN. 1[CA i'/ oL
EIHJ_ flU P
jIhJ'
1 `; /iiftil_ GrANa AVE .
-
R/VER
r _ �
t ► r T �,
�i S i � ' 1fV�
sr
►_- — —wn� s ACE VAR
i1 : __ _ ___ ___
5l1.- L Ali CI/
ro ' I�' EA5r t*IST I'� _ h CON!AIL
___
t� __
z l y _Lr� ST.
-r=_i-�—ice.-= - , ��t!�1 --- 2 b n
a //Oh ' � '` z2i JLLios' r ,?__J5t ooF NGL y
Bond Amortization Schedule
(To be completed at time of bond sale)
EXHIBIT D
• J U _ Q Q
Q r---
NG. _
LEVE D CA S..
4 SERVICE AREA' _
1
N _ R EN _-_ iL
= 9 lcrEi1p
t- r •C: • • >j \ • • __ • ___ _
1 �
PUBLIC SITE •
lI -_IaIa 1aia • aiaAE j -Jai . i - i - i is . - i - i +
-MICHIGAN AVENUE -' •
EXHIBIT E
r-•,, PRELIMINARY SITE DEVELOPMENT PLAN