Loading...
HomeMy WebLinkAboutConstruction Agreement - Lansing Building Authority 9/8/86 CONSTRUCTION AGREEMENT THIS AGREEMENT made as of this L!'\ day of 1986 , by and between the City of Lansing, Michigan, a Home Rule • City, (hereinafter called the "City") , and the Lansing Building Authority, hereinafter referred to as "Building Authority" and B & A of Michigan, Inc. , (hereinafter called "Company") . WITNESSETH: WHEREAS, the City, the Building AutYprity and the Company have entered into an Agreement dated - O , hereinafter referred to as Development Agreement; and WHEREAS, pursuant to the terms of the Development Agreement the Building Authority has agreed to borrow monies in an amount not to exceed $4.5 Million Dollars plus capitalized interest, if any, to be utilized for the construction of the Conference Center which is dedicated and operated for the use of the public; and WHEREAS , in order to induce construction of the Conference Center the Tax Increment Finance Authority of the City of Lansing has agreed in an Agreement dated between the Tax Increment Finance Authority, Building Authority and City of Lansing to pay to the Building Authority tax increments derived from the development within the Development Area • as defined in the Development Agreement; and NOW, THEREFORE, in consideration of the promises and obligations herein set forth, it is mutually agreed between the City, Lansing Building Authority and Company as follows : 1 . PROPOSED PROJECT SCOPE. Subject to the timeframes and conditions of this Agreement, the Development Agreement and the • plans and specifications approved by the City and the Building Authority, the Company on behalf of the Building Authority shall design, construct and finish a Conference Center suitable for continual use of a not less than 30, 000 square foot. Said center shall include adequate pre-function area, storage, bathroom facilities , heating and ventilating equipment, sound and lighting equipment, and audio visual equipment for conferences of up to 2 , 000 people. The Conference Center shall be dedicated to the use of the public and operated on a non-discriminatory basis. 2. GOVERNMENTAL APPROVALS. The Company and its agents , contractors (general or sub) shall be solely responsible for obtaining all permits and licenses necessary for the construction and equipping of the Conference Center. The Company shall be solely responsible for paying the cost of the licenses or permits. City and Building Authority shall assist the Company in . obtaining the permits and licenses necessary for the construction and equipping of the Conference Center but said assistance shall not be financial in nature. . 3. . SURVEY. The Building Authority shall cause to be prepared and pay for a survey showing by metes and bounds the site on which the Conference . Center: i.s - to . be located which site is set forth as Parcel C in the attached Exhibit A. Such survey shall be a current boundary survey prepared and certified . to City, Building Authority and Company by a registered land surveyor acceptable to the City, Building .. Authority Company and the Title Company insuring said title . 'to site. Such. 'survey shall be furnished to City, Building Authority, C-ompany . and. the_.:Title Company, in form acceptable to each of them, showing the .baundarie-s by 'metes and bounds of all improvements thereon and encroachments, . easements or rights. of way (of record or visible on the ground) , location of dedicated streets or alleys , and sufficient to permit removal of any survey exception in the Owner ' s Title Insurance Policy. Permanent iron pins or other monuments shall have been installed by the surveyor and shown on the survey. Acreage of conference center parcel shall be certified by the surveyor. The approved survey is hereinafter called the "Survey" . 4. APPROVAL OF PLANS . In addition to satisfaction of the contingencies set forth in the approved Development -Agreement: A. Company shall have submitted Preliminary Plans and Schematic Plans for the construction and equipping of the Conference Center satisfactory to and approved by the Building Authority and the City prior to the commencement of construction of the Conference Center. B. Company shall have executed documents and any supplemental agreements required in connection with the public financing of the construction and equipping of the Conference Center and evidence of satisfactory financing of the construction of the Hotel and full service kitchen by the Company shall have been received and approved by the City, Building Authority and TIFA. 5. TIMEFRAME TO CONSTRUCT. Company shall commence construction of the Conference Center no later than 180 calendar days after commencement of construction of hotel and shall complete construction within twelve (12) calendar months thereafter. For purposes of this Agreement the phrase "commencement of construction" shall mean excavation to design footing depth. 6. DELIVERY OF POSSESSION TO PROPERTY. Possession of the Conference Center site as identified as Parcel C in Exhibit A of the approved Development Agreement shall be delivered to Company as soon thereafter as acquisition and the necessary street and alley vacations have been completed by the City and/or Building Authority. In order to expedite the commencement of construction by Company, the property necessary for the construction of the Conference Center may be delivered for possession to Company in phases that are mutually agreed to by the parties. 7. ADDITIONAL OBLIGATIONS OF COMPANY. A. Evidence of Contract (s) and Purchase (s) . Prior to commencement of construction or equipping of any portion of the Conference Center, the Company shall ,- at no cost to the City or Building Authority, furnish to City and Building Authority, a copy of each executed contract regarding construction or equipping with respect to each portion of the Conference Center . Prior to purchasing any equipment for the full service kitchen, the Company shall furnish an itemized list to the City and Building 'Authority identifying the equipment to be purchased. B. Evidence of Performance Bond and Payment Bond, Selection of General Contractor. The General Contractor selected by Company shall furnish to the City and the Building Authority prior to commencement of construction a performance bond and a payment bond in an amount -3- equal to the contract price for complete construction and equipping • cost of the Conference Center as verified pursuant to the Development Agreement. Such bond or bonds shall name Company, the lending institution, if any, and the City and the Building Authority as parties insured against risk or failure by the General Contractor and any of its subcontractors . Company agrees that any General Contractors selected by the Company to construct the Conference Center shall be an independent construction firm and not owned or operated by the Company. C. Submission of Revised Preliminary Plan. At any time during the construction of the Conference Center, the Company may submit to the City Council and the Building Authority proposed revisions in the approved- Pre_liminary_Plan..-in order-_to ..enhance the achievement of the objectives of the parties .to this Agreement, to respond to financing requirements , and to improve and refine the Center. The City Council- .and Building Authority shall indicate their approval or further requirements in writing within thirty (30) days from the date of receipt of the proposed revisions in the Preliminary Plan; provided, however,- -that that . :the City Casril "and= Building Authority shall approve such revised Preliminary Plan unless they reasonably find that such revisions would do any one or more of the following: impair the objectives of the parties to this Agreement, impose substantial_. a__dditional_ _f_inancial burdens on the City and Building Authority, or adversely affect the concept of the Conference Center as approved:b�the_Ci 1_ Bui ldin-g:-Authority_.and Company. D. Submission of Design Development Documents . Company, at its sole cost, shall or have prepared Design Development Documents for the Conference Center in accordance with the approved Preliminary - Plan and the approved Schematic Plans for submission to the City Council and Building Authority no later than six (6) months from the date of execution of this Agreement. Design Development Documents shall consist of drawings and other documents to fix and describe the size and character of the Conference Center as to structural , mechanical and electrical. systems, materials , furniture , fixtures and equipment and other such essentials as may be determined by the City Council , Building Authority and the Company to be appropriate. The City Council and Building Authority shall approve, disapprove , -4- • or impose further requirements with respect to the submitted Design Development Documents , provided, however, that if the submitted Design Development Documents conform with the approved Preliminary Plan and the approved Schematic Plans , such approval shall not unreasonably be withheld. . The Building Authority shall approve the Company ' s selection of -1) all furniture, fixtures and equipment for the Conference Center and 2) the furniture, fixtures of equipment financed by the bonds issued by the Building Authority and utilized in the full service kitchen. Such approval shall not be unreasonably withheld. E. Submission of Changes in Design Development Documents . The Company may, at any time during implementation of this Agreement, submit to the City and Building Authority proposed changes in the Design Development Documents in order to enhance the achievement of the objectives of the parties to this Agreement, to respond to. financial requirements, and to improve and refine the Conference Center. The City Council and Building Authority shall indicate their approval or further requirements in writing within thirty (30) days from the date of receipt of the proposed revisions in the Design Development Documents; provided, however, that the City Council and Building Authority shall approve such revised Design Development Documents unless they find that such revisions would do one or more of the following: impair the objectives of the parties to this Agreement, impose substantial additional financial burdens on. the City and Building Authority, or adversely affect the operation of the Conference Center. F. . Submission of Construction Drawings and "As-Built" Drawings The Company may utilize either a "fast-track" , construction procedure or a "design-build" construction procedure in building the Conference Center contemplated by this Agreement. In such event, Company shall file with the City and Building Authority copies of detailed construction plans prior to commencement of each phase of construction at no cost to the City and Building Authority. After completion of construction, the Company will file with the City and the Building Authority copies of the "as-built" drawings at no cost to the City or Building Authority. G. Progress Reports . During the period subsequent to the -5- • execution of this Agreement but prior to commencement of construction of the Conference Center, the Company at no cost to the City and/or Building Authority shall advise the City and Building Authority regarding any information having a bearing upon the City ' s and Building Authority ' s interest or performance under this Agreement, and, after date of commencement of construction by Company, Company shall file at no cost to the City or Building Authority with the City and Building Authority monthly progress reports during the course of construction and equipping of the Conference Center. A copy of the monthly progress reports shall be furnished at no cost to the City Clerk. H. Number of Copies . All documents shall be submitted in triplicate, to the City and Building Authority and at no cost to the City and Building Authority. I . Demolition. Company shall at its sole expense be responsible for the demolition of any and all structures located on the site for the Conference Center as described as Parcel C .in Exhibit A. J. Construction of Public Sidewalks , Curbs , Gutters and Landscaping. The Company shall construct immediately adjacent to the public rights of. way, sidewalks , curbs , gutters , and landscaping where required - pursuant to the. approved Site Development Plan as identified . in the Development Agreement provided that Federal funds and state funds are unavailable for said construction. G K. -Hotel Service Drive. Company shall at its sole expense construct the service drive located on the east side of the Hotel as set forth in Exhibit E of the Development Agreement which service- drive shall- be between Larch Street and the Hotel and running parallel to Larch Street. L. Private Drive. Company shall at its sole expense construct a private drive between the Hotel , full service kitchen and Conference Center on the north and the Public Site on the south which private drive connects Larch and Cedar Streets. 8. ADDITIONAL OBLIGATIONS OF THE BUILDING AUTHORITY AND CITY. -6 At no cost or expense to the Company, City and Building Authority shall do the following: A. Site Acquisition and Preparation. The City and Building Authority shall undertake and carry out, but may retain Company as their agent 'for site acquisition and preparation of site for the Conference Center as identified as Parcel C in Exhibit A of the Development Agreement. The City and Building Authority shall vacate and/or prepare any public streets and alleys as required pursuant to the approved Site Development Plan as defined in the Development Agreement. Site preparation of the property shall consist of the following (unless the City and Building Authority and Company hereafter agree in writing that any such preparation shall not be done, or that it shall be done subsequent to conveyance) : 1 . Removal of Utility Lines. Subject to City budget process and City Capital Improvements schedule, the removal or abandonment (where abandonment in place will have no adverse effect on the construction of the Conference Center and is agreed upon by Company) by the City or public utility company of all utility lines , - installations , facilities, and related equipment within or on the parcels which are necessary, in the City' s and Building Authority' s sole determination, for the construction of the Conference Center. B. Relocation and Installation of Utilities . Subject to City budget process and City Capital Improvements schedule, the City as provided in the Site Development Plan as defined in the Development Agreement, shall relocate, abandon or install or cause to be relocated, abandoned, or installed, such sanitary sewers,, storm sewers , drains, water, steam, electrical distribution lines , installations and facilities , which in the City' s and Building Authority' s sole discretion, are necessary to be relocated, abandoned, or installed within public rights of way in connection with the construction of the Conference Center. All such utilities shall be provided by underground service. The City shall install or cause to be installed, without connection or tap-in charge, service connections at locations as provided in -the site Development Plan as defined in the Development Agreement and public utility lines (sanitary sewer, and storm sewer) -7- owned by the City. C. Construction of the Service Drive for Conference Center and Public Access Drive for Parking Ramp. Company shall construct for the Building Authority as part of the $4. 5 Million financial limitation set forth in Article II (B) of the approved Development Agreement, a service drive located on the west side of the Conference Center as set forth in Exhibit E of the Development Agreement which service drive shall be between Cedar Street and the Conference Center and run parallel to Cedar Street. In addition, City and Buildity Authority shall- at their- sole cost construct a public access drive to the Parking Ramp which shall be located between the Parking Ramp on the north and the Hotel , full service kitchen and Conference Center on the south and connecting Cedar and Larch Streets as set forth in Exhibit E of the Development Agreement. D. Other Actions . The City and Building Authority shall take such actions as may be necessary or desirable to achieve the objectives of this Agreement, and shall assist the Company in rezoning, -issuing permits , adopting resolutions and ordinances . E. Certificate of Completion. Upon request of the Company, and only upon. the Building Authority ' s and City ' s determination that the Company has fully completed its obligations under this Agreement, the City and Building Authority._shail._issua.a certificate of completion (hereinafter called "Certificate of Completion" ) , in recordable form acceptable to the Company, certifying that the obligations for construction •of the Conference Center have been satisfied in full . 9 . NONDISCRIMINATION AND PREVAILING WAGE. Company agrees in awarding contracts for the construction and equipping of the Conference Center not to discriminate on the basis of race, color , religion, sex, age, height, weight, marital status or national origin. Company shall require the aforementioned non-discrimination clause to be contained in all contracts the Company, its General Contractor or any Subcontractors enter into for the construction and equipping of the Conference Center. The Company shall require the General Contractor and all of its subcontractors to pay prevailing wages to the employees utilized in the construction of the Conference Center as provided in Section 2-57 of the Lansing Code of Ordinances . -8- 10 . MUTUAL RIGHTS OF ACCESS. A. Company Prior to Conveyance. Prior to transfer of possession to Company,. City or Building Authority shall permit representatives of Company to have access to any part of the site for the Conference Center to which City or Building Authority holds the right of possession at all reasonable times to obtain data and make various tests concerning the property necessary to carry out this Agreement. B. City After Transfer of Possession. . After transfer of possession of property to Company, Company shall permit representatives of City or Building Authority to have reasonable access to the Property at all reasonable times for the purposes of this Agreement, including, but not limited to, inspection of all work being performed in connection with construction. C. No Charge. No compensation shall be payable nor shall any charge be made in any form by any party for the access provided in this Section. 11 . UNAVOIDABLE DELAYS . The time for performance of any term, covenant, condition, or agreement of this Agreement shall be extended by any period of unavoidable delays . In this Agreement, "unavoidable delays" means beyond the reasonable control of the party obligated to perform the applicable term, covenant, condition or agreement under this Agreement and shall include, without limiting the generality of the foregoing, delays attributable to acts- of God, any other party to this Agreement (for example, a delay in transfer of possession) , strikes , labor disputes , governmental restrictions , court injunctions , riot, civil commotion, acts of public enemy, and casualty. 12 . RESTRICTIONS AGAINST TRANSFER OR ENCUMBRANCE. During the term of this Agreement, Company shall not make or allow to be made any sale, assignment, conveyance, lease, transfer, mortgage, encumbrance, or lien of or upon the interest in the Conference Center or property upon which the Conference Center is situated or the equipment owned by the Building Authority and located within the full service kitchen whether by express agreement or operation of law, without the prior written approval of the City Council and -9- • Building Authority, which shall not be unreasonably withheld or delayed. 13. INSURANCE AND INDEMNIFICATION. A. Prior to commencement of construction under this Agreement, Company shall obtain and keep in full force and effect during construction of the improvements , an all-risk builder ' s risk insurance policy as to the Property on which construction is occurring with coverage equal to •the total amount of Company' s contract for the construction and equipping of the Conference Center . Such builder ' s risk insurance policy shall name the City and Building Authority as an additional insured. Company shall also obtain and keep in full • force and effect during construction of its improvements , for the benefit of City and Building Authority, an owner ' s comprehensive protective liability insurance policy with personal injury coverage of at least Five Million Dollars and property damage coverage of at least One Million Dollars . Such policies of insurance shall be written by insurance companies authorized to do business in the State. Prior to commencement of construction, Company shall file with the City Clerk .a certificate of insurance setting forth that all coverages required herein are in full force and effect and providing_ that City and Building Authority will be given twenty (20) days written notice prior to. termination or cancellation of such coverage. B. Company shall be solely responsible for and shall indemnify, defend and hold harmless the City and Building Authority, its agents , officers and employees from and against any ,and all claims , suits , damages and losses , specifically including, but not limited to those for loss of use of property, for damage to any property, real or personal , .-for injury .to or the death of any .person including but not limited to employees and officers of the City and Building Authority and for all liabilit8ies whatsoever including related expenses and actual attorneys fees in any way sustained or alleged to have been sustained, directly or indirectly, by reason of or in connection with: 1) the performance - of the work by or any other activities of the Company, its employees or agents , officers , General Contractors and subcontractors, including but not limited to the construction, -10- equipping and/or any necessary activity conducted by the Company, its employees , agents, officers , General .Contractors and subcontractors in constructing and equipping the the Conference Center and being in possession of the Conference Center, whether such claims , suits , damages , losses and liabilities are based upon or result in whole or part from the active or passive negligence of the City or Building Authority, its employees , agents or officers or City ' s or Building Authority' s strict liability in tort, breach of warranty, breach of contract, duty to indemnify or any other basis or cause whatsoever whereby the City-and Building Authority might be held liable; provided, however, that the foregoing shall not be construed to be an agreement to indemnify the City and Building Authority against liability for damages caused by or resulting from the sole negligence of the Building Authority or City, its agents , employees or officials , under circumstances whereby said agreement would be in violation of Michigan Public Act 1966 No. 165 , Section 1 (MCLA Section 691 . 991) , if applicable. This provision shall extend beyond the term of this Agreement. 14 . TERMINATION AND REMEDIES . A. In General . Except as otherwise provided in this Agreement, in the event of any default in or breach of this Agreement, or any successor to such party, such party (or successor) shall , upon written notice from any other party, proceed immediately to cure or remedy such default or breach, and, in any event, within sixty (60) days after receipt of such notice unless such default or breach cannot with reasonable diligence be cured within such period in which case said defaulting party shall commence such cure within such period and diligently proceed to cure such default. In case such action is not taken or not diligently pursued, or the default or breach shall not be cured or remedied within a reasonable time, the aggrieved party may institute such proceedings as may be necessary or desirable in its opinion to cure and remedy such default or breach, including, but not limited to, proceedings to compel specific performance by the party in default or breach of its obligation. Construction and equipping of the Conference Center in accordance -11- with the terms and conditions of this Agreement is the essential and unique consideration for this Agreement and therefore, the City and Building Authority may in the event of legal proceedings , seek remedies to compel the specific performance of the Company. 15 . OTHER RIGHTS , REMEDIES; NO WAIVER BY DELAY. A. The City, Building Authority and Company shall have the right to institute such actions or proceedings as they may deem desirable for effectuating the purpose of this Agreement, provided that any delay in instituting or prosecuting any such actions or proceedings or otherwise asserting such rights , shall not operate as a waiver of such rights to, or deprive it of or limit such rights in any way (it being the intent of this provision that a party should not be constrained, so as to avoid the risk of being deprived of or limited in the exercise of any remedy because of concepts of waiver, laches , or otherwise, to exercise such remedy at a time when it may still hope otherwise to resolve the problems involved; nor shall any waiver in fact made with respect to any specific default be considered or treated as a waiver of any rights with respect to other defaults or with -espeeto--the =particular default except to the extent specifically waived in writing. B. Except as expressly provided otherwise in this Agreement, the rights and- remedies of the parties to this Agreement, whether provided by - law or by this Agreement, shall be cumulative, and the exercise by any party of any one or more such remedies shall not preclude the exercise of it, at the same or different times , of any other such remedies for the same default or breach or of any of its remedies for any other default or breach by any other party. No waiver made by any such party with respect to the performance, or manner or time thereof, of any obligation of any other party or any condition to its own obligation under this Agreement shall be considered a waiver of any rights of the party making waiver with respect to • the particular obligation beyond those expressly waived in writing and to the extent thereof, or a waiver in any respect in regard to any other rights of the party making the waiver of any other obligations . -12- 16 . CONFLICT OF INTEREST; CITY' S REPRESENTATIVES NOT INDIVIDU?.LLY LIABLE. No official or employee of the City or Building Authority shall have any personal interest in this Agreement, nor shall any such person voluntarily acquire any ownership interest, direct or indirect, in the legal entities which are parties to this Agreement. No official , -. or employee of the City or Building Authority shall be personally liable to Company or any successor in interest, in tie event of any default or breach by the City or Building Authority cr for any amount which become due to Company or its successors under this Agreement. 17. APPLICABLE LAW, SEVERABILITY AND ENTIRE AGREEMENT. This Agreement shall be governed by and construed in accordance with the laws of the State of Michigan. If any provisions of this Agreement or the application thereof to any persons or circumstances shall , to any extent, be invalid or unenforceable, then (unless in the judgment of the party or parties thereby adversely affected such provisions was a material part of the consideration for their entering into this Agreement, that without it they would not have entered into this Agreement) the remainder of this Agreement, or the application of such provision, or portion thereof, and each provision of this Agreement shall be valid and enforceable to the fullest extent permitted by law. This Agreement sets forth the entire understanding between the City, Building Authority and Company, with respect to its subject matter , there being no terms , conditions , warranties or representations with respect to its subject matter other than that contained herein. This Agreement shall be binding upon and, shall inure to the benefit of the parties hereto, their respective - successors and assigns. 18 . AMENDMENTS TO AGREEMENT. This Agreement or any term thereof may not be altered, changed, modified or amended orally, but only by an agreement in writing and signed by the parties hereto. 19 . THIRD PARTIES . Except as expressly provided otherwise in this Agreement, the provisions of this Agreement are for the exclusive benefit of the parties hereto and not for the benefit of any other persons , as third-party beneficiaries or otherwise, and this Agreement shall not be deemed to have conferred any rights express or implied, .upon any other person. -13- 20. - NO PARTNERSHIP CREATED. This Agreement specifically_ does not create any partnership or joint venture between the parties hereto, or render any party liable for any of the debts or obligations of any other party. 21. TIME IS OF THE ESSENCE. The parties understand and agree that time is of the essence with regard to all the terms and provisions of this Agreement. 22 . FORMALITIES AND AUTHORITY. The parties hereto represent and warrant that they are validly existing and lawful entities with the power--and authorization to --execute and perform this Agreement. The headings set forth in this Agreement are for convenience and reference only, and in no way define or limit the scope or content of this Agreement or in any way affect its provisions . 23 . NOTICES AND DEMANDS . A notice, demand, or other communication under this Agreement shall be sufficiently given or delivered if it is deposited in the U.S . mail , registered or certified mail , postage prepaid,'=return receipt requested; or delivered personally: • - -( )---In-- the -ca-se-oof Company to:- - W. Warren Barberg,- President - Ba-rberg & Associates 307 South Farwell Street • Eau Claire, Wisconsin 54701 (ii) In the case of City to: • Mayor and City Clerk Ninth--F 1-o:o.r--,---City- Hal 1- - Lansing,- Michigan 48933 Public Service Director Lansing Building Authority Seventh Floor, City Hall Lansing, Michigan 48933 or to such other address , within the United States , with, respect to -14- - a paz.ty as- that party may from time to time designate in writing and forward to the other as provided in this Section. A copy of any notice, demand or other communication under this Agreement given by a party under this Agreement to any other party under this Section shall be given to each other party to this Agreement. IN WITNESS WHEREOF the parties hereto have set their hands this date first above written: -15- WIT "'SSLS CITY OF LAN CT 'G By Terry n , Mayor By Rita M. auman, City Clerk LANSING BUILDINGAUTHORITY By____________________O Howard G. McCaffery • Its Chairman • B & A OF MICHIGAN, INC. By LX / • Cl • Its ___i t) APPROVED AS TO FORM ONLY L41�- -1 P. P.not Chief Assistant City Attorney • Certification as to the availability of funds for the performance• of this Agreement in Accou t No.1v Step n 'v'. . Duarte, City Conzrolier -16-