Loading...
HomeMy WebLinkAbout1994 E Michigan Ave Revitalization Plan Dept of Planning and Neighborhood DevelopmentDocument: 1994 E. Michigan Ave Revitalization Plan Department of Planning and Neighborhood development • 0 • • 'City : fLIOOPI Department of Planningi�iboro oerit I ea s Qr�ff � n A ou cesIT nncl r 1 EAST MICHIG--•.A","t." �,w.•�x �.-... _ .,�:.., .:vim'-�; ® DEARDORFF DESIGN RESOURCES'/ inc. Land Planning Ur'ba.-n Design July 8,1994 Ms. Eleanor K. Love Planning Manager Department of Planning and Neighborhood Development City of Lansing 119 Washington Square Lansing, MI 48933 Dear Eleanor: We are pleased to submit the final draft of the East Michigan Avenue Revitalization Study. We are grateful for the opportunity to be a part of the ongoing planning'arid urban design improvements proposed for the Eastside. This plan, as you are well aware, was developed With local participation as a key emphasis. We very much appreciate the work done by the members of the East Michigan Avenue Revitalization Study Committee and we also appreciate the helpfulness and support of you and your staff. We look forward with anticipation to the implementation of this plan. Sincerely, Howa#—D-eardorff IT President, Deardorff Design Resources/inc. • 920 Long Blvd., Suite 17, Lansing, Michigan 48911 517 694 7595, FAX 517 694 7596 • Submitted by: Deardorff Design Resources/Inc. Corbin Design Reid, Cool & Michalski, Inc. July, 1994 EAST MICHIGAN AVENUE 0 • 0 Deardorff Design Resources/Inc. would like to acknowledge the efforts of the members of the East Michigan Avenue Revitalization Study Committee, and the City of Lansing Department of Planning and Neighborhood Development whose ideas and discussions have contributed significantly to this project. EAST MICHIGAN AVENUE REVITALIZATION STUDY COMMITTEE: Mr. William Allen Mr. Jon Anthony Mr. Richard Barry Mr. David Berridge Ms. Mary Clark Mr. Joe Damore Ms. Beth Donaldson Mr. Vernon Fountain Mr. Joseph Guillean Mr. Robert Johnson Mr. Patrick Lindemann Mr. Jim Prister Mr. Ron Thelen Mr. Shelton Tyson Mr. Bill Vincent Ms. Mary Margaret Woll CITY OF LANSING, DEPARTMENT OF PLANNING and NEIGHBORHOOD DEVELOPMENT: Dennis Sykes Director of the Department of Planning and Neighborhood Development Eleanor Love Planning Manager Doris Witherspoon Senior Planner • PURPOSE AND ORGANIZATION 1 PLANNING PROCESS 3 PROBLEM/OPPORTUNITY 5 PLANNING/URBAN DESIGN CONTEXT 7 URBAN DESIGN 11 THE APPENDIX 18 U • • • • • EAST MICHIGAN AVENUE REVITALIZATION PLAN 1. PURPOSE AND ORGANIZATION The central purpose of this planning effort was to provide a catalyst for the economic and aesthetic revitalization of East Michigan Avenue. It has been a cooperative effort involving all those with vested interests within the study area. The East Michigan Avenue Revitalization Plan utilized a process that insured the maximum opportunity for participation by residents who lived in or adjacent to the study area, local East Michigan Avenue Business owners, representatives of the Lansing School District, and Sparrow Hospital leadership. (see Figure 1) I • A task force committee was assembled with careful thought to include a truly representative and balanced mix of the various interests and concerns of those listed above. This planning process featured an emphasis on inclusion and participation. This planning report is organized in five sections and an appendix: 1. PURPOSE AND ORGANIZATION: A brief purpose statement and the overall outline of the study. 2. PLANNING PROCESS: A description of the workplan and the planning process 3. PROBLEM/OPPORTUNITY: A succinct statement summarizing study participant's definition of planning assumptions, study goals, and key issues and opportunities at hand 4. PLANNING/URBAN DESIGN CONTEXT: The development of alternative vehicular circulation and land use alternatives to define the planning context for the redesign of East Michigan Avenue within the study area 5. URBAN DESIGN: A specific urban design vocabulary for signage, lighting, street furnishings, planting, paving in the context of future development opportunities and implementation strategies 6. THE APPENDIX: Documentation of committee meetings, public hearings, feedback • forms, and relevant data used in the study It should be kept in mind that the ideas expressed in this plan are conceptual and will be subject to change as additional study and planning work is developed. In particular, a comprehensive traffic study will be commissioned in the near future to evaluate the traffic impact of the recommendations of this study and the broader impact of Sparrow Hospital expansion in the context of the East Side. The plan does, however, define the preferences of the participants at this point in time. • 2 • 2. PLANNING PROCESS The planning process involved a workplan generated by the consultant and reviewed both at the task force committee level and at the initial public hearing. Figure 2 below defines this work plan. EAST MICHIGAN AVENUE REVITALIZATION STUDY DDR TEAM/WORK PLAN ■■■■■■■■■■■■■■■■■ ■■i■ ■■ram ��r�■ ■■M■ ■■■■ ■■■■ ■■H ■■tom■■■■■■�■■■■■■■■■■■■■■ ...... - - LM ■■E7■■■■■■H■G1■■■■■1•■■■■■■� ■■k�■■■■■C�r7C ■■■■■�■■■■�■ ■■o■�■■■■■■■■■■■r�■■u■■ MWTCFTIM ■■■■■■■■■■■■■■■■■■■■■■■■ *COMMmsE MEW Dumxmr DMKK ZWOtRCE&U& Q. MMXW0XK&W/Mv?Ew ?ft6 d2A&V* Figure 2 The overall process involved four main steps or tasks; project start up, the generation of alternatives to develop a consensus direction for the traffic and land use patterns, and the generation and review of • the recommended urban design by the task force committee and the through public hearings, and the development of a strategy for implementing the plan. 40 • Project Start Up This phase of the process involved reviewing existing plans and proposals developed relative to the study area. These included the following: LANSING'S EAST SIDE: YOUR INVITATION TO ACTION: Prepared in 1974 by the East Side Planning Association NORTH-EAST AREA COMPREHENSIVE PLAN: Prepared in 1994 by the City of Lansing's Planning Division and the citizens of the North-East Area. GREEN OAKS AREA DEVELOPMENT PLAN: Prepared by the Green Oaks Target Association in 1986 BOYS TRAINING SCHOOL PROPERTY PLANNING AND DEVELOPMEIYf STUDY: Prepared in March of 1992 by Deardorff Design Resources for the City of Lansing's Department of Planning and Municipal Development SPARROW HOSPITAL LONG RANGE PLAN: Prepared by Deardorff Design Resources for Sparrow Hospital in September of 1992 PARKING & TRAFFIC STUDY FOR SPARROW HOSPITAL: Prepared by Carl Walker Engineers for Sparrow Hospital in October of 1992 These documents were thoroughly reviewed in terms of relevance to the proposed revitalization within the study area, and to provide useful and accurate data on vehicular and pedestrian traffic, as well as proposed and existing parking. A second task of the project start up phase was to define assumptions, goals, and key planning issues and opportunities. This was one of the more important steps in the process because it defined and documented expectations for all participants, thus giving the consulting team a more precise definition of the task at hand. Section 3, PROBLEMS AND OPPORTUNITIES documents these findings. • Conceptual Alternatives The next phase of the process involved the generation of conceptual land use and vehicular circulation plans. The goal of this phase was to develop a consensus direction for the recommended planning and design framework thus ensuring an urban design plan for East Michigan Avenue that was responsive to the context of the overall neighborhood/corridor setting. East Michigan Avenue Design Treatment The final phase of the planning process was to generate a specific urban revitalization plan and design that promoted revitalization and established a streetscape and building facade character for the corridor. A second task of this phase was to develop preliminary cost estimates and a strategy for implementation. is 4 • • • PROBLEM/OPPORTUNITY • 3. PROBLEM/OPPORTUNITY Assumptions and Goals Workshops were staged by the consultant to identify the basic assumptions of the study at the Task Force Committee level and through a Public Hearing held on March 23, 1994 at Eastern High School. The following are the Assumptions that resulted: Please note that these assumptions and goals are not prioritized in -these •listings. PLANNING ASSUMPTIONS • The plan will consider existing conditions, and future conditions for the short term (5 years) and long term (20 years). • The BTS Plan will proceed as adopted by Council. • The East Michigan Avenue Revitalization Plan will be coordinated with Sparrow Hospital expansion plans. • The three schools (Eastern, Pattengill, and Bingham) will continue to function within the study area. • no existing residential neighborhoods will remain and this plan will define design standards that address the interface between commercial and residential uses. • Fast Michigan Avenue will remain primarily in commercial use. • The planning work will provide for citizen and institutional participation. Concurrent with the development and adoption of Planning Assumptions, Planning Goals were established and finalized at the Public Hearing. PLANNING GOALS • The plan should minimize traffic and parking conflicts between businesses, residents, schools, and Sparrow Hospital traffic. • The plan will encourage the development of off street parking and provide a balance between business and residential parking opportunities. • The plan should identify traffic impacts at intersections along East Michigan Avenue within the study area and locations where significant problems will occur beyond the study area. • The plan should minimize non local, "cut through"traffic. • The plan should enhance pedestrian safety. • The plan should create a "Gateway" image for both the Capitol and, traveling east, the East Side of Lansing. • The plan should mitigate the impacts of business activities on the residential neighborhoods including softening the visual image of parking and buildings that face residential neighborhoods and the schools, controlling blowing debris, and noise. • The plan should encourage facade improvements along East Michigan Avenue. 0 . • Ibis plan will serve as a pinto typical guide for the revitalization of retail businesses and their relationship to adjoining residential neighborhood for the entire length of Fast Michigan Avenue. • The plan should encourage the retention of existing businesses as well as attract new businesses to East Michigan Avenue. • The plan should encourage the conservation and revitalization of residential neighborhoods. • The strsstscape design will be configured to harmonize with the streetscape improvements along Michigan Avenue west of the study area. Finally, as a third part of the March..25, 1994 Public hearing, participants reviewed and expanded a list of the following specific Issues and Opportunities: ISSUES AND OPPORTUNITIES • Conflict between Sparrow Hospital, Pattengill and Eastern schools, and residential neighborhood traffic on Jerome Street • Hospital staff parking along Jerome Street east of the Hospital • Visual Impact of proposed Hospital parking deck along Eureka Street • Studio De Dance need for drop off and pick up off Jones Street and concern regarding closing Jones Street in tension with the need to expand the Bingham School playground • Problem of "bump outs" at intersections on Fast Michigan Avenue with conflict between pedestrian safety (narrowing roadway) and smooth vehicular traffic flow • Opportunity to separate Hospital from residential neighborhood traffic at Jerome and Holmes as per BTS plan. • Opportunity to provide visual screening of parking aloe the edges of Sparrow Hospital parking areas along Pennsylvania and Fast Michigan Avenue • Problem of Holmes Street off set intersection at Fast Michigan Avenue These planning assumptions, planning goals, and specific issues and opportunities were used to direct the consultant and the Task Force Committee as they worked together to implement the work plan and produce the recommended plan for the revitalization of this segment of East Michigan Avenue. Figure 3 graphically depicts the issues and opportunites involved with the study area. 0 6 0 I I r 1 , 1 + 3 I +I Hi i I I i� , 3 • I1 ,I � I i Psi; a I . ,U U U W-P• U U uu L-J!..L-kiIL__J fu 1J U LI L.1 UL-3-L-r Slamresm 1 1 STT i D. E5 o am IN . P32 16 a 0 �J :: a �L❑ : ca UU . 71 o==` o- ❑ �a Qa`( o� C� IJ -EASTERN—HIGH SC �1 =Aum --- A or J C-1 ❑ ; C - - P 241' x ti nu 1 a.hrx rra U I .-- 1J0 i_ .p SPAR fi'1'a`�•'•""F"a '�« .^..�'�� I i` _.. zt�:Y"�a:C.a?k.'V� '�iit�3�L`::i.-fa 1' "'Y70 r$ O l ewra+u+ E '• C s 1. z - STREET t'• Issues and Opportunities 1. Conflici between Sparrow Hesp)taL PatengH) and Fasten) i Opportunity to separate Hospital from residential neighborhood schools, and residential neighborhood traffic on Jerome Street traffu at Jerome and Holmes as per M plan. 2 Hospital staff At— aloe. Jerome Strut eat of the Hospital 7. Opportunity to provide visual screening of parking along the o mi r —f7- o�it P 22 nb r-] f 11 r Ir i ❑ rf'7 0 ❑ r X n3" IrI O -Era � _... -•- rn 0 -. i EUREKA .�. p. " J. Visual Impact of proposed Hospital packing deck along EaTeka edges of Sparrow Hospital parking area stung Pennsylvania rat 7a ;e Jt[ lit �: �+� 1�r %•� 1Rt; .r+ •• Sued and East Mkitigao Avenue .He ' .: Le } 4. Studio De Dance need for drop off and pick op off )ones Street S. Problem of Holmes Street off set intersection at East Mirhtgan • and concern regarding dosing Jones Street in tension with the Avenue s need to expand the Hingham School playground rn... ill :'! a �L TV S. Problem of'bunp oat' at intersections on East Michigan _] g p ♦�. lit _ I Avenue with conflict between pedestrian safety (narrowing fly iE • roadway) and smooth vehicular traffic flow EXISTING AM PEAK EXISTING PM PEAK HOUR TRAFFIC VOLUMES HOUR TRAFFIC VOLUMES EAST MICHIGAN AVENUE N REVITALIZATION PLAN ISSUES AND OPPORzUNMES ANALYSIS Lansing, Michigan DEARDORFF DESIGN RESOURCES/Inc LJ L_J o c too sou F Figure 3 0 • 4. PLANNING/URBAN DESIGN CONTEXT Alternative Concepts Using the previously generated Assumptions, Planning Goals and the Issues and Opportunities; the consultant generated three Alternative Land Use and Circulation Concepts. These concepts were reviewed and discussed first at the Task Force Committee level and then at a Public Hearing staged on April 28, 1994 at Eastern High School. The purpose of these alternative concepts was to deepen and sharpen participant's understanding of the trade offs involved in implementing the planning goals and addressing the menu of issues and opportunities. In order to assist participants, pros and cons were developed by the consultant for each concept. These materials and "feed back" forms were provided to all participants at the public hearing. The following are the alternative concept plans with evaluations provided to aid study participants in their deliberations and discussions. Figures 4, 5, and 6, shown on the following pages, graphically represent the Land Use and Circulation concepts. LAND USE AND CIRCULATION CONCEPT A This concept provides positive benefits: 1. ThIs concept eliminates cut through business and service traffic along Eureka Street and eliminates school and hospital traffic from Jerome Street east of Holmes. 2. It also reduces business traffic west of Pennsylvania on Jerome by bisecting Eight St. between Jerome and East Michigan and, between East Michigan and Eureka. 3. The plan separates Pattengill and Eastern traffic as well as Sparrow traffic from the schools by separating a Sparrow Hospital service loop from Jerome St. in front of Pattengill. 4. The plan preserves current land use patterns with either separation or shared use of parking for blocks involving multiple land uses. The following are negative impacts of this concept: 1. Creates the potential for Eureka Street to become a "bypass" for people wanting to avoid East Michigan traffic. 2. Forces residents south of Eureka to either Pennsylvania, Hosmer, or Clifford St. to go north to East Michigan Avenue. 3. This plan will create heavier traffic on Marshall because of the elimination of Jerome Street as a through street to Patiengill and Eastern schools, and Sparrow Hospital. LAND USE AND CIRCULATION CONCEPT B This concept provides the following benefits: 1. The concept eliminates service and business traffic for residents along Eureka between Bingham and Holmes while providing some relief to the Pennsylvania/Michigan intersection by providing a bypass via Eureka and Bingham. 2. Separation of School and Hospital traffic. 3. Realignment of Holmes at East Michigan to provide a safer Intersection. 4. Using traffic diversions as shown on the plan, cut through traffic will be greatly reduced with major reductions of along Eureka and Jerome Strests. 0 7 The following are negative impacts of this concept: 1. While through traffic is eliminated for most people along Eureka Street, the residents along Eureka between Pennsylvania and Bingham would probably experience more cut through traffic. 2. In a similar fashion, more traffic would occur on Jerome between Pennsylvania and Eighth Street. 3. This plan would also create more traffic on Marshall and would likely increase traffic in front of Bingham School. LAND USE AND CIRCULATION CONCEPT C This concept provides the following positive benefits: 1. This concept eliminates cut through business and service traffic along Eureka Street while retaining access to and from Michigan Avenue for the Eureka St. Neighborhood through the use of a one way loop system. 2. The Sparrow Parking deck traffic will not impact the Eureka St. Neighborhood since both entrances and exits are separated from Eureka St. 3. The one way loop will allow the narrowing of Eureka St. between Bingham and Holmes, creating a larger green space buffer for the proposed parking deck. 4. Cut through traffic on Eighth is eliminated by divertma both north and south of Michigan Avenue. 5. The plan separates Pattengill and Eastern traffic as well as Sparrow traffic from the schools by separating a Sparrow Hospital service loop from Jerome St. in front of Pattengill. 6. The plan preserves current land use patterns with either separation or shared use of parking for blocks involving multiple land uses. The following are negative impacts of this concept: 1. Eliminates direct access to Pennsylvania Ave. by Eureka St for the Eureka St. residents between Bingham and Holmes. 2. This plan will create heavier traffic on Marshall because of the elimination of Jerome Street as a through • street to Pattengill and Eastern schools, and Sparrow Hospital. 3. The plan will not allow those dropping off and picking up children to have vehicular access to the Bingham School entrance from Eureka. 0 • • EAST MICHIGAN AVENUE REVITALIZATION PLAN LAND USE and CIRCULATION CONCEPT A /\_ Lansing, Michigan Figure 4 DEARDORFF DESIGN RESOURCES/Inc. „ E • • EAST MICHIGAN AVENUE REVITALIZATION PLAN LAND USE and CIRCULATION CONCEPT B Ad Lansing, Michigan Figure 5 DEARDORFF DESIGN RESOURCES/Inc. „ 0 Note: Traffic diverter proposed at Hosmer and Prospect intersections to separate residential neighborhood and local business traffic. • EAST MICHIGAN AVENUE REVITALIZATION PLAN LAND USE and CIRCULATION CONCEPT C jd\_ Lansing, Michigan Figure 6 DEARDORFF DESIGN RESOURCES/Inc. „ 3u • Framework Plan These three alternative concepts were evaluated by the task force committee and at the public hearing held on April 28, 1994 at Eastern High School. While the feedback from the public hearing did not strongly favor one alternative, there was a clear disapproval of Concept A. With further discussion with committee members and response to all feedback, a modified Concept C was generated. This concept was reviewed by the task force committee and approved at a meeting held on April 10, 1994. It was agreed that this plan would provide a conceptual framework and that the planning effort should shift to the more detailed design of East Michigan Avenue. Figure 7 is a summary of this Consensus Framework Plan. The features of the plan include the following: • The creation of four new businesses that would provide approximately 150 new jobs beyond those added by Sparrow Hospital Expansion. • The addition of 212 off street parking places and the removal of on street parking on East Michigan Avenue from Pennsylvania to Holmes Streets. (Loss of approximately 80 spaces.) • The closure of Eighth Street between East Michigan and Jerome Streets, and the removal of three residences to provide the opportunity for additional, business sustaining and creating parking. • Traffic will be diverted at Hosmer and Prospect to reduce business traffic in the Green Oak Residential Neighborhood. • Traffic will be diverted at the intersection of Eureka and Bingham, and at the intersection of • Eureka and Holmes to create a two way loop system that will serve Bingham School and Residents living on Eureka while eliminating hospital and business cut through traffic in the neighborhood to the south. • A business/service access alley would be created between Bingham and Jones Streets just north bf Bingham School to provide better access to parking and rear entrances to businesses on East Michigan Avenue, • The Boys Training School Property Plan and the Sparrow Master Plan will be accommodated by this planning framework. Three conceptual "tools" were created that could be used along the corridor for dealing with traffic conflicts between businesses and residential neighbors. The opportunity to divert traffic was demonstrated at intersections of Jerome and Holmes (proposed earlier in the BTS plan), at Eureka and Bingham, and at Eureka and Holmes. Figure 8, on the following page, illustrates how a typical vehicular traffic diverter would work. The purpose is to eliminate business and service vehicular traffic from residential neighborhoods while still providing relatively easy access for residents. The diverter islands could be locations for landscape features and pedestrian oriented signage with directions to schools, parks and neighborhood centers. A second tool involves creating business access/service alleys that provide linkages to parking and reduce the number of curb cuts along East Michigan Avenue. Strong visual barriers need to be erected to buffer residential and school areas from this traffic. These barriers could be masonry walls, wood fences, landscape buffers, or a combination of two or more of these measures. 9 • FUTURE HEALTHIEDUCATION COLLABORATIVE < ff z `S :... I I I Fri El �t- �.qq 7 7 1,7 .. ...... .. . . . ... .. . ..... ..... ;. 3 CHRISM' EVANGELICAL LUTHERANCHURCH; EUREKA i NOTE. Tiaffic'io be diverted at Hosm'er-and Prospect to reduce business traffic in reside"Atial `neighborhood EAST MICHIGAN AVENUE REVITALIZATION PLAN Lansing, Michigan 6-7-94 DEPARTMENT OF PLANNING AND NEIGHBORHOOD DEVELOPMENT Figure 7 :ing - to be removed fi Pennsylvania and ic flow.. f I I . ....... --- L r .... ..... . .... c. .. ... . .. ,JL L-I kJ C ..... ...... . .... . ...... . ..... LJ N NSENSUS FRAMEWORK PLAN DEARDORFF DESIGN RESOURCES/Inc. 0 go 100 200 • A third tool involves the taking of the remaining remnant of residential use on a block where all other uses are retail or business. While there is a strong commitment to preserving adjacent neighborhoods, maintaining two or three homes adjacent to business and related parking is not a feasible approach. The neighborhood preservation battle needs to be fought along clear lines. Where there are clear half blocks of residential, these homes should remain. A clear example would be between on the North side of Eureka between Hosmer and Pennsylvania streets. Each situation is different, but consideration should be given to the reality that some blocks along this corridor were lost a long time ago. Historically, much of East Michigan Avenue was residential five decades ago, but the reality of change must be accepted and dealt with pro actively. s The Consensus Framework Plan is a pro active recommendation that involved a participatory approach. It provides the basis for the more detailed urban design plan fort the East Michigan Avenue Corridor. Figure 8 IO 0 0 0. 5. URBAN DESIGN East Michigan Avenue Corridor Design The design of the East Michigan Avenue corridor was guided by several design principles which serve the goals defined by the public hearing, most specifically creating a "Gateway" image and encouraging economic revitalization. The design principle of simplicity was important, since the existing conditions in the study area have developed over many years with no overall plan to guide the growth. The result is inefficient traffic patterns, including multiple, confusing entrances and curb cuts, which do not utilize the available land resources to their potential. The plan, therefore, eliminates curb cuts wherever possible, consolidates and encourages shared use of parking lots, and provides a signage system which communicates to the users how the parking system works. Another design principle which guided the plan was unity. The study area contains a mixture of architectural styles which date from the turn of the century, to the proposed Sparrow Hospital expansion, which is currently in the design phase. There is little architectural unity on the street now, so our goal was to create a streetscape which would become a unifying context within which the current collection of architecture would exist in harmony with newer buildings in the future. This means that the proposed streetscape would not be distracting additional elements, but rather a collection of attractive elements which do not dominate the street. The purpose of these elements is to simplify and organize the circulation patterns on the street in an attractive way. Beautification of the street will not increase business or revitalize the corridor by itself. Revitalization occurs when the corridor is attractive, when businesses on the street have safe and adequate parking, and when the area is easily used and very accessible. The plan creates these conditions through signage, lighting, planting, and unified streetscape elements and • furnishings. Figure 25, found at the end of this section, is the Streetscape Plan. This plan shows the relationships of the streetscape .elements, the new parking and traffic circulation patterns, and depicts the overall organization of the design. Signage The signage system was developed to serve the purposes of unification and identification, and is composed of neighborhood identification signs, and a wayfinding system for the streetscape. The entire sign system was designed to be a unified system, using colors to identify specific geographic areas. Although the signs were designed for the East Side, and our study area in particular, the concept for the sign system considered the entire city of Lansing, and the way Lansing residents tend to identify the areas within which they live. Most obvious is the City of Lansing, and then residents identify the location of their home most generally by the side of town, such as the East Side. Within the East side are corridors, such as East Michigan Avenue, and neighborhoods, like the Green Oaks neighborhood. Finally, residents use their street names to identify themselves within a neighborhood. The sign system recognizes these levels and begins to identify them in a visible way. Figures 9 through 13 show typical signs, which have a coordinated color, and a Lansing logo. The logo shown is just an example, and it was created to show how any logo the City adopts would fit within the sign system. Neighborhoods will have a sign identifying the name of the neighborhood, with colors coordinated to the side of Lansing in which it is located, and street signs will have the City's logo. • II OF L ANC North :Side I South Side East Side L F LA OF LAB Ty OF LANTy OP LAT�T} ()P LAr'�'`c EAST SIDE EAST SIDE OF LANC'A w ()` A PARK FOR NOT �• l�► PARKING:�i. HERE • • • CONCEPTUAL FREESTANDING NEIGHBORHOOD SIGN Figure 11 SCALE 1"=1' • • • NEIGHBORHOOD AND CORRIDOR SIGNS Figure 12 SCALE 1/2" =1' • • • CONCEPTUAL STREET IDENTIFICATION SIGNS NO SCALE Figure 13 • The corridors will have wayfinding cubes in addition to identification signs. A wayfinding cube will identify the corridor, direct vehicles to parking, and identify specific buildings in the corridor. The backlit cubes will tell the people that the businesses are open, and help simplify the corridor for visitors. These cubes will also be color coordinated to the side of Lansing, and will help residents and businesses identify themselves more easily. Lighting One of the goals of this plan is to create a "Gateway" to both the East side and to the Capitol. The street lighting which exists near the capitol has created a very desirable approach to the restored capitol building. The plan for creating a gateway is to visually link these two areas by using the same light fixtures east to Holmes. The existing street lighting is a mixture of "cobra heads" and older overhead light fixtures, and these lights, although efficient, will not help unify the street. The dual head King Standard lights will bring the feel of the Capital out to Holmes St., thus improving the approach to the Capital. The plan proposes a smaller, single head King Standard for the neighborhoods, which will visually link the neighborhoods to the corridor, but at a residential scale. Unified Landscape Details The elements of the streetscape design vary from planters and walls, to bus shelters, street furniture, and plant material. The specific elements are a part of an overall system, which is designed to visually link the varied architectural styles along the street. The most widely used element will be a brick wall detail that is used for planters, edge treatments, and visual screening. The brick wall will use a brick which is visually compatible with the varying architectural styles in color and texture. The repetition of • this wall will help unify the different buildings, as well as guiding pedestrian circulation. Other uses include separation of commercial uses from residential and institutional uses. One specific example is the wall which separates the Bingham School playground from the parking service drive and Sparrow Hospital traffic, improving the visual character of the area, and also the safety of the children. The bus shelters, or "CATA Stations" utilize the color coordination of the sign system, as well as the brick detail of the planters and walls, to provide necessary shelter and much more interesting bus stops. These shelters use a component system to keep the cost down, but they are very unique structures, intended to provide a "sense of place" along East Michigan Avenue. Figure 14 shows front and side views of the proposed shelter. The street furniture, along with the lighting, was also selected to match the streetscape elements near the capital building. This also serves to extend the capital approach, and allows the study area to become a Gateway to the capital. Elements such as trash receptacles, newspaper stands, bollards, and benches will all be coordinated and this unification helps to simplify the streetscape. See Figure 15. The plantings in the area will serve several purposes. The existing trees, if healthy, will not be removed an replaced with new trees. There are many trees in the study area which are very attractive and growing well. On the other hand, experience has shown that traditional methods of planting street trees are not working well long term. Trees grown in tree grates tend to be stunted and small, due to compaction and soil contaminants. Our plan proposes planters which address these issues, and also provide room for additional planting. Much of the street is lined with one of two types of planters, providing a strong edge of trees which will bring the building scale of the street down to human scale. 0 I2 CATA STATION EAST MICHIGAN AVENUE T • • • DIRECTIONAL LIGHT CUBE AND NEWSPAPER STAND Figure 15 • The section of the corridor from Pennsylvania Avenue east to Holmes St. uses the brick planter, and provides annual flowers. This will increase the impact of the streetscape, and help serve to announce the Gateway. A low, curb height planter is used for much of the street west of Pennsylvania Avenue, where space for streetscape enhancement is limited. Figures 16 and 17 depict typical sections of East Michigan Avenue. Figure 16 is a view of the streetscape elements looking north, and Figure 17 is a cross section of the street looking east. The last element is the paving of the streets and sidewalks. The plan shows all new paving for the sidewalks, which will include brick paving and concrete. One of the goals of this plan is to increase pedestrian safety, and with that in mind, the plan provides wide brick crosswalks at the street crossings. These serve to beautify the street, as well as tell the driver that he or she is in a different area of town, and to slow down. The special paving will increase awareness of the crossings due to their contrasting color and texture, thus improving safety and awareness of pedestrians. We have also proposed a section of East Michigan Avenue be paved entirely in brick. This area is in front of Sparrow Hospital, west of Holmes, and would very clearly indicate to vehicles that they are entering a special place. This would very clearly identify the Gateway to the Capital, and the East Side. Facade Treatments The purpose of the facade treatments is to restore and improve the aesthetic character of the buildings. The end result would be more attractive buildings, which are more useful and viable as commercial space. Some of the buildings are not currently fully utilized, and in conjunction with better access and parking, facade restoration would attract potential businesses. The section of the study area west of Pennsylvania has very little room for streetscape elements, so the improvement of the facades would help improve the visual character of the street where planters and other elements can not be used. Figures 18 through 23 are the elevations of proposed facade enhancements, and these figures are letter coded to the Streetscape Plan, Figure 25. • 13 • • Figure 16 0 u Figure 17 0 Special Traffic Problems Two specific traffic Issues have created the need to Identify additional options that were not shown on the Consensus Framework Plan or the final Streetscape Plan. The first issue addressed was the Intersection of Holmes and East Michigan Avenue. The problem was Identified at the Issues and Opportunities level at an early workshop. The proposed Streetscape Plan involved a solution that recommended a traffic signal that would delay left turn movements from East Michigan Avenue in both directions. A second option, shown below as Figure 24, Illustrates the possibility of relocating Holmes to the east,, south of East Michigan Avenue to aliign the Intersection. This option would require acquisition of private land east of the existing east ROW line on Holmes Street. These options as well as any others which may be developed will be examined in the Sparrow Hospital Development Traffic Study (scheduled for completion In February, 1995), In order to establish the most appropriate traffic and circulation patterns. The Information and results of this study will be available to the Planning Board for review and possible inclusion In the recommendations of the East Michigan Revitalization Study. SPARROW Hosm Al. PAILK04C EAST MICHIGAN AVENUE om srAnon11 �;L-J EAST MICHIGAN AVEfHOLMES ST ^ #4 .- ALIGNMENT OPTION Figure 24 14 EXISTING PARKING Too H ..i .d T NOTF-- Eighth Street removed to provide PROPOSEDopportunity for additional parking :• SPACES DROP OFF ;DIY ••, ,y+/•.a t i v. ;r%.;���� ,:. Faw EXISTING PARKING Ilion IRA V On ON - ,EXISTING PARKING i ItID �4-� PROPOSED PARKING (Shared with Pilgrim Church) it v r -q v � .u-.: �• � •. - • z .� ii$ii �•+►�rti. ���%%_ �Z�:y%i .11�4��%' a��i. ���%. ��r �. _ � �\�y� N lb • N •�- �f��!�:1�I7�NIIIL .�• ii" •Ii�- /_.►i�Ni�_I�ay+�� //��•, o � r \�!' M.: ii��a„ I� 4 \\• \•. .�i ate•Q I. .�,•. .. O . ( • �� C •i -, • R. •• 1..�-- +fit �.• >�' �O �.•+�•���':/�iC1,t��ir...v. ,c? � �'!.. ��.i/lr.� is � O � %?. :.�r.�:wl'. � C�-►. �.�wa\(7�� ...►'!�/i'.7�„ �o� c`/.�•rxv.is,.a••w►snv\r•�.wu••�� al�..r� ii'W.aai �•.1�17i'�� «..a.�. Jn_.\� �i,v\\��•�a'�• M��2I%l.yi� � ^� �• . 1 I i ��INi�..��Ill.�.s/►�4/i �!f111/i.. .��/Ii .�1►\11 ,TRANSIT . • • �a1I,.. .aN►w s ..._ _..... �a '`, c � � � •{� :� 'yea ol'- iii �.�:.�i�' o wryl„ �•: ;'� �� �. •r. o +;, ` `3'ia - 1.'� °'-�` i/ �' � j/ �'tL%����1�/i�1►t`-�/bil'����•/I/Ih��/ - %..�.!•.�,�i��Y.d� ���j���.� - - - T_ '��.7 � ��C�� �%It�J , � • �a� ,e`� N o ,s •o •o EAST MICHIGAN AVENUE REVITALIZATION PLAN STKEETSCAPE PLAN Lansing, Michigan Figure 25 DEARDORFT: DESIGN RESOURCES/Inc. —L A I i \ A � cn L EXISTING� IN 22 SPACES wA I CANOPY TREE CANOPY TREE LANDSC APE TREATME EXISTING BUSINESSEXISTING SPARROW HOSPITALPROPOSED PROPOS :D NEW BUSINESSSPECIAL FACADE. RENOVATION OPTION A LEGEND CATA TRANSIT SHELTER • • � TRAFFIC SIGNAL MAST ARM g DECORATIVE LIGHT FIX -PURE ® BUSINESS PARKING SIGN (Unified Sign System) A second issue that will need further study is the configuration of traffic flow in and around the entrance to Pattengill School. The current plan proposes dual use of this entrance by the school and Sparrow Hospital. This Involves parking that would back out onto the vacated Jerome street Into school traffic and potential ambulance traffic. A second option would involve the designation of parent and visitor parking for Pattengill School In the existing Sparrow Hospital parking lot. It would also feature a separate emergency vehicle entrance from Pennsylvania that would be approximately 100 feet south of Jerome. This would completely separate the school and hospital traffic and, in effect, provide a private entrance for Pattengitl School that would accommodate faculty parking, student pick up and drop off, and visitor parking. These options, as well as others which may be developed will be examined in the Sparrow Hosptital Development Traffic Study due for completion in February,1995. The study will address the interface between the schools and the hospital in terms of safe and efficient Ingress and egress for all users. The Information and results of this study will be made avallable to the Planning Board for review and possible Inclusion In the recommendations of the East Michigan Revitalizaltion Study. Conclusion Again, the purpose of all of these elements is to unify and create a context which will pull together the various buildings and uses along East Michigan Avenue. The Revitalization Plan design calls for the • removal of the "bump outs" at the comers, and the removal of curb cuts where possible to ease the flow of traffic. The signage system and new parking areas will simplify the use of the businesses, making them easier to use and locate. The overall effect of unifying these elements of the study area and coordinating them with the elements near the capital will improve both areas as well as the East Side. • Implementation Strategy Public /Private Partnership The East Michigan Avenue Revitalization Plan will involve a coordinated and cooperative effort to implement the proposed improvements. A project of this magnitude will require thoughtful phasing and a multitude of funding sources. The chart on the following page, Figure 26, defines preliminary costs for the project: 15 • • • AFigure 18 • • • BFigure 19 • 0 • Figure 20 C • • • DFigure 21 • w w_ w w w w w ■ ON an Mmwi EIM30 Al I ON LIA am ME NO MIA =m MW Emu ME RV aWt� "I Mugu mullMM" a r z \\ Y\ \d V� 8 '. s2 �ffa AN WO wr mm (• ( _ j3 * _ �' Environmental Outhouse \� w n R. UZI ..... ..... .. ..... ... . f 912 1 .... .... • COST ESTIMATE DEMOLITION: ITEM UNIT COST QUANTITY COST 1. Curb If $3.25 6,5001f 21,200 2. Bituminous Paving sf $0.50 1801000sf 90,000 3. Concrete Sidewalk sf $1.00 80,000sf 80,000 4. Benches, Sign Posts, Misc. Lump Sum 25,000 CONSTRUCTION: 1. Bituminous Paving sf $2.25 121,600sf 275,000 2. Special Street Paving sf $7.00 64,300sf 450,100 3. Curb & Gutter If $10.00 6,5001f 65,000 4. Special Paved Sidewalks sf $7.00 57,000sf 399,000 5. Concrete Sidewalks sf $3.50 31,700sf 111,000 6. Mast Arms ea $65,000 6ea 390,000 7. Street Lights ea $6,000 60ea 360,000 8. Bus Shelters ea $15,000 4ea 60,000 9. Sign System Lump Sum 50,000 10. Light Cubes ea $2,500 12ea 30,000 11. Planters If $300.00 5,0501f 1,515,000 12. Benches, Trash Receptacles, News Stands, etc. Lump Sum 250,000 13. Parking Lots Space $800.00 262 Spaces 210,000 • 14. Trees ea $400.00 225ea 90,000 Consultant fees @ 10% 447,130 Contingency @ 10% 447,130 TOTAL: $5,365,560 Figure 26 • 16 • Conceptually, phasing is determined by funding opportunities. The most feasible option for funding streetscape enhancement is the Intermodal Surface Transportation Efficiency Act of 1991 or ISTEA(pronounced "Ice Tea"). These Federal funds are available for historic preservation, pedestrian and bicycle amenities and projects with a multi -modal emphasis. East Michigan Avenue meets these requirements in that is a major line of the Capital Area Transportation Authority's bus system that connects downtown Lansing and downtown East Lansing. The improvements proposed within the study area will improve pedestrian, bus and private automobile traffic flow as well as provide easier access to businesses and institutions along this corridor. The funding of ISTEA projects require, cooperation between the Michigan Department of Transportation and the Tri County Regional Planning Commission. The process for applying for funds must be initiated by the City of Lansing. In 1992, $445 million dollars were distributed from this program for enhancement projects in the state of Michigan. ISTEA is a timely funding source for the East Michigan Avenue Revitalization project. A strong case can be built in regard to facade restoration for buildings where historic preservation is the major emphasis of the work. ISTEA funds have been awarded for historic facade restoration. While ISTEA funding can fund a majority of the public improvements proposed herein, the implementation of new small business improvements, such as additional parking, facade improvements that are not historic in nature, and new building construction, will need other sources of funding. The recently developed Enterprise Community Strategic Plan for the City of Lansing identifies a Micro - Enterprise Program which provides an opportunity for new business development and exisiting business expansion. Local banks have created a loan pool to encourage business revitalization with below market rate financing. This financing will be administrated by the City of Lansing Economic Development Corporation. Residential Neighborhood Revitalization Existing programs such as "Paint Blitz" and "Neighborhoods in Bloom" are in place to provide individual property owners with the means to make improvements to their homes and yards. The plan, however, proposes new signs and public spaces and places where landscape improvements are proposed at traffic diverters. There is a need to develop local neighborhood pride in creating and maintaining these areas. The following possibilities are recommended: 1. Neighborhood Green Teams: Using local neighborhood, high school and middle school students, and also the Michigan State University Extension Service; jobs and job training could be created to maintain neighborhood public spaces. Again, the Enterprise Community Strategic Plan defines specific pprogramopportunities and funding sources. 2. Neighborhood Signage: The highest impact per dollar spent to create neighborhood pride will be signage. This plan proposes $ 50,000 for Phase I neighborhood identity signage. The City of Lansing should commit funding to this area as a pilot demonstration project that could be related to other parts of the community. 40 17 • Conclusion The East Michigan Avenue Revitalization Study provides a blue print for restoring not only the approach to the Capitol but also the renewal of the Eastside of the City of Lansing. With Sparrow Hospital's commitment to grow($80 million expansion), the Eastside has a "window of opportunity" to add jobs to the business corridor and to create and stabilize residential property values. The location of these residential neighborhoods provides opportunities for people to live close to employment, schools, retail services and parks. The potential to create "walking neighborhoods" is at hand. With the community and regional access that CATA provides residents, they have access to other neighborhoods, goods, and services throughout the region. This planning effort involved people representing many and varied interests, ranging from residents, to business owners, and large institutions. The result is a cooperative consensus that offers specific proposals for enhancement and revitalization. East Michigan Avenue can and will become the community's "Gateway" to both the State Capitol and the City's Eastside. is 0 18 0 • • EAST MICHIGAN AVENUE REVITALIZATION STUDY MINUTES FEBRUARY 25, 1994 WEIGHT MANAGEMENT CENTER SPARROW HOSPITAL MEMBERS PRESENT: D. Berridge, M. Clark, J. Guillean, B. Johnson, E. Love, J. Prister, D. Sykes, R. Thelen, B. Vincent, M. Woll H. Deardorff (consultant). The meeting was called to order at 7:45 a.m. by E. Love, Chairman. The agenda was approved by consensus. A motion was made by Berridge and seconded by Clark to approve the minutes of the last meeting on November 18, 1993 as printed. MOTION CARRIED. Overview of Planning Goals • Mr. Deardorff distributed copies of a preliminary set of Goals 'and assumptions regarding the E. Michigan Avenue Revitalization Study. The Committee spent a considerable amount of time discussing these products. At the conclusion of the discussion, the consultant was directed to revise the materials for the next public meeting. Review of Work Plan The consultant passed out the revised work plan with tentative dates and products. The committee reviewed these materials and identified specific dates, times and locations for each of these committee and public meetings. The committee adopted the specific schedule which is attached. Adjournment The meeting adjourned at 9:15 a.m. 40 U MINUTES OF THE PUBLIC MEETING EAST MICHIGAN REVITALIZATION March 24, 1994, 7:00 P.M. Eastern High School, 220 N. Pennsylvania Ave. The meeting was called to order by Eleanor Love, Planning Manager at 7:00 p.m. ATTENDEES: Mary Clark Paul M. Scott Bill Vincent Kate Koskinen Bob Setter Pam Smith Paul Ross R.T. Kennedy Mary Smart Bill Allen Doris Witherspoon Bill Stelmach Eleanor Love Jim Prister Howard Deardorff Ms. Love briefly explained the E. Michigan Avenue revitalization study. Howard Deardorff is the consultant for the project. Mr. Deardorff outlined the area of study which is from the 700 Block of East Michigan at the Chessie railroad tracks and extending east to the 1200 block to Holmes Street and extending North (Jerome) and South (Eureka) one block from Michigan Avenue. He • informed the participants that the following issues will -.be addressed in the study area: traffic and parking conflicts pedestrian and vehicular safety non -local or "cut -through" traffic He identified the planning assumptions and goals for the study area. These are not in any order of priority. They are: Planning Assumptions: 1. That the plan will consider existing conditions and future conditions for the short term of 5yrs; long term 20yrs. 2. Boys training school (BTS) property plan is the context within which this study sets. 3. To coordinate the E. Michigan Avenue Revitalization Plan with the Sparrow Hospital Expansion Plan to create a win situation for E. Michigan Avenue businesses, Institutions, Schools, Residential Neighborhood, and for the hospital. 4. The three schools are here to stay, Eastern, Pattengill and Bingham, and will continue to function within the study area. • 5. The existing residential neighborhoods will remain and this plan will define design standards that address the interface between commercial and residential uses. - 2 6. E. Michigan Avenue will remain in primarily commercial use. 7. The planning work will provide for citizen and institutional participation. 8. The plan will serve as a proto-typical guide for the revitalization of retail businesses and their relationship to adjoining residential neighborhood with the entire length of the E. Michigan Avenue Corridor. - - Goals: 1. The plan should minimize traffic conflicts between residents, schools, and Sparrow Hospital traffic. 2. The plan should identify traffic impacts at intersections along E. Michigan Avenue within the study area and locations where significant problem will occur beyond the study area. 3. The plan should minimize non -local cut through traffic. 4. The plan should enhance pedestrian safety. 5. The plan should create a gateway image for both the capitol and traveling east to the East side of Lansing. The plan should work for both directions. 6. The plan should mitigate or soften the visual image of parking and buildings that face residential neighborhoods • 7. and the schools. The plan should encourage facade improvements along E. Michigan Avenue. 8. The plan -should attract new businesses to E. Michigan Avenue. 9. The plan should encourage the conservation and revitalization of residential neighborhoods. 10.- The streetscape design will be configured to harmonize with the streetscape improvements along Michigan Avenue, west of the study area. Several questions were raised by the participants. Mr Deardorff indicated that a traffic consultant will look at traffic problems .as the E. Michigan revitalization study progresses. The participants agreed that minimizing traffic in the area is important as well as resolving parking conflicts. There were concerns that if the current parking situation in the study area continues, parking will be forced on the residential streets. Generally anything outside of the study area is not being addressed in this study, however additional efforts are being made to take a comprehensive look at traffic. The group agreed to add one additional goal and expand on two existing goals: The plan should minimize traffic and parking conflicts between residents, school and Sparrow Hospital traffic. • 3 • The plan will encourage the development of off street parking and provide a balance between business and residential parking opportunities. • The plan should encourage the retention of existing businesses as well as attract new businesses to East Michigan Avenue. In reference to the facade improvements, Mr. Deardorff talked briefly about the blockface of businesses in the area. The goal of the facade improvement is to approach businesses along Michigan Avenue and discuss opportunities for improving the facade of the building. A historic look vs. a contemporary look was favored. Mr. Deardorff talked about the work plan. The four major tasks consist of: I. Project Start-up II. Neighborhood/Business Corridor Alternatives III. Design Treatment IV. Plan Implementation I. Project Start-up Plans and policies are reviewed and goals and objectives are identified. The public has the opportunity to review these issues. II. Neighborhood/Business Corridor Alternatives: Generate alternative plan ideas and traffic flow ideas. This will be presented to the public for their review. III. Design Treatment: Identify several businesses along Michigan Avenue to participate with a facade improvement plan. IV. Plan Implementation:' Identify resources. The public will have another opportunity to review the plan at the April 28, 1994 public meeting. The plan will be submitted to the Planning Board in June for their approval. City Council will vote on the final plan at their July meeting. The meeting adjourned at 8:45 p.m. • • . MINUTES OF THE EAST MICHIGAN REVITALIZATION STUDY COMMITTEE April 14, 1994 7:30 a.m. 100 N. Pennsylvania Present: Doris M. Witherspoon Paul M. Ross _Sandy Heany Richard Barry Vern Fountain Mary Margaret Woll David Berridge Bob Setter Bill Vincent Jim Prister Greg Wetkamp Paul F. Slavin Vivian M. Stouffer Mary Clark Eleanor Love The meeting was called to order at 7:45 a.m. by Doris Witherspoon. Mr. Vincent made a motion to approve the February 25, 1994 committee meeting minutes. Ms. Woll seconded. Motion carried. Ms. Witherspoon briefly reviewed the minutes of the public meeting. It was noted that the following persons were present at the March 24, 1994 public meeting: Ron Thelen • David Berridge Vern Fountain The planning assumptions and planning goals were reviewed. Mr. Deardorff reviewed the issues and opportunities: Issues: - Conflict between Sparrow Hospital, Pattengill and Eastern schools, and residential neighborhood traffic on Jerome Street - Hospital staff parking along Jerome Street east of the Hospital - Visual impact of proposed hospital parking deck along Eureka Street - Studio De Danse need for drop off and pick up off Jones Street and concern regarding closing Jones street in tension with the need to expand the Bingham School Problem of "bump outs" at intersections on East • Michigan Avenue with conflict between pedestrian safety (narrowing roadway) and smooth vehicular. traffic flow • Opportunities: - Opportunity to separate hospital from residential neighborhood traffic at Jerome and. Holmes as per BTS (Boys Training Study) plan - Opportunity to provide visual screening of parking along edge of Sparrow hospital parking area along Pennsylvania and East Michigan Avenue - Problem of Holmes street off set intersection at East Michigan Avenue Mr. Deardorff presented a slide presentation and talked briefly about the evolution of the East Michigan study. The study was formed as a result of the BTS plan. The group discussed several issues: ingress and egress; greenspace, traffic counts and patterns, land use, vehicular and pedestrian movement, Mr. Deardorff proposed two plans (Plan A, Plan B) to address the issues and opportunities (See enclosed). A third alternative was mentioned which will be discussed at the next committee meeting. • The meeting adjourned at 9:45 a.m. -------------------------------------------------------------- The committee will meet on Wednesday, April 20, 1994, 7 : 3 0 a . m to look at the third alternative and further evaluate the current alternatives. The second Public Meeting will be held on Thursday, April 28, 1994 at Eastern High School, 7:00 p.m., -------------------------------------------------------------- • April 14, 1994 LAND USE AND CIRCULATION CONCEPT A This concept provides positive benefits: 1. This concept eliminates cut through business and service traffic along Eureka Street and eliminates school and hospital traffic from Jerome Street east of Holmes. 2. It also reduces traffic business traffic west of Pennsylvania on Jerome by bisecting Eight St. between Jerome and East Michigan and, between East Michigan and Eureka. 3. The plan separates Pattengill and Eastern traffic as well as Sparrow traffic from the schools by separating a Sparrow Hospital service loop from Jerome St. in front of Pattengill. 4. The plan preserves current land use patterns with either separation or shared use of parking for blocks involving multiple land uses. The following are negative impacts of this concept: 1. Creates the potential for Eureka Street to become a "bypass" for people wanting to avoid East Michigan traffic. 2. Forces residents south of Eureka to either Pennsylvania, Hosmer, or Clifford St. to go north to East Michigan Avenue. 3. This plan will create heavier traffic on Marshall because of the elimination of Jerome Street as a through street to Pattengill and Eastern schools, and Sparrow Hospital: LAND USE AND CIRCULATION CONCEPT B This concept provides the following benefits: 1. The concept eliminates service and business traffic for residents along Eureka between Bingham and Holmes while provide some relief to the Pennsylvania/Michigan intersection by providing a bypass via Eureka and Bingham. 2. Separation of School and Hospital traffic. 3. Realignment of Holmes at Fast Michigan to provide a safer intersection. 4. Using traffic diversions as shown on the plan, cut through traffic will be greatly reduced with major reductions of along Eureka and Jerome Streets. The following are negative impacts of this concept: 1. While through traffic is eliminated for most people along Eureka Street, the residents along Eureka between Pennsylvania and Bingham would probably experience more cut through traffic. 2. In a similar fashion, more traffic would occur on Jerome between Pennsylvania and Eighth Street. 3. This plan would also create more traffic on Marshall and would likely increase traffic in front of Bingham School. L L +; 11I! Li H- U 1 f -� f 1 .� Ll 1.1l,L) oo I ..... ...n Oyw-ifi.. .n ..—Or\. 1- .._r. � v..n�.�r.•�nr•+rrn+M ....Ne.. /..M...\qM. 1.... rww .• erM.� a.... o- r...� -x..w �.wR_ .r,,,.,.�o...�...r.......r. EXISTING AM MAK EXISTING PM BEAK IIOUR TRAFFIC VOLUMES FIOU0. TKAFnC VOLUMES EAST MICHIGAN AVENUE " REVITALIZATION PLAN ISSUES AND OPPORTUNITIES ANALYSIS UU0. W0.FF ULSrGN 0.LSOURCFS/lw.. �� Lansing, Michigan . �^ry n11..n..IrynMi.�j• nr Mm I�w1r ..n� r t.w r i r , 1 I c, NNE y VINE 7 I EASTERN HIGH SCHOOL I I i ' Q RESIDENTIAL I y, (;_, .,•I = NEIGHBORHOOD RESIDENTIAL - Ili FUTURE NEIGHBORHOOD Z , . PATTENGILLIUNIOR IUGH k •�" i L;FROMF EROME a I +- FUrURE SPARROW HOSPITAL ' r r4 r i i f .tm I NFUEow - ``, — T III! p rlEwscl C .: • > p I . BUJGHAM f I 7 Z C �: SCHOOL { 111Annlr� C < R IIDENTIALNEIGHBOR pm o f o�l x S 0 EAST MICHIGAN AVENUE REVITALIZATION PLAN LAND (ISE and CIRCULATIONCONCEPA DFANII KIT UISIGN PI—Kk;l.'Inl. U LJ Lansing, Michigan VwE W Z EASTERN HIGH SCHOOL z < - i - FUTURE PATTENCILL JUNIOR HIGH y - 0.� ! ' FUTURE - SPARROW HOSPITAL 'c AVENUE EAST MICHIGAN AVENUE M REVITALIZATION PLAN LA ND [ISE and CIRCULATION CONCEPT B Lansing, Michigan OlwHU00.I1 UI}IONM6OURLLVIna • MINUTES OF THE EAST MICHIGAN REVITALIZATION STUDY COMMITTEE May 3, 1994 7:30 a.m. 100 N. Pennsylvania Present: Richard Barry David Berridge Jim Prister Bill Vincent Mary Margaret Woll Howard Deardorff As a follow up to the meeting held on May 3, 1994, the following conclusions were discussed and agreed upon regarding the Public Meeting held on April 28, 1994 to review conceptual alternatives for the East Michigan Avenue Revitalization Study: 1. With the disappointing attendance despite the mailing of 600 invitations, the decisions regarding preferences for a consensus alternative becomes more of a committee decision. is2. The consultant presented a tabulation of the feed back sheets (11 submitted). While the number of feedback sheets returned cannot be considered representative of the surrounding neighbors, the conclusions are as follows: A. There was no clear preference for a single alternative. Alternative A received, clearly, the least preference while Alternatives B and C were preferred almost equally. B. There was strong agreement that the intersection of Holmes and Michigan should be realigned. There was strong agreement that cut through and/or Sparrow traffic should be eliminated from residential neighborhoods. There was strong preference for traffic diversions to eliminate cut through traffic even though it would inconvenience residents. 3. The committee agreed that the study should move forward to Phase III. East Michigan Avenue Steetscape and Facade design. The Alternatives Phase should be concluded as follows: A. Scheme C should be modified to make the loop south of East Michigan Avenue two way. The Eight Street mid block diverters should be eliminated. The Holmes/Michigan intersection should be realigned. The plan should be thought of as a framework within which the Schools, Sparrow Hospital, Businesses on East Michigan Avenue, and Residential neighbors can plan to move forward. As we move forward, certain details of the plan may be challenged and, with the careful scrutiny of the City • and all parties involved, changes in detailed implementation may be made. The Framework Plan does, however, does provide a guideline of understanding for future public and private development and revitalization along the East Michigan Avenue. • B. The Framework Plan should document a "tool box" of options for dealing with the separation or integration of land uses, pedestrian and vehicular traffic, and parking. 4. There was extended discussion regarding the issues to be addressed in Phase III. of the study. Concerns were expressed that committee would need more input and review of the proposed facade and streetscape treatments. Additional meetings were discussed as well as the possibility of delaying the Planning Board presentation scheduled for June 7, 1994. The consultant was questioned regarding the specific elements that will be addressed in Phase III. It was suggested that a detailed list of specifics be developed and forwarded to Committee members. The meeting adjourned at approximately 9 a.m. The next meeting of the committee will be April 19, 1994 at 7:30 a.m. to look at the preliminary designs for streetscape and facade elements. If an intermediate meeting is needed, the Department of Planning and Neighborhood Development will notify committee members. The next public meeting is scheduled before the Planning Board on June 7, 1994. • 0 • • 0 JUL 08 '94 11:33AM P&ND DEVELOPMENT OFC Minutes of the Regular Meeting LANSING PLANNING BOARD 7:30 p.m., City Council Chambers Tenth Floor, Lansing City Hall 124 West Michigan Avenue TUESDAY, JUNE 7, 1994 I. OPENING SESSION P.3/13 DRAFT TO CLERK APPROVED TO CLERK Chairman Helen LeBlanc called the meeting to order at 7:32 p.m. A. Roll Call. Present: Fountain, Goolsby, Horne, LeBlanc, Marshall, Ruge, Thelen. Ex officio Councilmembers Jones and Lilly - not in attendance. B. Excused Absence - None. Forrest - absent. Mr. Thelen made a motion, seconded Mrs. Horne to excuse Mr. Ruge from the May 17, 1994 meeting; voice vote; unanimous; motion -carried. C. Introductions. Eleanor K. Love, Planning Manager, introduced staff present: James A. Ruff, Zoning Administrator= William Burleson, Associate City Attorney, City Attorney's Office; Louise H. Christian, Planning Board Secretary; Doris M. Witherspoon, Senior Planner. D. Approval of Agenda. The agenda was approved as printed. The Chairman added an item to the agenda, a resolution distributed at tonight's meeting in support of the Enterprise Community application. With that addition, the agenda was approved. II. HEARINGS: A. SLU-7-94, 831 & 835 N. Sycamore Ave., Loaves & Fishes - Homeless/Emergency Shelter. Mr. Ruff presented the request by Loaves and. Fishes Homeless Shelter to amend their special land use received in 1982 in order to increase the capacity to 15 and expand the facility into 835 N. Sycamore, combining the two buildings. The property is zoned "C" Residential which allows residential care facilities with a special land use permit. KEVIN J. BOWLING, ON BEHALF OF LOAVES AND FISHES CORE GROUP, 831 N. SYCAMORE. We have operated the overnight shelter since 1981. To maintain our current shelter at 831 N. Sycamore, we need to buy the adjacent property at 835 N. Sycamore. Our plan is to connect 831 and 835, and provide adequate parking. We intend to maintain the emergency portion of our program at 831 (short-term), and develop a transitional living program at 835 (long-term). JUL 08 '94 11:38AM P&ND DEVELOPMENT OFC P.4/13 • PLANNING BOARD MINUTES JUNE 7, 1994 - PAGE 2 I have letters of support from community agencies. For the overnight shelter, the City Council in 1981 required that guests could be in the shelter only from 6 p.m. to 10 a.m. the following day. If. we expand to include a transitional living program, services would be provided to guests in the transitional living component during the day if City Council would permit. this. Chairman LeBlanc said Mr. Bowling provided letters of support from the Child Abuse Prevention Service, Community Support Services, Cristo Rey, Southland Clinic, Lansi.n.g Public Schools Adult and Vocational Education, LCC Student Counseling Center, LCC Women's Resource Center, Literacy Volunteers of America, Center for Handicapper Affairs, Friendship Clinic, Ingham County Health Department, Housing Resource Center, Volunteers of America New Hope Center, Professional and New Hope Job Clubs, Peckham Vocational Industries, Youth Development Corps, and Legal Aid of Central Michigan. Chairman LeBlanc read into the record letters received in the Planning Division from New Way In, Wendy Ring, *in support, and • David DeVinney, 9161 Wisconsin Avenue, in support. SLU-7-94 is referred to Zoning and Ordinance Committee. B. SLU-9-94, Radford Road, Reachout Christian Center, Construct New Church Mr. Ruff presented SLU-9-94, a request to construct a new church facility in two phases on property bounded by Wise Road, off the end of Holmes, along homes on Radford Rd. near Coachlight Common, and Waverly and Miller. The area was platted once and then replatted. It has never been developed for residential purposes. A number of acres have been sold off; the church purchased a part of the property to develop the church facility, with a capacity of 279 persons, on a 16-acre parcel in Phase I. Phase II would have a larger sanctuary, and the Phase I facility would be converted to a gymnasium. The property has an access easement from Consumers Power, so there is direct access onto Wise Road on the north end. Chairman LeBlanc asked about access to Radford Road; Mr. Ruff said there is no access to Radford Road. The petitioner was not present. • SLU-9-94 was referred to the Zoning and Ordinance Committee. JUL 06 '94 11:39AM P&ND DEVELOPMENT OFC P.5/13 • PLANNING BOARD MINUTES JUNE 7 1994 - PAGE 3 C, SLU-10-94, 5609-5701-5709 S. Pennsylvania Avenue, Spartan Toyota, Allow "J" Parking for Display of New and Used Vehicles Mr. Ruff presented the request by Spartan Toyota for a Special Land Use permit to utilize "J" Parking District along Pennsylvania Avenue for the display of new and used vehicles. They have purchased the old ABC Warehouse property and are reducing some of the parking area for landscaping in the front 69 3/4 feet and also providing parking for sale of new and used vehicles. The toils Parking District allows this with a special land use permit. The property is zoned "H" Light Industrial besides the "J" Parking District; it is about 4 3/4 acres in size, surrounded by other commercial and warehouse development. They are also asking for their current Spartan Toyota and Lexus property be brought up to meet the standard of the'special land use permit. The petitioner was not present. • SLU-10-94 will be referred to the Zoning and Ordinance Committee. D. ACT-5-94, River Street Closure Mr. Ruff presented the case, a request by Public Service Department to vacate street right-of-way of River Street between Kalamazoo Street and Grand Avenue (Cesar Chavez) and that the property be utilized for a staging area and then for a redevelopment site in the future. In the interim, it would be a parking area and a staging area for construction of the Intermodal Transportation Terminal. The City has purchased the properties on both sides of River Street. Mr. Ruge asked if the City has excess parking now? Mr. Ruff said when a site is developed and existing parking has to be relocated, the parkers have to be relocated nearby; plus space is needed for construction equipment. DAVID J. BERRIDGE, CITY TRANSPORTATION ENGINEER. Mr. Ruge asked if the proposed parking would replace parking taken over by the new transportation center. Mr. Berridge said the proposed parking lot is part of the plan adopted by City Council in October 1989 to acquire • the land, demolish the properties, consolidate the land and construct a surface lot. We are following through on a plan adopted five years ago. Parking is still needed. JUL 08 '94 11:40AM P&ND DEVELOPMENT OFC P.6%13 PLANNING BOARD MINUTES JUNE 7 1994 - PAGE 4 Mr. Thelen asked how many total parking spaces; Mr. Berridge said nearly 400 spaces. Patrons parking in the 150-space lot will be relocated during construction. Handicapper spaces will be constructed and available in accordance with ADA requirements. Mr. Fountain asked about vacation versus closure of the street. As the item proceeds through committee, closing rather than vacating should be scrutinized. Technically, it may make some difference in the future. In some other areas downtown, streets were closed, rather than vacated, so that easements for sewer, etc. could be maintained. It is worthwhile looking at this aspect. Mr. Berridge said he would be happy to consider the suggestion. Mr. Fountain said the property is in the floodplain and maybe even in the floodway and should be checked to see if any use permit is required to reconstruct the parking lot. Act-5-94•was referred to the Urban Development Committee. Chairman LeBlanc said the River and Waterfront Board at their recent meeting informally discussed the matter and • requested landscaping of the parking lot and maintenance of the access to the river and the River Trail, and perhaps a river overlook. Also, if the site is developed in the future, that the developer be required as part of any sales agreement to develop the public portion of the river bank. E. LS-4-94, Lot Split, 1539-1545 Ohio Ave. Mr. Ruff presented the case, a request by Kenneth Kruger, 1539 Ohio Avenue, to split property off 1545 Ohio Avenue and attach it to his property at 1539 Ohio Avenue. The split. would increase the size of, his property and decrease the adjoining property. Neither property would meet the current subdivision requirements. The property sizes will increase, 1539 Ohio Avenue from 33-foot lot to a 36-foot lot, and 1545 Ohio Avenue from a 49-foot lot to a 46-foot lot. The property is "B" Residential District. The petitioner's driveway has extended over the driveway for many years and he is trying to clear it up. KENNETH KRUGER, 1339 OHIO AVENUE. The agenda gives this item as 1543; the correct address is 1545. LS-4-94 will be referred to the Zoning and Ordinance • Committee. III. PUBLIC MEETINGS: JUL Oe '94 11:40AM P&ND DEVELOPMENT OFC P.7/13 • PLANNING BOARD MINUTES JUNE 7 1994 - PAGE 5 A. Enterprise Community Application Order will be first a staff presentation, followed by audience comments. ,Mr. Thelen made a motion, supported by Mrs. Horne, for a five-minute recess to allow staff to met up for their presentation; voice vote; Yeas: 7; Nays: 0; motion carried unanimously. Mr. Winnicker, Development Manager, summarized the City Is effort to seek Enterprise Community designation. The federal government has given communities the opportunity to be designated as Enterprise Communities or Empowerment Zones. We designated eight committees, which met in March and April about the functional areas, housing, economic development, human services, education and training, finance, public safety, infrastructure and transportation, and environment, to be addressed in the application. • Each committee picked two or three strategies that would be effective in addressing area problems, strategies for which we have commitments in place. Four things are mandated to be looked at: The need to have self-sustaining programs. They have to run on their own some time in the future. The theme of this area is jobs, jobs, jobs; employment. The idea is to create economic opportunities in the communities, or have people create their own opportunities and getout of poverty. They must be community -based, with community support. The last is the vision for change, the need to do business in a different way than in the past. We tried to demonstrate each of these four ideas in the core strategies. We feel we have ten to twelve good core strategies. Chairman LeBlanc announced the public comment section. MARTY ANDREWS, LANSING BUSINESS OWNER. I was on the Economic Development Committee. Regarding micro - enterprise businesses, we need to attract larger firms with more business experience to provide jobs. Another thing: people at the colleges aren't qualified to train people for jobs. They can train for basic skills but not how to run businesses. Regarding community focus • centers, ten might be too many. One or two --who is going to pay taxes, and utilities after the grant expiration. Spend the money researching bringing bigger businesses to Lansing to provide more jobs. JUL 08 '94 11:41AM P&ND DEVELOPMENT OFC P.8%13 PLANNING BOARD MINUTES JUNE 7 1994 - PAGE 6 CATHY PELHAM, 239 ELVIN COURT. I am confused about the relationship of existing grants to the potential EC money and concerned that money will be diverted from CDBG. In the EC application and in CDBG, they talk about maintenance of effort. We are not to use those special funds to undermine an ongoing effort. We have been very careful that the EC dollars would be an expansion or an addition to existing programs. BARB WICKERHAM, 539 BAKER STREET, NEIGHBORS UNITED IN ACTION. I am a VISTA. volunteer, in support. We would like to see a latch key program instituted. People could work and know their children are taken care of after school. We are going to use resources already available, RSVP program, Foster Grandparents and Youth Illiteracy Coalition. we are doing a community needs assessment. CARI HANSON, 907 BURCHAM. I am the other neighborhood VISTA volunteer. We have talked about projects in the focus center, immunization clinics, a community library, and day care. Regarding attracting larger businesses, in • Atlanta, large corporations sponsor a neighborhood and provide on-the-job training and other activities. DEBRA TELLES, NORTH LANSING. Please explain rationale used in developing the neighborhood focus centers as opposed to utilizing and expanding existing centers in the distressed areas, and a definition of "distressed area". "When I woke up this morning, all of a sudden it was a distressed area". Ms. Love said Kingsley is already at capacity, and Foster is outside the EC area. Instead of enlarging and centralizing activities for two or three centers, the idea is to decentralize facilities to be closer to individual neighborhoods. Regarding distressed areas, within the area are 14 census tracts having populations with 25 percent of residents at or below poverty level. The eight tracts .in the center have 35 percent of residents at or below poverty level. This is the same area the City has been working on for at least 15 years. JOHN SANFORD, 342 CORRAL PATH, EMERGENCY SERVICES DIRECTOR, RED CROSS, EC HUMAN SERVICES COMMITTEE, ALSO ON CAPITOL AREA COMMUNITY SERVICES BOARD. I want to speak to the focus center issue. Head Start is growing, and looking for classrooms. The closer Head Start can get to • the community, the less transportation we must have. Head Start'is in the Donor& facility, will purchase half of it, and will be involved in continuing maintenance. CACS expects to continue to be involved. This is money JUL 08 '94 11:42AM P&ND DEVELOPMENT OFC P. 9/13 • PLANN_ING BOARD MINUTES JUNE 7, 2994 - PAGE 7 from a new source other than EC. These small multiple facilities are needed because we are dealing with community ownership. Each facility would have offices that would be defined by the community. We can't consolidate into major centers, rather, we have to get smaller and closer to home, and focus on a smaller basis. JENNIFER GRAD, 201 LATHROP, REPRESENTING LANSING NEIGHBORHOOD COUNCIL. I will be sending a letter with ideas that neighborhoods interface, but Neighborhood Council, along with Dr. Frank Fear from Resource Development, and Dr. Rex Lamour from Center for Urban Affairs, has gotten to the second stage of a $270,000 environmental grant to interface neighborhood activities with environmental projects. We are one of 14 applications being sent to the federal government Friday. We will know by the end of the summer. Chairman LeBlanc read into the record.some written comments: Carl Dorshimer, Economic Development Planner, Tri County Regional Planning Commission,•in support,'with comments; • Ken Spurber, Office for Young Children. Disappointed that child care issues were not included in the preliminary plan. Suggests several possible initiatives to address these; Mary Margaret Murphy-Woll, President, Eastside Neighborhood Organization, in support and offering help as volunteer. This concludes the public meeting on the Enterprise Community application. B. East Michigan Avenue Revitalization Study Committee HOWARD DEARDORF, DEARDORF DESIGN RESOURCES. Presented the plan for revitalization of East Michigan Avenue in four phases including Project Start Up, Neighborhood Business Corridor Alternatives, East Michigan Design Treatment, and Plan Implementation Phase. The plan assumptions are: (1) consider existing and future conditions; (2) the BTS Plan is relevant and is the framework for the study; (3) coordinate the study with Sparrow Hospital's plan; (4) Eastern, Pattengill and Bingham are here to stay, and the residential neighborhoods are here to stays (S) Create design standards for the interface for residential and commercial uses; (6) East Michigan Avenue will remain primarily in commercial use; (7) the Study will be a participatory process; (0) This plan will serve as the • prototype for the entire East Michigan corridor out to US--127 . JUL 08 '94 11:42AM P&ND DEVELOPMENT OFC P.10/18 rPLANNING BOARD MINUTES JUNE 7, 1994 - PAGE 8 The goals are as follows: minimize traffic conflicts between residents, schools, and hospital; identify traffic impacts at intersections along E. Michigan; minimize nonlocal cut -through traffic; enhance pedestrian safety; create a gateway image for the Capitol as one - approach going from the east to the west, and for Lansing's east side; soften commercial use impacts on residential uses; encourage facade improvements along E. Michigan Avenue; attract new businesses to E. Michigan Avenue; encourage conservation and revitalization of residential neighborhoods; and maintain unity in the streetscape design. The East Michigan Avenue Design treatment is a part of this study; we are taking about adding about 180 parking for businesses along East Michigan other than Sparrow Hospital in hopes of revitalizing the East Michigan Avenue community. Parking is key. In terms of signage, we want to install signage that will enable people to find a place to park. That will give the businesses the chance to be successful. In the implementation stage to identify programs to fund this, we think the secret is in the Enterprise Community, not all the money, but the kind of money to pilot things and get things started. This is an opportunity to revitalize not just the street, but the neighborhoods around it, and stabilize and emphasize opportunities in the neighborhood. Mr. Ruge left the meeting at this point. Chairman LeBlanc informed Mr. Deardorf that at the June 21 meeting a public hearing will be held on street lighting in the downtown area and on Michigan Avenue to Pennsylvania Avenue. Chairman LeBlanc called for comments from the audience. JULIE SOLTOW, 1212 EUREKA. My question is about the diverter at Holmes and Eureka. It looks like a one-way loop that goes around the annex to the east. Mr. Deardorff said it will be two-way, and traffic will be diverted to prevent cut -through traffic. Holmes, Bingham and Eureka will remain two- way streets. PAUL ROBS, ON BEHALF OF STUDIO DE DANSE. I came to • express the concern of Studio De Danse for the safety of the students. ,Tones Street is a very viable route used 'by Studio De Danse and the parents. We're very aware of the concerns of the neighbors against non-residential - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - JUL 08 '94 11:43AM P&ND DEVELOPMENT OFC P.11i13 • PLANNING BOARD MINUTES JUNE 7, 1994 - PAGE 9 cut -through traffic. The idea of a commercial alley running from Bingham school, behind the CoMerica Bank, the Lynn camera building, and outletting onto Jones street is certainly something that we are interested in looking at. Thank you. JON ANTHONY, EASTSIDE COMMERCIAL CLUB. I've been a businessman on Michigan Avenue for 54 years. I think our residential areas are coming back. I would like to see this, and along with Sparrow Hospital, am trying to get our employees to buy on the Eastaide, and will assist in the purchasing of houses similar to Sparrow. I would like to see this a world class city, and everybody on the east side would like to see that. Thank you. BRIAN SINGER -TOWNS, 1220 EUREKA. We have to put a priority on bringing those businesses back onto Michigan Avenue again; that will help the neighborhood. We've been concerned about the traffic flow. On Holmes and Michigan, traffic lights would really help that if you can't actually straighten the street out. • Chairman LeBlanc announced the conclusion of the public meeting. IV. COMMENTS FROM THE AUDIENCE - None. V. RECESS - None. VI. BUSINESS SESSION A. Minutes for Approval: None. B. Committee Reports: 1. Zoning and Ordinance Committee,.Mr. Thelen, Chair. a. Next meeting Wednesday, June 15, 1994, at 2:30 p.m., planning Division Conference Room 2. Urban Development Committee, Mr. Goolsby, Chair a. Next meeting Tuesday, June 14, 1994 at 4 p.m., Planning Division Conference Room, Second Floor, Washington Square Annex Chairman LeBlanc announced that Ms,. Marshall has been appointed to the Urban Development Committee. • Mr. Goolsby asked regarding the East Michigan Avenue study, if committee consideration is being held off until the implementation - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - JUL 08 '94 11:44AM P&ND DEVELOPMENT OFC P.12i13 • PLANNING BOARD MINUTES JUNE 7t 1994 - PAGE 10 plan is completed. Ms. Love answered that she anticipates that it would come at the July meeting. 3. . Executive Committee - did.not meet. C. Report from Planning Manage : Ms. Love said "You've seen most of what we're working on tonight. I'll leave it at that." D. Pending Items: Future action required. 1. Zoning and Ordinance Committee: • a. NCU-2-931 812 Eureka Street, Class A status b. Z-23-901 2200 Olds Avenue (Committee Held) C. Z-3-91, 4700 Block Aurelius Road (Committee Held) d. Z-8-94, SE Cor. S. Cedar & Pacific, "B" to 2. Urban Development Committee: • a. East Michigan Avenue Land Use Policy b. ACT-49-92, Kaplan Street VII. NEW BUSINESS Mr. Goolsby made a motion, seconded by Mr. Fountain to resolve into a Committee of the Whole to consider the resolution for the Enterprise Community Application. PLANNING BOARD ACTION on the motion was as follows: On a voice vote, there were: Year►: 6; Nays: 0; carried unanimously; motion approved to resolve into Committee of the Whole; Mr. Goolsby, chair. Mr. Goolsby called the Committee of the Whole to order to consider the resolution of the Enterprise Community application. Mr. Fountain made a motion, seconded by Ms. LeBlanc, 'that the Committee approve the resolution and forward it to Council. COMMITTEE OF THE WHOLE on the motion was as follows: Mr Fountain said this might be the time to make ordinance amendments to accommodate home occupations and cottage industries, • while protecting adjacent properties; and to relax building codes to make these things happen without taking away the entire intent. Mr. Thelon said for the record that he formerly resided in one of those distressed areas, and it did not suddenly become distressed this morning. JUL 09 '94 11:44AM P&ND DEVELOPMENT OFC P. 13%13 • PLANNING BOARD MINUTES JUKE 7 1994 - PAGE 11 On a voice vote, there were: Yeas: 7; Nays: 0; carried unanimously; the resolution of support for the Enterprise Community application was APPROVED. Mr. Goolsby made a motion, supported by Mrs. Horne, that the Committee of the Whole has met and considered a resolution of support for the Enterprise Community application, and,the Committee unanimously recommends that the Planning Hoard approve the resolution and send it to City Council for their consideration. PLANNING BOARD ACTION on the motion was as follows: On a roll call vote, there wares Yeas: 6; Nays: 0; carried unanimously; the resolution of support for the Enterprise Community application was APPROVED. viii. NEW BUSINESS - None. IX. COMMUNICATIONS Chairman LeBlanc said there is one new communication she neglected to read at the public hearing from the Eleven -Twenty Company regarding SLU-10-94, 5609-5701-5709 S. Pennsylvania Avenue, in support; however, they feel the portion of property immediately adjacent to Keystone Avenue should be restricted to normal appearance and without the use of banners, flags, etc., for sales tools, because Keystone Avenue is transitioning to office use. They feel the appearance of the dealership should be oriented to Pennsylvania Avenue, and not to Keystone Avenue. Chairman LeBlanc welcomed new member Jane Marshall. The other item is vacation schedules --submit them as soon as possible. Chairman LeBlanc will have to miss the second August meeting. Also, the first meetings in July, August, and September are on Wednesdays,: due to elections and holidays. Mr. Fountain said it may be possible to consolidate the summer meeting to a single monthly meeting. Regarding the Enterprise Community boundaries=, the area covers all four NDA areas that were previously looked at as depressed areas. Ms. Love said it includes the NSAs and the 21 target neighborhoods that we are operating in. X. ADJOURNMENT - was at 11:02 p.m. Respectfully Submitted • Eleanor K. Love, Secretary Lansing Planning Board e:\wp\data\p1anbd\mn060794 DEARDORFF DESIGN RESOURCES / inc. Land Planning Urban Design FAX TRANSMITTAL TO: Paul Slavin FAX NUMBER: - 810-788-2152 FROM: Greg Weykamp FAX NUMBER: (517) 694-7596 PROJECT: East Michigan Avenue/Jones St. Traffic Counts Total number of pages, including this cover sheet: 6 DATE SENT: April 21, 1994 TIME SENT: 11:10 am PLEASE CALL US IF YOU DO NOT RECEIVE ALL OF THE PAGESI is Phone: (517) 694-7595 REMARKS: Paul... Here are the results of my survey last night. These charts show the results of the information I collected. I do have some information about which way many of the Studio De Dance patrons left the site, although I'm sure I missed where some of the cars went, so I did not include this information on the charts. If you have any questions, please call me. Thank You, Greg Weykamp 0 • EAST MICHIGAN AVENUE/JONES ST HOUR TOTALS TIME STUDIO DE DANSE THROUGH TRAFFIC TOTAL TRAFFIC 4�-530 23 3� 5 7 630 24 37 61 63d -7X 15 23 -15 730-83v I G 2 3 53 8 �ti -930 8 Z4 3 Z On the following charts: 1. RIGHT IN and LEFT IN refer to traffic movements from East Michigan Avenue turning RIGHT or LEFT onto Jones St. 2. RIGHT OUT and LEFT OUT refer to traffic movements from Jones St. RIGHT or LEFT onto East Michigan Avenue. 3. EAST MICH. refers to Studio De Danse pick up and drop off traffic only. 4. FROM JONES indicates Studio De Danse traffic which arrived from the South via Jones St. 5. OUT JONES indicates Studion De Danse traffic seen exiting the study area to the South on Jones. 6. Within the chart, all counts referenced with an "S" indicate Studio De Danse Traffic(ie:1 S, 4S) 7. Within the chart, all counts referenced with a "T" indicate through traffic. These counts were taken Wednesday, April 20, 1994, between the hours of 4:05pm and 9:30pm. The weather was sunny and clear, approx. 55 degrees at 4:15pm; and clear and cool, approx. 35-40 degrees at 9:30pm. • EAST MICHIGAN AVENUE/JONES ST. TRAFFIC COUNTS, April 20, 1994 • • mummmmmm-_ STUDIO DANSE TOTAL PEDES • EAST MICHIGAN AVENUE/JONES ST. TRAFFIC COUNTS, April 20, 1994 • numummmWIDANSE STUDIO THRU TOTAL PEDES :7 • EAST MICHIGAN AVENUE REVITALIZATION PLAN ALTERNATIVES FEEDBACK SHEET or other Affiliation: ii: ivame Address ALTERNATIVE RANK COMMENTS CONCEPT A Pro Con CONCEPT B Pro Con CONCEPT C Pro Con 1. I would prefer less traffic and diverters on local streets, even though less convenient for me. Agree Disagree No Opinion 2. I would prefer existing cut through traffic over street closings and/or diverters.- Agree Disagree No Opinion 3. I would like to see Holmes St aligned at the Holmes/East Michigan intersection. Agree Disagree No Opinion 4. I would like the sidewalk/curb 'bump outs" removed from East Michigan Avenue. Agree Disagree No Opinion 5. I think the current traffic system is fine just as it is. Agree Disagree No Opinion 6. I would prefer Sparrow Hospital traffic be separated from Eureka St traffic. Agree Disagree No Opinion 7. I would prefer all commercial traffic be separated from Eureka St Agree Disagree No Opinion Other Comments: • 1�1 EAST MICHIGAN AVENUE REVITALIZATION PLAN ALTERNATIVES FEEDBACK REPORT Note: Ranking with lower being better with 1.0 being perfect score, ALTERNATIVE RANK COMMENTS CONCEPT A 2.375 Pro: 1. Separates traffic without traffic loops. 2. Protects neighborhood south of Sparrow from traffic. Con: 1. Dislike 8th St. intersection. 2. No access from (neighborhood) south (of Eureka) to Michigan Avenue. 3. Traffic on Eureka forced down to Clifford (& Lathrop) and Eureka. 4. Eureka could be a by-pass for east -west traffic. CONCEPT B 1.875 Pro: 1. School traffic away from neighborhood. 2. This keeps the Bingham, Jones, Holmes, Eureka neighborhood together. 3. Holmes/Michigan St. meets more smoothly. 4. Diverters on both Bingham and Holmes minimize cut -through traffic. 5. Holmes/Michigan intersection, Eureka protected. 6. Stops a lot of cut through traffic. 7. Encourages cut -through traffic. 8. Addresses most issues directly. Con: 1. Remove 8th St. diverter, like U-loop for Studio de Danse. 2. Too much isolation of (neighborhoods) south (of Eureka.) 3. No Michigan Avenue access for Eureka, Jones, Bingham. 4. No access to Michigan for Jones St. residents. 5. Residents on Jones St. have no easy access to Michigan Avenue. 6. It seems to bring traffic in the neighborhood with the sparrow exit lined up with Bingham, then around to Eureka, & Eighth. 7. Not able to get to Michigan Avenue (from South of Eureka). CONCEPT C 1.75 Pro: 1. Good buffer between parking ramp and Eureka St. Residents. 2. Maximize green space for Eureka residents across from parking deck. 3. Jones and Eureka access to Michigan Avenue. 4. Access to Michigan Avenue East & West. 5. Good pedestrian system. • is Con: 1. Cut through in parking lot (of Pilgrim Church). 2. Holmes/Michigan intersection, possible excess traffic on Eureka. 3. Eureka residents don't have easy access to Pennsylvania Ave. 4. Dislike one-way system. 5. Does not have Michigan/Holmes intersection lined up. 6. Traffic flow from Pennsylvania to Bingham, not able to get to Eureka -Jones area people. 7. Dislike one-way and overall design. 1. I would prefer less traffic and diverters on local streets, even though less convenient for me. Agree 7 Disagree 1 No Opinion 1 2. I would prefer existing cut through traffic over street closings and/or diverters. Agree Disagree 9 No Opinion 3. I would like to see Holmes St aligned at the Holmes/East Michigan intersection. Agree 9 Disagree No Opinion 4. I would like the sidewalk/curb "bump outs" removed from East Michigan Avenue. Agree 3 Disagree 2 No Opinion 4 5. I think the current traffic system is fine just as it is. Agree 1 Disagree 8 No Opinion 6. I would prefer Sparrow Hospital traffic be separated from Eureka St traffic. Agree 8 Disagree 1 No Opinion 7. I would prefer all commercial traffic be separated from Eureka St Agree 8 Disagree No Opinion 1 Other Comments: 1. Jerome St. must be closed ar Holmes, as previously discussed. 2. I prefer the closing of 8th St. in the same manner as Plans A & C for additional business parking for the funeral home and Sparrow. 3. Very strongly agree with (Statement) #6 (above). 4. As a Jones St. resident, all tr,ree concepts are agreeable in that they minimize cut through traffic north/south. Thanks for a thorough, enlightening job. 5. All of the concepts are an improvement over the existing situation. 6. Hosmer as a north/south (route) could be a problem on all concepts. 7. I believe our membership (Pilgrim Church) will be cooperative in solving parking problems; we are concerned about parking lot cut through traffic. 8. The service loop around Sparrow needs to be studied. 9. I disagree with the thought that commercial activity on East Michigan, east of Cedar, is on the wane. In fact, East Michigan is the most active and leased neighborhood commercial area, especially when compared to North Lansing and South Washington. Have church, Spagnuolo and other commercial entities develop a joint parking area in between their properties, to the rear of the Michigan Avenue buildings, putting any new Spagnuolo property right on the street. (For block bounded by Eureka, Bingham, Pennsylvania, and Michigan). The cut off of some streets to direct access to Michigan might be inconvenient, but should return a sense of neighborhood. • CACT 11AIt"Ulf`-AAI A\/CAl11C/_IfNKICC CT iC 11AIAl11TC Tf1TA1 C TIME STUDIO DE DANSE THROUGH TRAFFIC TOTAL TRAFFIC 415 - -+'SC Z 9 11 �} -445 A 6 ►c A 4 5CG -515 b 13 19 5ts - 530 53o - 545 -7 b 13 50 -6co 2 15 17 b� -615 6 8 14 lal5 -63� 9 $ 17 63G -645 4 8 12 645 -ZO 7 6 13 ?oo -7i5 3 5 8 7/5 - 73o I q 5 73o - 746 O b b 745 -bz 7 6 �3 00-816 2 ,6 8 815-83o I 5 b 6 845 - 4 9 13 c9D -916 f b 7 • EAST MICHIGAN AVENUE/JONES ST. TRAFFIC COUNTS, April 20, 1994 STUDIO DE DANSE TOTAL TRAFIC t_.::. try � \ nr` h. � •QM .t„;�,, 7 / { tA0e6' REVITALIZATION PLAN