HomeMy WebLinkAbout1985 Downtown Traffic Circulation Study Opening the 200&300 Blocks of S Washington AveDOWNTOWN TRAFFIC
CIRCULATION STUDY
OPENING
THE
200. AND 300 BLOCKS
OF
SOUTH WASHINGTON AVENUE
PUBLIC SERVICE DEPARTMENT
HOWARD G. MC CAFFERY
DIRECTOR
TRANSPORTATION DIVISION
DAVID A. BERRIDGE
TRANSPORTATION ENGINEER
JUNE 1985
TABLE OF CONTENTS
LIST OFFIGURES ..................ii
LIST OFTABLES ..................iii
.
INTRODUCTION .....,........."...1
. Angle Parking Requirements y . . . . . . . .
. . . 1
Alternatives . . . . . . . . . . . . . . . .
'
. . . 2
ALTERNATIVES ANALYSIS . . . . . . . . . . . .
. . . 2
^ Traffic Flow Impacts . . . . . . . . . . . .
. . . 2
Traffic Circulation . . . . . . . . . . . . .
�
. . . 3
_ Parking Operations . . . . . . . . . . . . .
. . . 4
Loss -of Parking Spaces . . . . . . . . . . .
. . . 5
Pedestrian Safety . . . . . . . . . . . . . .
. . . 5
` Traffic Safety . . . . . . , . . . . . . . .
. . . 6
IMPLEMENTATION COSTS . . . . . . . . . . . .
. . . 9
`
OTHER CONSIDERATIONS . . . . . . . . . . . .
. . . 10
Meters for the 100 Block Mill . . . . . . . .
. . . 10
Opening the 100 Block at Michigan Avenue . .
. . . 1.0
SUMMARY . . . . . . . . . . . . . . . . . . .
. . . 12
APPENDIX
r.
i
LIST OF FIGURES
FIG.
1 -
EXISTING CIRCULATION PATTERNS . . .
. . . 7
FIG.
2
- POSSIBLE
CIRCULATION PATTERNS
200
AND 300 BLOCKS OPEN . . . . . .
. . . 8
FIG.
3
- POSSIBLE
CIRCULATION PATTERNS
100,
200 AND 300 BLOCKS OPEN . . . .
. . . 11
' M.
4
- 200
BLOCK EXISTING LAYOUT . . . . .
. . . A 1
FIG.
5
- 200
BLOCK ALTERNATIVE 1 LAYOUT . . .
. . . A 2
FIG.
6
- 200
BLOCK ALARNATIVE 2 LAYOUT . . .
. . . A 3
FIG.
.`
7 -
300
BLOCK EXISTING LAYOUT . . . . .
. . . A 4
FIG.
`
8
- 300
BLOCK ALTERNATIVE 1 LAYOUT . . .
. . . A 5
FIG.
9 -
300
'
BLOCK ALTERNATIVE 2 LAYOUT . . .
. . . A 6
i�
ii
LIST OF TABLES
TABLE 1 - PARKING SPACE COMPARISON . . . . . . . . 5
TABLE 2 - ACCIDENT HISTORY . . . . . . . . . . . . 6
TABLE 3-COST ESTIMATES .............9
FA
DOWNTOWN TRAFFIC CIRCULATION STUDY
OPENING THE 200 AND 300
BLOCKS OF SOUTHWASHING7[QN AVENUE
INTRODUCTION
JUNE 13, 1985
The nature of the downtown commercial/retail environment
. continues to change with each passing year. Prior to 1978South
Washington Avenue was closed from 8AM-6PM for attended parking
and opened in the evenings for traffic circulation" Between 1978
and 1980 the City decided to develop a pedestrian oriented
environment in the 100, 200 and 300 blocks of South Washington
Avenue. As a result each block was closed at one end and
attended parking equipment and gates were installed at the other
end. These modifications resulted in: creation of parking areas
only accessible via the one-way streets in the Central Business
District: elimination of drive -by (through) traffic in front of
the commercial/retail areas; an environment which favored
' pedestrian activity over vehicular movement: and the loss of man
parking spaces due to the construction of the landscaped islands.
At the time the plan was implemented, the general concensus of
the downtown merchants was that this type of pedestrian oriented
environment was desirable. During the ensuing years, many
changes have occurred in the downtown merchant/retailer make-up.
As a result, the issue of changes to the traffic circulation
patterns, in particular, the possible opening of the Washington
Mall for two-way traffic flow has been raised frequently.
The Lansing City Council has requested that the Administration
prepare a report focusing on the opening of the 200 and 300
blocks of South Washington Avenue to two-way traffic (Public
Properties and Safety Committee Report dated April 1, 1985).
This report addresses the physical changes which would be
required, costs and the traffic and parking impacts.
Angle Parking Requirements
Existing physical conditions in each block are essentially the
' same. They consist of landscaped islands designed to support 90
degree parking in a small parking lot type environment and
curb -to -curb widths of 64 feet. This width is not sufficient to
allow proper access to adjacent 90 degree parking spaces without
conflicting with oncoming traffic" Two-way free -flow traffic in
these blocks would require the implementation of directional
^' angle parking in order to create acompatible environment between
traffic flow and parking. Angle parking would eliminate
conflicts with opposing traffic during the parking and unparking
- maneuvers.
DOWNTOWN TRAFFIC CIRCULATION STUDY-1
JUNE 13, 1985
Alternatives -
Given that angle parking is specifically required, there are
three alternatives available:
Alternative Qu Work within the existing island dimensions and
restripe the parking spaces to 60 degrees.
Alternative : Modify the design of the existing islands to
support 60 degree angle parking more efficiently"
Alternative (3): Remove all of the landscaped islands and work
with "clean" block faces to maximize 66 degree parking
efficiency.
Since the 100 and 400 blocks would continue to be landscaped and
present a generally pleasing environment, Alternative Number 3
was deemed to'bednconsistent with the overall downtown plan and
not considered further. Alternatives Number 1 and Number 2 were
analyzed in detail.
ALTERNATIVES ANALYSIS
Traffic Flow Impacts
The opening of the Washington Mall would necessitate the
upgrading of three existing traffic signals along Washington
Avenue. These signals currently operate stop and go for
eastbound and westbound traffic and would continue to operate
with their existing timings and splits, which favor both
east -west traffic progression -and north -south pedestrian
movements. An analysis of progression along Washington Avenue
was performed. It indicated that only limited northbound
progression exists during the various timing plans currently
utilized daily in the CBD. There would be no signal progression
for southbound traffic on Washington Avenue.
Since the signal progression would be poor, it is anticipated
that little through traffic would be diverted from Grand Avenue
or Capitol Avenue, as these streets have very good 'rogres;ion.
It should be emphasized that traffic diverting from other streets
to Washington Avenue would do so because it would generally have
predetermined business in the area and not because of the
desirability of the route. The only exceptions to this general
statement might be for westbound to southbound traffic on
Washtenaw which currently utilizes Capitol Avenue and possibly
eastbound to northbound traffic on Kalamazoo Street which
currently uses Grand Avenue. Based on the high travel desire for
these movements, some diverson to Washington Avenue might occur.
DOWNTOWN TRAFFIC CIRCULATION STUDY-2
JUNE 13, 1985
Low levels of service (congestion) along -Washington Avenue can be
expected for several realons:
(1) limited traffic signal progression as detailed above;
(2) only one lane of traffic flow in each direction;
(3) requirement that through traffic wait while parked vehicles
back into the roadway; and '
^ (4) the presence of delivery vehicles stopped along Washington
Avenue.
'
' Delivery vehicles are cu rently allowed into the parking lots and
cause few operational problems once inside, generally parking in
vacant spaces. In some cases, these vehicles park along the
existing islands which sometimes hampers, but does not totally
restrict parking lot operation. If Washington Avenue is modified
to serve twn-laoe two-way traffic operation, delivery vehicles
parking parallel along the islands would force through traffic
into oncoming traffic. Therefore, such parking would have to be
prohibited and strictly enforced.
` Some delivery activity occurs along the curb areas along the
east -west streets where the Washington Mall is currently closed.
This area would also be lost if the blocks were open for two-way
` traffic. Such a reduction in delivery vehicle dwell areas may
cause hardships for some businesses which cannot be served by the
existing CBD alley system.
Some of the long-time downtown merchants have expressed their
recollections of these,operational problems occurring in the past
when Washington Avenue was open and delivery vehicles routinely
blocked parked vehicles in the spaces for (in some instances)
long periods of time.
Traffic Circulation
' The opening of the 200 and 300 blocks of the Washington Mall
would improve some aspects of downtown traffic circulation.
Visitors to the core CBD commercial/retail establishments would
` b
e permitted to circle through IQ area along mang new travel
/Pal.ls, Travel distances would be reduced and improved access to
available parking would be created. Major one-way north -south
arterials (Grand and Capitol) would remain unchanged, and, the
major east -west arterials (Washtenaw, Kalamazoo, and Allegan)
could also remain one-way with no impact on the core CBD
circulation improvements created by opening the 200 and 300
' blocks.
Given the concept that east -west and north -south arterials retain
their current one-way operation and current signal timings, the
impact of opening the 200 and 300 blocks of the Washington Mall
._ on downtown traffic would be minimal. Travel times along the
arterials would remain essentially unchanged.
DOWNTOWN TRAFFIC CIRCULATION STUDY-3
JUNE 13, 1985
Figure 1 shows the existing travel patterns and Figure 2 shows
the proposed travel patterns in the core area of the CBD.
Parking Operations
The existing operation of the mall parking lots require
attendants and parking gates. Two different control concepts
were considered for the through traffic scenari& a "master
meter" and conventional parking meters.
An innovative concept, the "master meter" consists of a centrally
located device, which controls all parking spaces in a confined
area. Due to the wide variation in travel patterns of the
drivers after they leave their vehicles, it was determined that a
minimum of six (6) machines would be required to control the two
blocks. At a cost of $8,000 - $12,O00 per machine the total cost
of this concept is substantially higher than if conventional
parking meters were used. In addition, the use of pawking meters
would eliminate adverse walking distances for the public after
they park their vehicles.
Therefore, thp recommended parking control for the open blocks
would be parking meters. This method would also be consistent
with the operation of the 400 block of South Washington Avenue.
Parking meters would be purchased with the token acceptance
feature similar to all other meters used in the commercial/retail
core of the CBD.
Time limits on the meters could vary within each block based on
the needs of the businesses. Further input would be required
from the businesses regarding this issue. However, the
recommended maximum time limit would be two (2) hours in order to
encourage parking turnover"
Installation of parking meters in the 200 and 300 blocks would
substantially reduce the number of attended parking spaces in the
Washington Mall retail area and reduce the viability of the
existing merchant validation (rubber stamp) program. Merchants
could continue to use the parking token system to provide free
customer parking.
The use of the tokens is geared toward the repeat visitor rather
than the one time or infrequent visitorL Parking meters require
immediate payment by'the visitor, whereas, attended parking
allows payment at the end of the visit. Merchant validation at
the attendant booth permits customer reimbursement for the
initial visit. Parking tokens issued by the merchant to the
customer (visitor) provide a reimbursement mechanism, however,
they must be retained and used on subsequent visits to the CBD.
Parking meters also require enforcement and issuance of parking
tickets. This particular aspect of parking enforcement has been
absent from the Washington Mall area of the CBD for more than 10
years.
DOWNTOWN TRAFFIC CIRCULATION STUDY-4
JUNE 13, 1985
Loss of Parking Spaces
Table 1 summarizes the number of parking spaces available for
each alternative in each block, as well as the number of existing
spaces. A review of Table 1 indicates that the change in the
number of spaces would be as follows:
Alternative #1: 200 block 14 spaces lost, 300 block 16 spaces
lost;
^ � �
Alternative 02: 200 block 8 spaces lost, 300 block 9 spaces
lost.
,
The combined overall loss of parking spaces for both blocks for
Alternative 01 is 30 spaces (28.8%) and for Alternative 02 is 17
spaces (16.3%). -----
PARKING SPACE COMPARISON
200 BLOCK
ALTERNATIVE 1 36
ALTERNATIVE 2 42
EXISTING CONDITIONS 50
LOST SPACES
ALTERNATIVE 1 14
ALTERNATIVE 2 8
TABLE 1
Pedestrian Safety
300 BLOCK
38
45
54
16
�
9
Pedestrian/vehicular conflicts would increase at the new
' intersections. Although the intersections would be controlled by
walk/wait indications, the presence of additional vqhicular
traffic in these high pedestrian traffic areas woul,(cause a.
, increase in accident potential.
Man' pedestrians currently cross in mid -block locations all along
the mall. Such crossing activity is due to the general
pedestrian atmosphere which exists in the area today and is of*
course legal. This atmosphere is present due to the absence of
through traffic, the existing parking lot environment and the
high levels of pedestrian activities. The mid -block crossing
activity is a result of the desire of pedestrians to make ran'fi`
stops at the existing businesses fronting on both sides of the
Washington Mall.
If the Washington Mall is opened, two-way traffic will
dramatically alter the pedestrian environment. Existing
pedestrian desires to cross at mid -block locations will remain
DOWNTOWN TRAFFIC CIRCULATION STUDY-5
JUNE 13, 1985
unchanged and it is assumed that the increased traffic congestion
at the newly opened intersections might actually increase the
attractiveness of mid -block crossing for the pedestrians.
Therefore, a condition would be created where pedestrians would
routinely be crossing at midblock locations between parked cars
into two-way traffic flow. This is not a desirable situation
from a pedestrian safety standpoint.
Traffic Safetg
The presence of two-way tOaffic along Washington Avenue will
result in increased accident potential. Vehicle backing
accidents are currently occurring in all four blocks of South
Washington Avenue. Table 2 provides a listing of accident totals
for all four blocks including the 400 block (which is currently
open to two-way traffic). Total parking accidents are somewhat
higher in the open 400 block as compared to the other three
blocks which are currently closed. Therefore, it is anticipated
that accidents might increase in the newly opened blocks. The
increase would be dependent upon the amount of parking activity
in a� block and the volume of through traffic. In general parking
activity is higher in the 200 and 300 blocks than in the 400
block.
ACCIDENT HISTORY
INVOLVING PARKING VEHICLES
1985
2
1
1 ' 2
1984
1
2
3 2
1983
1
2
2 1
1982
1
1
O 3
1981�
� 1
1
1 1
TOTALS
6
7
7 9
TABLE 2
There would also be increased accident potential at the newly
opened intersections. However, if the east -west streets remained
one-way, the increase would be less than if the east -west streets
were converted to two-way traffic.
DOWNTOWN TRAFFIC CIRCULATION STUDY-6
ALLEGAN
JUNE 13Y 1.9B5
WASHTENAW
KALAMAZOO
... ... ... .., I . . .... ... ... . ... . ... . ... ... ... j%
G A. I,k c'. ".. L. F, 1 .1. 'Ui N! i- .*,,.i 1 K ; ,
— MICHIGAN -
L� t 1 II IL
FIGURE 1*
DOWNTOWN TRAFFIC CIRCULATION STUDY-7
JUNE 13, 1985
POSSIBLE CIRCULATION PATTERNS
200 AND 300 BLOCKS OPEN
g ~_
FIGURE 2
DOWNTOWN TRAFFIC -CIRCULATION STUDY-8
JUNE 13, 1985
TRAFFIC SIGNAL
MODIFICATIONS
SIGN WORK
PAVEMENT MARKINGS
RESTRIPING
PARKING EQUIPMENT
REMOVAL
PARKING METERS
BOOTH ISLAND
REMOVAL
INTERSECTION
MODIFICATIONS
ISLAND
- MODIFICATIONS
CONTINGENCY (15%)
TOTAL COST
COST ESTIMATES
200 BLOCK
ALT. 1 ALT. 2
$3000 $3000
400 400
150 150
350 400
1000 1,0OO
7,570 8,830
1/500 1000
5,780 5,780
'
-- 3,890
3,200 3000
$23,750 $29,550
TABLE 3
300
BLOCK
ALT. 1
ALT. 2
$3,900
$3000
400
400
150
150
350
400
11000
.11000
7,990
9,460
- 1000
1,500
7,070
7070
--
3,880
1,350
47100
$25010 $31,860
IMPLEMENTATION COSTS
^
There are several major work items which would be required to
_ open the 200 and 300 blocks of the Washington Mall. The cost
estimates given in Table 3 detail these costs. The following
major work items would be required: `
1) Traffic signal modifications
2) Sign work, pavement markings and restriping
3) Parking equipment removal and installation
^' 4) Roadway modifications _
'
5) Mall island modifications (optional)
..
DOWNTOWN TRAFFIC CIRCULATION STUDY-9
JUNE 13, 1985
Alternative 1 could be implemented for approximately $49,400.
This would create two-way traffic flow in the 200 and 300 blocks
with 74 parking spaces (a loss of 30 spaces). Alternative 2
could be implemented for approximately $61,400. This would
create two-way traffic flow in the 200 and 300 blocks with 87
parking spaces (a loss of 17 spaces).
OTHER CONSIDERATIONS
Meters for the 100 Block Mall
The installation of parking meters in the 200 and 300 blocks will
result in the loss of 104 spaces out of 144 attended parking
spaces in the Washington Mall commercial/retail core of the CBD.
As previously stated this would have a very severe impaCt on the
existing merchant validation program. The remaining attended
parking area in the 100 block could function independently,
however, the possibility of converting this block to metered
operation without opening the street to two-way traffic should be
evaluated in the future if changes are made in the 200 and 300
blocks. If it is determined that a metered parking area with
token acceptance capabilitiei would service the 100 block
business environment satisfactorily, this operationalchange
could be implemented in conjunction with the opening of the 200
and 300 blocks or at some later time.
Opening the 100 Block at Michigan Avenue
The proposed improvement to Mic'higan Avenue between Capitol
Avenue and Grand Avenue, more commonly referred to as the
"Approach to the Capitol" project, is currently in the
feasibility study stage. One of its major features is a
traffic/pedestrian circle at the intersection of Washington
Avenue and Michigan Avenue. The core CBD commercial/retail
district could benefit from further circulation improvements and
enhanced access/egress if a "full -function" traffic circle could
be constructed at the intersection of Michigan Avenue and
Washington Avenue (see Figure 3). The current design of the
traffic circle does not lend itself well to opening Washington
Avenue at Michigan Avenue for two -wag traffic flow. However,
since this project is in preliminary desieVonly, modifications
can be considered and evaluated. There are many operational
details regarding this concept which need to be considered that
are not addressed in this report. However, it warrants further
study, and will be evaluated as part of the "Approach to the
Capitol" analysis. If feasible and desirable, it could be
implemented in conjunction with the "Approach to the Capitol"
project.
DOWNTOWN TRAFFIC CIRCULATION STUDY-10
CAPITOL
BLDG.
ALLEGAN
WASHTENAW
KA LA MAZOO
JUNE 1.3y 1.985
POSSIBLE CIRCULATION PATTERNS
1.00, 200 AND 300 BLOCKS OPEN
MICHIGAN
................................................ ....... ...
FIGURE 3
DOWNTOWN TRAFFIC CIRCULATION STUDY-11
JUNE 13, 1985
SUMMARY
As circulation and parking needs change in the downtown area,
plans must be developed and evaluated to address those needs. It
was not the intent of this report to study, evaluate or judge the
necessity of opening the 200 and 300 blocks of the South
Washington Mall to two-way traffic" The purpose of this report
was to evaluate the feasibility and impact of this specific
project as proposed by the City Council.
In summary:
, --- It is feasible to open the 200 and 300-blocks of the South
Washington Mall for two-way traffic and parking.
--- Parking in these blocks would have to be converted from 90
degrees to 60 degrees.
--- Parking spaces would be lost in each block depending on the
alternative selected.
--- Parking losses would range from 30 spaces (28.8%) to 17
spaces (16.3%) depending on the alternative selected.
--- Parking meters with various time limits, up to a two-hour
' maximum, would be recommended to control the parking spaces.
'
--- Parking enforcement would be required in an area where there
has been no enforcement.
�
--- Congestion along Washington Avenue should be expected.
--- Problems could develop with delivery vehicles.
--- Assuming no other changes are made to other existing arterial
streets in the CBD, the overall impact on traffic flow would
be minimal.
--- TrIffic safety along Washington Avenue would be reduced and
accidents could increase, but to what extent is unknown.
--- Pedestrian/vehicular conflicts would increase.
--- The pedestrian environment on the Mall would be lost.
�
--- Traffic circulation in the core of the CBD will be improved.
--- Alternative 1 would require no modification of existing
landscaped ifflands, result in a loss of 30 parking spaces and
cost $49,400.
--- Alternative 2 would require some modifications to the
existing landscaped islands, result in a loss of 17 parking
~ spaces and cost $61,400.
DOWNTOWN TRAFFIC CIRCULATION STUDY-12
APPENDIX
200 BLOCK S. WASHINGTON SQUARE
4
' -IN k-
`
IIIIII�
W
U)
EXISTING CONDITIONS
50 SPLICES
4
200 BLOCK S. WASHINGTON SQUARE
ALTERNATIVE N0, I
36 SPACES
1`
U)
A 2
,
m .
\\ I
200 BLOCK S. WASHINGTON SQUARE
i z
ALTERNATIVE NO. 2
42 SPACES
A 3
300 BLOCK S. WASHINGTON SQUARE
EXISTING CONDITIONS
54 SPACES
aid
A 4-
300 BLOCK S. WASH INGTON SQUARE
JO
ALTERNATIVE" NO. I
38 , SPACES
A 5
300 BLOCK S. WASHINGTON SQUARE
ALTERNATIVE NO. 2
45 SPACES
A 6