HomeMy WebLinkAbout1985 City of Lansing MI Eastside Transportation StudyCity of Lansing, Michigan
EASTSIDE TRANSPORTATION STUDY
MAY,1985
ACKNOWLEDGMENTS
MAYOR
Terry J. McKane
CITY COUNCIL
Charles Creamer, President James Blair
Lucile Belen Patrick Lindemann
Louis Adado Alfreda Schmidt
Tony Benavides Sidney Worthington
Emly Horne, Chairman
Merle Barnhart
Virgil Langworthy
Charles Mitchner
PLANNING BOARD
James Nelson
Edward Remick
Alice Wieland
Floyd Wright
EAST SIDE TRANSPORTATION STUDY COMMITTEE
- Eastside Neighborhood Organization
Robert Hull - Committee Chairperson
Richard Kibbey
David Geiger
Sue Christian
- Northeast Area Comprehensive Plan, District #10
Jerry Lawler
- East Michigan Business Association
Dan Lindemann
- Potter Park Neighborhood Association
Dixie Pemberton
- Citizens Dist-rict Council #2
Len Tombelli
Heidi Grether
- Eastside Commercial Club
Janalee McClure
Clare Simon
- Northeast Area Comprehensive Plan District #11
Fran Sklapsky
May 15, 1985
Dear Mrs. Horne:
The East Side Transportation Study Committee takes great pleasure in
transmitting the final report of the East Side Transportation Study. The
report was completed with the representation and participation of several
neighborhood and business organizations in the area such as Eastside
Neighborhood Organization,. Potter Park Neighborhood Association, CDC #10,
CDC #11 and Eastside Business Association. The primary support was provided
by the Transportation Planning Staff of the Planning Division with the
assistance of the Transportation Engineering Division.
The Committee met eighteen times and spent numerous hours during the study
to identify the problems and alternatives, discuss the impacts and prepare
recommendations that are all included in this report.
The Study fulfills a long felt need to resolve many of the transportation
related problems on the east side. The Committee hopes that after approval
by the Planning Board, the recommendation will be routed through the appro-
priate process for implementation at an early date.
We would like to thank the City for their cooperation and assistance
provided by the staff in completion of this task.
Sincerely,
Robert Hull, Chairman'
Eastside Transportation Study Committee
Ms. Emly Horne, Chairman
Lansing Planning Commission
Dept. of Planning & Municipal Development
Planning Division
119 N. Washington Square
Lansing, MI 48933
EASTSIDE TRANSPORTATION STUDY
Table of Contents
Page
Executive
Summary
2
Introduction
6
Sec. 1.
Main Street
g
Sec 2.
Aurelius Road/Clemens Avenue
14
A.
Aurelius Road between Mt. Hope Avenue
14
and Elizabeth Street
B.
Clemens Avenue at Kalamazoo Street
19
C.
Clemens Avenue at Michigan Avenue
21
Sec. 3.
Fairview.and Foster. Avenues
24
See. 4.
Sparrow Hospital
28
Appendices
31
PAGE 1
EASTSIDE TRANSPORTATION STUDY
EXECUTIVE SUMMARY
The Eastside Transportation Study was conducted to identify
transportation related issues and problems and propose solutions.
The study, requested by City Council, was completed by a citi—
zens' committee that included representatives from several
neighborhood and business organizations. Committee was supported
by the Transportation Planning staff in the Planning Division
which coordinated the data collection, analysis, evaluation and
writing of the report. Assistance was also frequently requested
and received from Transportation Division and the City Engineer.
The identification of problems and alternatives reflects the
recommendations of the Committee.
1. Study Area:
The study area included the portion of the City
generally bounded on the north by Grand River Avenue,
on the east by the City Limits, on the south by the
Red Cedar River., and on the west by Pennsylvania Ave.
2. Scope of Study:
The Committee decided to examine the problems of
following categories:
1. Auto traffic, speed and volumes
2. Truck traffic
3. Parking on residential streets
4. Intersection design
5. Pedestrian/Bicycle safety
3. Major Areas of Concern:
This study focuses on four of the major areas
within the scope of the study. These are:
1. E. Main Street,
2. Aurelius Rd./Clemens Ave. (Mt. Hope to
Saginaw St.),
3. Fairview Ave. and Foster Street (between
Saginaw St. and Grand River Ave.), and
4. Parking for Sparrow Hospital.
Following is a brief description of the problems, concerns
and recommendations for each of the four areas listed above:
PAGE 2
a. E. Main Street
Since 1972 when the widening of Aurelius Rd. took place
north of Mt. Hope Ave., Main St. has been serving as a
link and collector for the downtown area. The area along
this portion of Main St. from Aurelius Rd. to
Pennsylvania is lined with commercial, industrial, resi-
dential and railroad .right-of-way. On account of the
amount of through traffic and also service to the local
area, Main St. presents a number of issues discussed in
this report.
Problems and Concerns:
i. Pedestrian Safety (Holmes at Main
Street and Heald Place).
ii. Visibility at the corner (Holmes at
Main).
iii. Speeding Traffic/Truck Traffic.
iv. Roadway appearance.
Recommendations:
i. Install more visible stop lines at the
intersections and pedestrian crosswalks
at Holmes/Main and Heald Place/Main
intersections.
ii. Complete curb and gutter along Main
Street.
iii. Monitor the pedestrian crosswalk
performance by conducting pedestrian
surveys during summertime in cooper-
ation with the Potter Park Neighbor-
hood Association, and evaluate the
situation if any remedial action is
needed.
iv. Do not .relocate the roadway.
v. Retain Main Street's current street
classification.
b. Aurelius Road/Clemens Street
Three locations were identified by the
Committee for special study:
i. Aurelius Road between Mt. Hope -Elizabeth
Problems and Concerns
The excessive width and a six lane cross
section on Aurelius Road north of Mt. Hope
for a length of almost one.mile to the
bridge over I-496 leads into a narrow two-
lane road and residential area.
PAGE 3
ii.
This section of roadway has no provision
for pedestrian and bicycle traffic.
The Committee believes that section of road
encourages the people to drive at higher
speeds into the residential area near
Elizabeth Street.
Recommendations
Reduce the roadway to two lanes after
500 feet north of Mt. Hope to connect
with Clemens. Add bicycle path providing
service to Potter Park consistent with Red
Cedar Hiking —Biking Path and with the
existing path south of Mt. Hope along
Aurelius Road.
Intersection of Clemens at Kalamazoo
Problems and Concerns
Difficulty in turning for eastbound—to—
southbound vehicles due to narrow lane
at intersection.
Recommendations
Improve the radius of the southwest
corner and relocate curb to provide
additional width. _
Intersection of Clemens at Michigan
Problems and Concerns
On account of vehicles waiting to turn
left into the municipal parking lot south
of Michigan Avenue, delays are caused for
southbound vehicles at the intersection.
Recommendations
Of the two entrances to the parking lot on
Clemens Avenue, the entry be restricted
to the southern curb cut and prohibited at
the northern curb cut during peak hours
to keep the waiting vehicles away from the
intersection.
PAGE 4
c.
d.
Foster/Fairview Ave. between Saginaw and
a an
Problems and Concerns
Excessive traffic and hence difficulty in
getting in and out of driveways.
Recommendations
As the traffic survey indicated insignifi-
cant -delays for very short periods of time,
no action was recommended at this time;
however, the Committee recommended to
re-evaluate the traffic flow situation
after the proposed signal at Fairview and
Grand River Avenue is installed by MDOT
this year.
Parking on Residential Streets adjacent to
the Spa.rr.ow Hospital
Problems. and Concerns
Sparrow Hospital over the past few years
has had parking problems for its staff and
visitors. The Sparrow complex is land-
locked.and surrounded by commercial,
educational, and residential uses. Approxi-
mately 100-150 hospital -related vehicles per
day park on the streets around the hospital.
It is realized by the Committee that the
parking problems around the medical complex
are directly related to the present and
future.development of the Michigan Ave./
Sparrow Medical Complex and the Boys
Training School site and that the use/master
plan process would be a more appropriate
forum for addressing the problem.
Recommendations
i. No building permits for major additions
be issued unless the parking needs of
the hospital are met.
ii. That representatatives of the hospital,
Eastside Neighborhood Organization, and
other interested parties as part of the
land use study identify and develop
acceptable and feasible methods to
meet the present and long range needs
of the hospital.
iii. Amend the Zoning Ordinance's parking
requirements to meet the needs of the
modern day hospital. .
PAGE 5
INTRODUCTION
This report documents the results of study of the transpor-
tation problems on the east side of the City of Lansing conducted
by the Eastside Transportation Committee. The Committee con-
sisted of the representatives of several neighborhood organiza-
tion which included the following:
- Eastside Neighborhood Organization
Robert Hull - Committee Chairperson
Richard Kibbey
David Geiger
Sue Christian
- Northeast Area Comprehensive Plan, District #.10
Jerry Lawler
- East Michigan Business Association
Dan Lindemann
- Potter Park Neighborhood Association
Dixie Pemberton
- Citizens District Council #2
Len Tombelli
Heidi Grether
- Eastside Commercial Club
Janalee McClure
Clare Simon
- Northeast Area Comprehensive Plan District #11
Fran Sklapsky
The Committee has had 18 meetings beginning in November of
1982. The dates of these meetings are listed in the appendix.
This report is a culmination of these meetings and many hours of
data collection, compilation and analysis.
The Committee was chaired by Mr. Robert Hull from the
Eastside Neighborhood Organization.
The study was first requested by the Lansing City Council in
1978 but could not be initiated at least until the completion of
the Master Plan for the area.
PAGE 6
Study Area (Fig. 1)
The study area included the portion of the City generally
bounded on the north by E. Grand River Avenue, on the east by
the City limits, on the south by the Red Cedar River and on'the
west by Pennsylvania Avenue.
STUDY AREA BOUNDARIES
SPECIFIC AREAS OF STUDY
EAST MAIN STREET
A,B,C, AURELIUS RD BETWEEN
MT HOPE AND MICHIGAN
FOSTER, FAIRVIEW BETWEEN
SAGINAW ANQ GRAND RIVER
PARKING NEAR SPARROW HOSPITAL
EASTSIDE TRANSPORTATION STUDY
PAGE 7
Scope
At the beginning of the study, the Committee agreed upon a
list of issues that should be included in this project which are
listed as follows:
a. Auto traffic (quantity and speed) on residential
streets
b. Truck traffic on residential streets
c. Parking on residential streets
d. Functional/Design aspects of street -network
e. Pedestrian/Bicycle safety
Methodology
The steps followed in the study included:
a. Identification of the problems;
b. Ide.ntification of possible alternatives to the
problems;
C. Collection of data needed for evaluation of
the problems 'and alternatives;
d. Evaluation of the alternatives; and
e. Recommendations for resolution of the
identified problems.
The report after adoption by the Eastside Study Committee
will be submitted to the Planning Board and the City Council for
action.
Major Issues
As a result of these meetings and a review of the master
plan for the area, four major areas of,,,poncern were recognized by
the Committee:
A. Main Street
B. Aurelius Road/Clemens Avenue
C. Fairview Avenue and Foster Street
D. Sparrow Hospital: Parking in adjacent
neighborhoods
This report deals with each one of these issues which is
described in detail in the following sections.
PAGE 8
1. MAIN STREET (BETWEEN PENNSYLVANIA AVENUE AND AURELIUS ROAD)
1.1 Introduction
Since 1972 when the widening of Aurelius Road took place
north of Mt. Hope Avenue, Main Street has been serving as a link
and collector for the downtown area. The area along this portion
of Main Street from Aurelius Road to Pennsylvania is lined with
commercial, industrial, residential and railroad right-of-way.
On account of the amount of through traffic and also service to
the local area, Main Street presents a number of issues discussed
in the following paragraphs. Residents strongly oppose reloca-
tion and/or reclassification of Main Street.
1.2. Problem Identification
Problems that are identified by arearesidents and the Com-
mittee are (see Fig. 2).
1. Pedestrian Safety (Holmes at Main Street and
Heald Place)
2. Visibility at the corner (Holmes at Heald
Place)
3. Speeding' Traffic/Truck Traffic
4. Roadway appearance
Fig. 2IT
I HAIN STREET
PROBLEM IDENTIFICATION
1. PEDESTRIAN SAFETY
• 2. VISABILITY
3. SPEED AND TRUCE TRAFFIC
6 4. ROAD APPEARANCE
HAR
LIMAX
HucnN BCO[k
MECHAN co.
HAZEL L
a w
INCO PARKVIEW
PER INNS
PAGE 9
1 .2.1 Pedestrian Safety
Pedestrian safety concerns arise particularly during the
summer when many neighborhood children walk or ride bikes to
Hunter Park just north of I-496. The greatest generator of
children traffic to and from the park is the public swimming
pool. Since the park is located north of I-496, the children
south of I-496 use Holmes Street, the only pedestrian link be-
tween the two areas. Main Street and Heald Place are both
westbound through traffic streets where they intersect Holmes.
The unusual geometry of this intersection creates a hazardous
situation for pedestrians. The only devices that warn motorists
of the pedestrians crossing the streets are a warning sign and
crosswalk lines which are not considered adequate by the area
residents.
Main Street carries approximately 4,400 vehicles per day
according to a 1984 traffic volume survey. The speed of traffic
represented by the 85th percentile on Main Street near Holmes is
31 mph. A pedestrian count is scheduled for the summer of 1985•
Accident records for the years of 1981 through 1984 indicate no
accidents involving pedestrians.
Alternatives
Possible alternatives for increasing the safety of,pedes-
trians .at the crosswalks have been identified by the Committee
as:
A. Install the more visible "zebra" style painted
crosswalks on the east side of Holmes at Heald
Place and Main Street.
B. Install pedestrian actuated signals if the
first alternate is proven inadequate and/or the
future surveys warrant such installation.
Conclusions
The current available data does not indicate the need for
extensive pedestrian signal devices but the concern does illus-
trate the need for more visible crosswalks.
PAGE 10
1.2.2 Visibility at the Corner of Holmes/Main
A visibility/sight distance problem has been identified for.
southbound Holmes trafffic at Main. When stopping at Main Street
intersection, the driver has to pull close to the traffic lane
for Main Street to see around the office building on the north-
east corner of the intersection.
Alternatives
The solution identified by the Committee is to relocate the
stop bar and replace it with the more visible 24" wide cold
plastic stop bar at the location where sight distance is the
greatest.
Conclusions
The sight distance is restricted at the cor.ner and a stop
bar at the appropriate place for•southbound Holmes traffic at
this intersection is needed.
1.2.3 Speeding/Truck Traffic
The speed of traffic and the number of trucks have been
identified as problems on Main Street. Trucks which have no
destination/origin on Main Street sometimes use Main Street.
Main Street is not a truck route therefore making it an illegal
route for through trucks.
Axle count data indicate that the level of traffic with
three axles or greater, fluctuates •from 1% to 3% depending upon
the study location. Some of these vehicles have origins or des-
tinations on Main Street and are -legally authorized to use the
Street.
A speed survey for Main Street which has a speed limit of 25
mph indicates the following:
- 85th percentile - near Shepard 36 mph
- 85th percentile - near Holmes 31 mph
Note: The 85th percentile speed is.the speed which 85
percent of the vehicles surveyed did not exceed.
PAGE 11
Alternative
The alternative identified by the Commmittee is that of
better enforcement of the speed limit and the truck route ordi—
nance.
Conclusions
While some of the trucks do have origins/destinations' on
Main Street, others do not, and may be violating the truck route
ordinance. There are other routes for the drivers of these
trucks to take and should be encouraged to do so. Also, the
speed of the traffic is significantly above the speed limit. A
greater amount of enforcement is necessary to eliminate these two
problems.
1.2.4 Roadway Appearance/Public Safety/Maintenance
Approximately 1,800 feet of Main Street does not have curb
and gutter. This area runs from approximately Dakin Street to
Regent Street, and Martin Block is located in the middle of this
section of the roadway on the south side of Main Street. The
unsurfaced gravel parking lot of Martin Block Company can be ac—
cessed anywhere along its property frontage. The appearance of
this area is poor with shoulders of the roadway merging at the
same level with the parking lot of Martin Block Company. The
lack of curb and gutter increases maintenance cost due to surface
failure. The surface failure is compounded since heavy trucks
enter and exit the street at sharp angles because of the lack of
specific access points.
Alternatives
The alternative suggested. by the Committee is to,install
curb and gutter and provide appropriate curb cuts.
Conclusions
Since this strip of roadway is the only portion of Main
Street that does not have curb and gutter, curb and gutter should
be installed by Council order, if necessary, and the roadway
resurfaced. Also property owners would have well defined access
points improving traffic and pedestrian safety while properly
giving an edge to the roadway reducing road maintenance.
PAGE 12
1.3 RECOMMENDATIONS
The Committee recommends the following:
1. Pedestrian Safety (See Fig. 3):
a. Install more visible "zebra" style painted crosswalks on
the east side of Holmes Street and Heald Place and Main
St.
b. Monitor the pedestrian crosswalk performance by conductng
pedestrian surveys during summertime in cooperation with
Potter Park Neighborhood Association and evaluate the
situation if any remedial action is needed.
2. Visibility/Sight Distance (See Pig. 3):
Relocate the stop bar and install the more visible 24" wide
cold plastic stop bar at the best location for southbound
Holmes traffic at Heald Place to improve visibility at that
corner.
3. Speeding Traffic/Truck Traffic:
Enforcement of the speed and truck route ordinance.
4. Roadway Appearance/Public Safety/Maintenance:
Resurface and install curb and gutter on the remainder of
Main Street without widening the road leaving appropriate and
well defined access points to improve traffic safety.
Eleven foot lanes are recommended.
Curb and gutter shall be installed by petition, or if need
be, ordered by City Council.
5. Do not relocate Main Street.
6. Do not reclassify the Main Street road classification.
24" WIDE STOP BAR
FOR IMPROVED SIGHT DISTANCE
FIG 3
RECOMMENDATIONS
MAIN ST. AT HOLMES ST.
ZEBRA STYLE PEDESTRIAN
CROSS WALK
PAGE 13
2.0 AURELIUS ROAD/CLEMENS STREET
1 2.1 Introduction
As part of the 1958 City Master. Plan, a recommendation was
made regarding the possible demand for a north -south route for
regional travel, east of Pennsylvania and west of a proposed
interstate, later constructed as US-127. Although no immediate
action was taken on this route, planning and construction pro-
ceeded on both'US-127 and I-496, an urban interceptor route that
divided the east side. Regional north -south traffic moved
through the east side on US-12.7, Pennsylvania Avenue, and along
the Cedar -Larch corridor..
When in 1964 the then City Traffic Department proposed es-
tablishment of a pair of one-way streets through the middle of
the eastside in the vicinity of Clemens Street, the plan met
considerable community opposition. Although a four -lane bridge
over I-496 linking Aurelius Road to Clemens Street was completed,
no further action on the route was taken. In February 1978, City
Council passed a policy resolution opposing further consideration
of the Aurelius -Clemens route for north -south through traffic.
Additional origin -destination studies done as part of this report
confirmed that there is not now -nor is there in the forseeable
future sufficient demand to justify a north -south route connect-
ing Aurelius -Clemens -Wood Street. Clemens Street remains a typ-
ical east side residential street, 30 feet wide, from Elizabeth
Street on the south to Saginaw Street on the north.
Between Mt. Hope and Saginaw, three problem areas were
identified by the Committee. They are:
A. Aurelius between Mt. Hope and Elizabeth
B. Clemens -Kalamazoo intersection
C. Clemens -Michigan intersection
These have been studied and evaluated with the results and
recommendations presented for each one of these locations in the
following paragraphs.
PAGE 14
-"
71
2.2 AURELIUS BETWEEN MT. HOPE AND ELIZABETH
2.21 Problem Identification. (See Fig. 4)
1. Design of this roadway is inappropriate for its
current and projected use. It is designed for
freeway speeds and volumes but connects abruptly
and directly onto a residential street
(Clemens Ave.) in a densely populated
neighborhood.
2. This section of roadway has no provision
for pedestrian and bicycle traffic.
Alternatives
1. Reduce the roadway to two lanes and add
bicycle and pedestrian lanes.
2. Remove the connector by not rebuilding the
bridge when structural needs so dictate.
3. Move the speed reduction transition zone
farther. south to provide early warning and
a more gradual transition.
Analysis
At the time the road was designed and built it was proposed
to be part of a major north —south arterial connecting Wood Street
with the result that the current roadway is four lanes wide with
additional .right and left turn lanes at the Mt. Hope Avenue
intersection. The roadway is wide and at a significantly higher
elevation than the surrounding land. Typical of expressways and
major arterial roads, there are no street trees to form a canopy
over the roadway. Also, there being no access points (driveways,
side roads, etc.) until Main Street, traffic speeds tend to be
high. To northbound traffic, the Main Street exit resembles an
expressway exit.
PAGE 15
All of these separate elements suggest to motorists that
they are entering an expressway. There is no warning of the
residential neighborhood that lies north of I-496 until motorists
get to the bridge over the expressway. A speed reduction sign
warning of a change in the speed limit (from 40 mph to 25 mph)
then becomes visible. Once over the crest of the bridge motor-
ists suddenly encounter a totally different environment: Clemens
Avenue is 30 feet wide, with one lane running in each direction.
The roadway has a curb, and there are many access points, both
driveways and streets. The houses which line both sides of the
road are higher than and relatively close to the road; in addi-
tion, there are mature trees which form a canopy overhead. In
combination, the setting presents motorists a much more
constricted scene than the roadway just south of I-496. The re-
sult is that motorists typically travel into the neighborhood at
higher than the appropriate rates of speed.
A turning movement study and traffic analysis conducted for
Aurelius Road and Mt. Hope Avenue revealed that .the traffic that
is currently carried on the existing roadway could also be car-
ried safely and efficiently on a new two lane roadway if provided
to the north of the intersections at the current level of service
if the intersection is maintained as it is.
Without changing the intersection design, many things could
be done to help alleviate the identified problems and visually
present the driver with a truer representation of what follows to
the north. These changes are:
- Reduce the road to two lanes from 500 feet north
of the Mt. Hope intersection
- Add bicycle lanes and sidewalks for pedestrians
such that bicycle and pedestrian access is provided
into Potter Park, and linked if possible with the
proposed Red Cedar Hiking -Biking Path.
- Add street trees along the road and
provide parking areas for motorists.
The Committee also discussed the option of abandoning and
not reconstructing the I-496 bridge thus disconnecting the
north -south link. This alternative not only puts off the reso-
lution of the design problem for several years as the bridge was
only constructed in 1972 but also would force more through traf-
fic onto Main Street.
PAGE 16
EASTERN H.S. Q
VINE ST. _
✓EROME
4!
CL /MAX
M HA GR Sr
HAZ L y y
4�i• WALSH h WALSH ST.
PARKV/E Sg h y
O h � PERK/NS ST.
o W R
POTTER PARK
YCAMORE
PARK �NOBF
SUNNygGy
PARKDA Toy
ER INS
Q PE NAG
SHUBEL Q
PARK
Q `' E MT. HOPE
VE p
L R
VE.
o Z SYCAMORE MT. HOPE y
J
4 i , I ` LA SAL!
u GARD,
V/N ST.
2 Z 2 2 J
J
y
J
J
O
EC ST.�
MA 00�s�
Q � R
Q
O DAB
Z O
HA ON 5rz
nn y
FIG 4
AURELIUS/CLEMENS
MT HOPE TO MICHIGAN
PROBLEM IDENTIFICATION
FENNER
AURELIUS - MT HOPE TO ELIZABETH
CLEMENS AT KALAMAZOO
CLEMENS AT MICHIGAN
EVERGREEN
h
PAGE 17
The third alternative included no design change but only
installing warning signs to prepare motorists for entering a
residential area. If, through signs only, motorists were warned,
expecting them to slow down, strict enforcement would be required
for. compliance. The Committee believed that the rate of compli—
ance will be low in such case.
2.22 Recommendation (See Pig. 5)
After evaluation and consideration of all factors, the
Committee recommended the following:
1. Reduce the -roadway to two lanes from approximately
500 feet north of the Mt. Hope intersection.
2. Add bicycle lanes and pedestrian walks with
access into Potter Park and linkage with Red
Cedar Hiking —Biking Path if possible.
3. Plant street trees along the road in the
median and the newly created parkway area.
This recommendation also is consistent with recommendations
made in the North East Area -Comprehensive Plan, 1990.
FIG 5
RECOMMENDATIONS
AURELIUS RD. - MT HOPE TO ELIZABETH
'ROPOSED SECTION
;TARTING APPROX. 500'
INCLUDES BICYCLE PATH,
NORTH OF MT HOPE
TREES, AND TWO LANE ROADWAY
EXISTING SECTION
FOR AURELIUS NORTH OF MT HOPE
(TO BE MAINTAINED FOR APPROX. 500')
PAGE 18
2.3 CLEMENS AVENUE AT KALAMAZOO
2.31 Problem Identification (See Fig. 4)
Clemens Avenue south of Kalamazoo has an approach width of
thirty (30) feet with one (1) 10-foot wide southbound lane and
one extra wide twenty (20) foot lane for northbound traffic. The
10-foot wide southbound lane receives heavy traffic from
Kalamazoo St. There is undue difficulty in movement of traffic
on this narrow lane.
Alternatives
Possible alternatives that have been identified by the Com-
mittee are:
1. Move eastward the centerline of the southerly
leg of South Clemens Avenue. Currently, the
pavement is 30 feet wide and the centerline
is 10 feet from the westerly curb line and
20 feet from the easterly curb line.
2. Reduce the turning radius of the southwest
corner.
3. Remove parking on east curb.
4. Remove curb cuts close to the intersections.
Analysis
The 20 foot wide approach width for -the northbound lane is
to allow for parking along the east curb. When there are no cars
parked along the east curb the turning movements data show that
approximately 25% of the vehicles using the northbound lane use
that extra space for turning right or avoiding left turning
traffic. If the centerline were moved east, the parking lane,
which is currently a convenience for the local residents, would
have to be removed. On the other hand, if the 10 foot wide
southbound lane is improved by reducing the radius of the curb
and tapering it into the 10 foot lane width, the traffic can ma-
neuver the turn relatively more easily than at present.
PAGE 19
The existing curb radius is 15 feet. If a curb radius of
ten (10) feet is utilized, the southbound lane would effectively
gain 5 feet in width at the corner. This could be accomplished
without moving the utility pole on the corner.
It is also possible to modify the 45 foot wide curb cut into
the dry cleaners business which is just south of the intersection
on the west side. The curb cut begins only g feet from the
intersection.
2.32 Recommendations
The Committee recommends the following improvements to be
made on the southerly leg of Clemens Avenue off Kalamazoo (See
Sketch in Fig. 6)s
1. Reduce the turning radius at the southwest corner. from 15
feet to 10 feet, thereby increasing the width of the
southbound lane to 15 feet at the intersection.
2. -Reduce the width of the curb cut into the dry cleaners lo—
cated on the southwest corner on Clemens Avenue by a minimum
of five (5) feet.'
3. Eliminate the on —street parking on the east side of Clemens
south of Kalamazoo, within fifty (50) feet of the intersec—
tion.
MOVE EXISTING CURB -
BACK FIVE FEET
N
KAGgN1AZ00
a a
FIG 6
RECOMMENDATIONS
CLEMENS AT KALAMAZOO
PAGE 20
0
2.4 CLEMENS AVENUE AT MICHIGAN AVENUE
2.41 Problem Identification (See Fig. 4)
The Committee identified four problem areas:
1. Safe and efficient movement of traffic is
hampered due to a 15—foot offset in the
alignment of Clemens Avenue north and south
of Michigan Avenue.
2. Access to the municipal parking lot south of
Michigan Avenue conflicts with the Clemens
Avenue traffic'causing delays.
3. The CATA bus stop location is too close east
of the intersection on Michigan Avenue which
interferes with the right turning traffic from
northbound Clemens Avenue and backs eastbound
traffic on Michigan Avenue into the
intersection.
4. Access to the gas station north of Michigan
Avenue from nor.thbound.Clemens conflicts with
the Clemens Avenue traffic resulting in delays.
Analysis
The necessary information gathered to study this problem
consisted of two separate sets of data.
1. Accident History
While there have been accidents at this inter— section, a
review of the accident history indicates no recorded left
turn accidents on Clemens Ave. at Michigan during the Your
year period from 1981 through 1984.
2. Delay Study
A delay study was conducted to determine if there were
excessive delays in movement of traffic at the intersection.
This study, which compared traffic demand (i.e., number of
vehicles which cleared the intersection during that green/
amber phase) is summarized in the following chart.
PAGE 21
CLEMENS AT MICHIGAN
Number. Of Cycles
When Demand Exceeded Discharge
Time
Northbound
Southbound
Total
----------------- -----------------------------------------
AM (7:30-8:30)
2
0
.2
PM (4:30-5:30)
6
5
11*
Off-peak (Noon-1 :00 PM)
0
0
0
Source: Transportation
Division
* Note:
Nine (9) of the eleven (11) p.m. peak hour cycles where
discharge was' less than demand occurred during a
15-minute period 5:10 and 5:25 p.m. None of the vehicles
which failed to clear the intersection on the first cycle
failed to clear the intersection on the next green phase.
Sometimes it has been observed that the delays in
southbound traffic result due to*dr.iver.s' attempting to
turn onto the Municipal Parking lot (located just south
of Michigan off Clemens) at the northern entrance. This
entrance, being closer to the intersection is sometimes
blocked by'northbound traffic thereby making it difficult
for a southbound vehicle to turn and enter, r.esuiting in
backed up traffic.
Conclusions
Based upon the data obtained, the existing delay, which oc-
curs primarily during a 15-minute period in the evening peak
hour, was found to to be insignificant and is therefore not an
adequate reason for reconstruction of the intersection or moving
the CATA bus stop. This insignificant level of delay is typical
of many intersections in the City.
PAGE 22
Additionally, as the intersection is performing at an ex-
tremely safe level, there is not sufficient cause for the widen-
ing or other major improvement of this intersection. Any widen-
ing of intersections at this location would require acquisition
of property.
2.42 Recommendation (See Fig. 7)
Based upon the above information, it is recommended that no
improvements or changes at this intersection of East Michigan
Avenue and Clemens Avenue.
It is recommended that signage be installed to direct
southbound traffic on Clemens to the southern entrance of the
Municipal Parking Lot south of Michigan Avenue,
ONE WAY OUT ONLY
DURING PEAK HOURS INITIALLY
. V
- I
iC//V /V
FCITYNG LOT
FIG 7
RECOMMEENDATIONS
CLEMENS AT MICHIGAN
PAGE 23
3.0 FAIRVIEW AND FOSTER AVENUES
(Between Grand River Avenue and Saginaw Street)
3.1 Intr.oduction
Concern about Fairview and Foster. Avenues between Grand
River Avenue and Saginaw Street has centered around the preser-
vation of the residential character of the neighborhood and the
need to move traffic safely through those streets.
Fairview and Foster Avenues are residential streets, part of
a distinct and identifiable neighborhood of primarily detached
single family dwellings. On the north, these streets are the
main entrances leading into the Groesbeck residential area and
the office/retail district at Grand River.. They are traversed to
reach other residential areas located directly to the south.
They also serve as connectors crossing a one-way pair of.major
arterial roads which are state trunk lines and portions of M-43.
At present, Foster. Avenue has traffic lights at the two ma-
jor arterial streets (Grand River. and Saginaw), and Fairview
Avenue is controlled only by stop signs at both Grand River -and
Saginaw. However, in the near future, the State of Michigan in-
tends to install a traffic light at Fairview and Grand River in
response to the high incidence of right angle accidents at that
intersection.
3.2 Problem Identification (See Fig. 8)
The Committee and staff studied in detail two recurring
problems consistently voiced by residents of the Fairview and
Foster Avenues study area over the past few years. They are..
1. Excessive traffic on Foster and Fairview Avenues
for residential area.
2. Excessive delays for vehicles waiting to.cross
Grand River and Saginaw on Fairview and Foster
Avenues.
Analysis
To consider these alternatives, the following information
was collected and reviewed:
PAGE 24
The traffic volumes on these streets are (1983):
Foster:
3444
vehicles
per
day,
Fairview:
2617
vehicles
per.
day
Users
A 1985 peak hour (7:30-8:30 a.m./4:30-5:30 p.m.) license
plate survey shows that approximately 500 of the vehicles on
Foster. and Fairview belong to the residents in the immediate vi-
cinity of these two north and south streets. The other. 50% of
the vehicles belong to .residents outside the Lake Lansing Road,
Wood Street -Clemens, Michigan Avenue and US-127 boundaries. Of
these 50%, a significant portion, it is estimated, have destina-
tions in the vicinity requiring use of the segments of Foster and
Fairview under. consideration. -
Intersection Delays
To measure the delays on Foster. at Grand River and Saginaw,
the demand was compared to the discharge at the intersection.
The demand equals the number of vehicles which clear the inter-
section during that same green/amber phase. A delay is defined
as the condition when the vehicles have to wait beyond the first
green/amber cycle to clear the intersection; i.e., demand exceeds
the discharge. The following chart is a summary of the number of
delays at the•Foster. and Grand River/Saginaw intersections pre-
pared from a survey conducted in April 1985 by staff:
Number of Cycles
When Demand Exceeded Discharge
FOSTER AT GRAND RIVER
Time Northbound Southbound Total
--------------------------------------------------------
AM (7:30-8:30) 0 0 0
PM (4:30-5:30) 1 0 1
PAGE 25
FOSTER AT SAGINAW
Time Northbound Southbound Total
--------------------------------------------------------
AM 0- 0 0
PM 0 4 -4
Fairview at Grand River and Saginaw requires• a different
procedure for measuring delay. The last vehicle waiting at the
stop sign (if such was the case) was timed to measure the time
for that vehicle to clear the intersection. Samples were taken
every three minutes during the morning and evening peak traffic
hours.
The average delay on Fairview at Grand River was twenty two
(22) seconds during the AM peak and seventeen (17) seconds in the
PM peak. On only one (1) occasion was the delay on Fairview re-
corded as being greater than one (1) minute duration. That oc-
curred on the northbound approach during the PM peak at 5:15 p.m.
The average delay on Fairview at Saginaw was ten (10) sec-
onds during the AM peak and thirty seven (37) seconds in the PM.
During the AM peak hour the longest recorded delay on Fairview
was only twenty eight (28) seconds. During the PM peak there
were five (5) instances of delay spanning from one (1) minute to
two and one-half minutes. This delay occurred between 5:10 and
5:25 p.m. which represents the peak 15 minutes. These delays
were evidently insignificant.
Conclusio-ns
1. The traffic volumes on Foster and Fairview are typical of
several other residential streets within the City of Lansing.
The high volume is due to the setting of these streets as
short and attractive connectors between the two legs of state
trunk lines which are one- way streets.
2. Almost 50% of the traffic using these streets are from adja-
cent residential zones to the north of Grand River Avenue and
to the south of Saginaw Street.
3. The delay in traffic movement is insignificant.
PAGE 26
4• As a result of the new signal to be installed at Fairview, it
is anticipated that equalizations of traffic may be reached
between Foster and Fairview --slight increase in traffic
Fairview and corresponding .reduction on Foster.
3.3 Recommendations
It appeared to the Committee that there were minimal delays
on Fairview and Foster Avenues at the two major arterial roads,
and presently do not require any action.. Since it is anticipated
that the installation of the new traffic signal at Fairview and
Grand River will influence traffic volumes on Foster and Fairview
Avenues, it is recommended that:
1. Following the installation of the signal at Fairview and
Grand River, any changes in accident rates and traffic vol—
umes be carefully monitored requiring any remedial action.
2. Not more than two years after the installation of the signal
at Fairview and Grand River (or earlier if warranted) an
evaluation should be conducted to determine its impact upon
existing situation and to recommend any -improvements needed.
3. As previously stated, a north —south route connecting Aurelius
with Wood Street is not .recommended.
PROPOSED TRAFFIC SIGNAL
FIG 8 PROBLEK IDENTIFICATION
FOSTER ST., FAIRVIEW AVE.
SIGNAL
SIGNAL
U, I U0[
n n F7 F-`c-
1
u
PAGE 27
4.0 SPARROW HOSPITAL
4.1 Introduction and Problem Indentification
Sparrow Hospital over the past few years has had parking
problems for its staff and visitors. The Sparrow complex is
land -locked and surrounded by commercial, educational and resi-
dential uses (Fig. 9). Approximately 100-150 hospital related
vehicles per day park on the streets around the hospital. This
has led to complaints by the area residents while simultaneously
being an administrative problem for the hospital.
Over the past years there have been requests from various
public and private sector organizations and agencies for the de-
velopment of a plan to solve the Sparrow complex long term park-
ing needs. During the past, various proposals have been advanced
to address the parking problems in the area (e.g., construction
of parking ramps, establishment of a medical parking district,
and creation of additional parking lots adjacent to the hospi-
tal). However, as of this date, the Committee is aware of no
plan" that has been developed, let alone implemented, that ad-
dresses the medical complex's present and long term parking
needs.
In 1982, prior to,the construction of a new wing and exten-
sive remodeling of other sections of the hospital, Sparrow re-
quested, and the City Council granted, a Special Use Permit for
two years to establish a temporary hospital parking lot on the
State of Michigan Boys Training School property north of the
hospital and Eastern-Pattengill complexes. The property contains
2.2 acres and is estimated to accommodate 189 parking spaces.
The gravel parking lot was installed but the hospital, except
during the construction period, has seldom used the lot.
The Special Use Permit expired on -April 1, 1984 and is.currently
be.40're the City Administration again for renewal. The major is-
sues that have been raised during this process are:
1. In order to relieve the residential streets of the hospital
related parking, at least in the short range, what assurances
will be made that the parking lot will be used by the hospi-
tal staff, and once made, how they will be monitored; and
2. the long range expansion program of the hospital and local
requirements need to be understood by all concerned in order
to identify the future parking needs,* and ways to meet them.
PAGE 28
Currently, as part of the action by the City of Lansing on
the petition for the Special Use Permit, meetings have been held
between the representatives of the residents, hospital adminis-
tration and Planning Division to set up an on -going mechanism to
address the issues and concerns raised.
Since this topic is of major concern, the area residents and
the Planning Division have had direct input into both the process
and the conditions under which the Special Land Use is approved.
A major condition is the joint monitoring of the usage of the
parking lot by the hospital and City personnel and a review of
its use every six months. If, upon review, it is found that the
parking lot is underutilized by the hospital staff, the hospital
would lose its Special Use Permit, be required to remove the
parking area and return the property to its pre -construction
condition.
It is realized by the Committee that the parking problems
around the medical complex are directly related to the present
and future land use needs of the Sparrrow medical complex and
future development of the Boys Training School site and that the
use/master plan process would be a more appropriate follow-up for
addressing the problem.
4.'2 Recommendations
It is the recommendation of this Committee that:
1. No building permits for major additions or
expansions to the Hospital complex be issued
unless the parking needs of the hospital are
met.
2: That representatives of the hospital, Eastside
Neighborhood Organization, City of Lansing
Planning Division, and other interested
parties as part of the land use study
identify and develop acceptable and
feasible methods to meet the present and
long range needs of the Hospital.
3. Amend the Zoning Ordinance's parking
requirements to meet the needs of the
modern day hospital.
PAGE - 29
SPARROW HOSPITAL
FIG 9
MD SPARROW HOSPITAL PARKING
PAGE 30
APPENDICES
A. Meeting Dates
B. Council Resolution
C. Potter Park Neighborhood Association
Recommendation Re: Main Street
PAGE 31
EASTSIDE TRANSPORTATION STUDY COMMITTEE
Dates the meetings of the Committee were held:
November 19, 1982
March 18, 1983
May 12, 1983
May 25, 1983
September 22, 1983
September 28, 1983
November 1, 1983
November 15, 1983
February 9, 1984
February 23, 1984
March 8, 1984
March 29, 1984,
February 12, 1985
February 26, 1985
March 26, 1985
April 9, 1985
April 30, 1985
May 14, 1985
PAGE 32
6 q..
By Counciflma„_HULL MCKane. Bakers Adado, Blair and Belen`
Rewlyed by the City Cnuncil of the City of Laneinq
WHEREAS, the City Council on October 28, 1974, passed a resolution stating in part:
"Whereas, the City Council wishes to establish its record of being more concerned
about people than 'roads, especially if the construction of roads causes massive
displacement of citizens and/or splitting of residential communities;
Now, Therefore Be It Resolved that the Lansing City Council reaffirms its position
of being opposed to the Aurelius Road extension north of Kalamazoo Street to Wood
Street"; and
WHEREAS, the City Council in 1975 as a condition of removing the "recreation reverter
clause" on the Marshall Park site of the new fire station pledged to the Legislature that
the City would not construct the Aurelius -Wood Corridor from Kalamazoo Street to Grand River
Avenue; and
WHEREAS, Mayor Graves, in his January 9, 1978, State of the City Message proposed the
extension of Wood Street from Grand River through the Fairview School playground to
Saginaw, commonly referred to as the north end of the Aurelius -Wood Corridor; and.
WHEREAS, the Lansing Board of Education, Eastside Neighborhood Organization, Fairview
and others including numerous citizens residing in the proposed Aurelius -Wood Corridor
have expressed strong opposition to the proposal; and
WHEREAS, Mayor Graves, on February 6, 1978, withdrew his January 9, 1978 recommendation;
and
WHEREAS, -truck and other extraneous vehicular cross -through traffic are using residential
streets between Kalamazoo and Saginaw/Grand River which, coupled with conflicting parking
and traffic restrictions have adverse effects upon the established residential neighborhood;
and
WHEREAS, individual citizens and citizen groups from 1974 to the present have requested City
assistance in correcting the situation; and
WHEREAS, growth has been experienced in the southern section of this City and proposed
developments to the northeast of Lansing will affect traffic patterns, and the Planning
Department has on several occasions requested that traffic transportation studies be
conducted in the area; ,
NOW, THEREFORE, BE IT RESOLVED that the Lansing City Council reaffirms its positions of
opposition to the development of the Aurelius -Wood Corridor as stated in its resolution
of October 28, 1974; and
BE IT FURTHER RESOLVED that the Lansing City Council is opposed to making any of the
residential streets through -ways from Aurelius Road to Wood Street; and
BE IT FURTHER RESOLVED that the Lansing City Council deems it necessary to take immediate
measures to reduce and eliminate truck and cross -through traffic and conflicting parking/
traffic restrictions between Kalamazoo/Michigan and Saginaw/Grand River by:
1. Directing the Mayor to submit to the Council recommendations
for the elimination of truck traffic, cross -through vehicular
traffic, and conflicting parking/traffic restrictions and a
time schedule for implementation of such recommendations;
2. Directing all City departments to provide such information and
support as may be necessary on a top priority basis;and
BE IT FINALLY RESOLVED that the Council's Committee on Public Safety is authorized to
act as Council liaison to give such direction as may be requested by the Mayor until
such time as the Mayor's recommendations come before the Council or the Council deems
otherwise.
By Councilman Hull: That the resolution be amended as follows:
That in the fourth paragraph - 1st line after the word "Fairview" insert the following
"School Family -Teachers Association"
Carried:
The resolution as amended was
Adopted by the folbwing me: Unanirnously.
YEAS NAYS
i
Councilmen 4DADO
BAKER
BELEN I
B.LAIR
BRENKE
CUNTHER
HULL
I
MCKANE
MAYOR-�
K
RECOMMENDATIONS FROM POTTER PARK NEIGHBORHOOD ASSOCIATION
Eastside Traffic Study PPNA 4-10-85
RE: Main Street
Neighborhood perception of Main
Main street is viewed as the main entrance and. exit to the surrounding residential
area. 'There is no desire"to close the east of west sections of Main that would
be needed for it to function strictly as a residential street.
Main serves as a collector. Due to the current traffic volumes it poses a number
of other problems (speeding, pedestrian safety, visibiity etc) that are a concern
to area residents.
Recommendations are:
l.. That Main street NOT. BE REM O=D, and that for this report and in all future
references the difference between relocation and redesign be clear and well defined.
2. That the current road classification on Main be maintained and no upgrading is
advocated or desired.
3. That secondary problems and concerns (speeding, pedestrian safety, visibility etc)
be reviewed for short and long term remedies.
Possibile remedies to secondary problems we support are:
1. The area. of Main street between aurelius and Holmes be cubed, guttered and
resurfaced with restricted ingress/egress points to Martin block.
2. Main street remain two lanes WITHOUT widening.
3. More visible crosswalks an the east side of Main, east of Main at Main & Heald.
Main/Holmes/Heald intersections
The PPNA would like to request that staff provide the following information for'
review with written explanation as to why/how they do and do not apply before
making any final recommendations on the various sign -and signal options.
A. Provide numbers and criteria staff has gathered for the various options.
B. If not included in the above, a review warrents 1, 2, 5, 7&8, Part IV Section C
signals and Section D pedestrian signals in Mich Manual of Uniform. Traffic
Control Devices.
C. Also a review of Part II Signs Section 2B of the manual; for application of
any and/or the above at. the Main/Holmes/Heald intersections.
STAFF
DEPARTMENT OF PLANNING AND MUNICIPAL DEVELOPMENT
Alan E. Tubbs, Director
Planning Division
James N. Foulds, Director Don Hanna,
Graphics
Kunwar Rajendra, Coordinator
Transportation
Coordinator Louise Christian, Steno
James Ruff,. Senior
Planner.
DEPARTMENT OF PUBLIC SERVICE
David Berridge,
Transportation
Engineer
Dennis Randolph,
City Engineer
fo