Loading...
HomeMy WebLinkAboutSN 3941 Narrative Massachusetts Walkover over E Grand River 2017  BIENNIAL BRIDGE INSPECTION SUMMARY   MASSACHUSETTS AVENUE WALKOVER   OVER EAST GRAND RIVER AVENUE  STRUCTURE NUMBER – 3941  CITY OF LANSING, MI  October 12, 2017  Tetra Tech 401 South Washington Square, Suite 100, Lansing, MI 48933 Tel 517.316.3930 Fax 517.484.8140 www.tetratech.com The Massachusetts Avenue Walkover over East Grand River Avenue is  a single‐span painted steel truss constructed in 1968 and partially  repainted in 2003. The walkover is in generally fair condition.  SUPERSTRUCTURE  On the south stair, there is light rust and some peeling paint at the intermediate platform.   On the north stair, the fence post at the bottom of the south stringer has been repaired with a welded  base plate. The second fence post on the south stringer is heavily corroded. On the north intermediate  platform, there are scuff marks on the north face of the north beam. The bottom of the fencing is loose  on the north side of the platform.  Each main span support consists of two vertical columns and two diagonal braces. For the south main  span supports, there is light rust on the base plates. At the north supports, there is a 3/4‐inch diameter  rust hole on the bottom west face of the east diagonal brace.    At the main span truss, there is light spotted rust on the bottom chord members and rust on the bottom  diagonal cross bracing members. There are holes in the bottom of the 3rd cross brace from the south.  There is pack rust at the connection between the truss and the top of stairs at both ends.   At the center truss splice connection, the bottom transverse tube member on the north side of the  connection is bulged out on the top and south sides. The vertical and diagonal members on the west  side are also bulging at the bottom.  The bulging is apparently due to water freezing within the  members. The bulging has caused the paint to split and peel off, but there is no apparent section loss.    The two bottom bolts are missing on the underclearance sign on the east face of the main truss. The “No  Loitering” sign at the south intermediate platform is severely bent.  FOUNDATIONS  At the south main span supports, there is a small spall on the south side of the south concrete  foundation pedestal. There is new sidewalk adjacent to the south stairs, but the slab at the base of the  south stairs has scaling and spalling. At the north stairs, there is some scaling on top of the concrete  foundation pedestals.  There is new sidewalk at the north stairs.  There is guardrail in front of both the south and north truss foundation pedestals. The guardrail at the  south pedestal is bent at the east end.        Tetra Tech 401 South Washington Square, Suite 100, Lansing, MI 48933 Tel 517.316.3930 Fax 517.484.8140 www.tetratech.com RECOMMENDATIONS:   Perform welded repairs:     o Main span ‐ third bottom diagonal brace from the south.  o North main span support ‐ northeast diagonal brace.   Reattach fencing at the north stair.   Replace bent “No Loitering” sign at south stair.   Replace sidewalk at base of south stair.