HomeMy WebLinkAboutSN 3958 Narrative Beech over Red Cedar 2017 BIENNIAL BRIDGE INSPECTION SUMMARY  BEECH STREET OVER THE RED CEDAR RIVER  STRUCTURE NUMBER – 3958  CITY OF LANSING, MI  October 12, 2017  Tetra Tech 401 South Washington Square, Suite 100, Lansing, MI 48933 Tel 517.316.3930 Fax 517.484.8140 www.tetratech.com The structure is a three span concrete box beam bridge constructed in  2007. The bridge is in generally very good condition.   DECK AND SUPERSTRUCTURE  The superstructure consists of precast concrete box beams (21” deep in the south and middle spans, 12”  deep in the north span) with a six‐inch concrete deck. The deck has hairline longitudinal cracking  corresponding to the box beam joints. The expansion joints over the piers are filled with silt or grit.  There is a sidewalk on the west side of the bridge only. There is some very minor scuffing and chipping  along the sidewalk curb line. The railings are four‐tube galvanized steel on the west side and two‐tube  galvanized steel on a concrete brush block on the east side. The brush block has map cracking on the  curb line. There is map cracking on the concrete end blocks in all quadrants.  The concrete box beams have no visible deficiencies. The wood boards that were used to form the box  beam joints are still in place on top of the abutments.  SUBSTRUCTURES  The south abutment has limestone rip rap on the upper half of the slope while the lower half is bare  earth. The north abutment has map cracking on the face of both returnwalls. The north abutment is  protected by a timber retaining wall and an asphalt paved pedestrian path.  The piers consist of concrete filled, galvanized steel pipe piles with a cast‐in‐place concrete cap.  There is  a minor shallow spall on the south face of the south pier cap. The pipe piles have very light surface  discoloration at the waterline.  APPROACHES  There is concrete approach slab at both ends of the bridge with bituminous paving beyond. There is a  longitudinal crack down the center of the north approach slab. The sidewalk in the southwest quadrant  has settled 3/4".  There is concrete paving between the back of curb/sidewalk and the returnwalls in the northeast and  northwest quadrants. This pavement was placed without any expansion material around the approach  guardrail posts. The paving in the northeast quadrant has surface scaling.  There are weeds growing in  the joints between the paving and the returnwall at both quadrants.    There are dents at the northwest approach guardrail ending and in the southeast approach guardrail.  RECOMMENDATIONS:   Place additional rip rap along south slope.   Periodically clean out expansion joints.   Apply healer‐sealer to deck.