HomeMy WebLinkAboutSN 3955 Narrative Aurelius over Red Cedar River 2017 BIENNIAL BRIDGE INSPECTION SUMMARY  AURELIUS ROAD OVER THE RED CEDAR RIVER  STRUCTURE NUMBER – 3955  CITY OF LANSING, MI  October 10, 2017  Tetra Tech 401 South Washington Square, Suite 100, Lansing, MI 48933 Tel 517.316.3930 Fax 517.484.8140 www.tetratech.com The structure is a three span steel bridge constructed in 1972 and  rehabilitated in 2009. The bridge is in overall good condition.  DECK  The concrete deck has very tight map cracking throughout and minor diagonal cracks in the southwest  and northeast quadrants at the abutments. There are some hairline diagonal cracks. The deck was  constructed with galvanized steel stay‐in‐place formwork and the deck bottom cannot be observed for  inspection. The expansion joints are partially filled with grit.  There are sidewalks on both sides of the bridge and are in good condition. The railings are four‐tube  galvanized steel on concrete brush blocks and are in good condition.    SUPERSTRUCTURE  The beams are A588 steel with pin and hangers and are in overall good condition. The beams are  unpainted except at the pin and hangers. The pin and hangers were replaced and the beam ends zone  painted as part of the 2009 rehabilitation and are in generally good condition. The unpainted portions of  the beams have a tight, uniform layer of corrosion throughout and are generally performing as intended.  There are white stains on the beams at a regular spacing that appear to have been from sawcutting and  removing the original deck.  The diaphragms along the center of the bridge have somewhat heavier corrosion and minor  delamination. These appear to correspond to the location of the median and open longitudinal joint of  the original deck. There is moderate to heavy corrosion with some delamination at the fixed bearings at  the south abutment.    SUBSTRUCTURES  Both abutments have a minor vertical crack in the middle. The south abutment has a hairline crack  under the 5th bay from the west. The south pier has small spalls at the top of the construction joint on  both faces. The north pier has a vertical hairline crack. There are also several logs caught on the  upstream end north pier.  APPROACHES  The bridge approaches are concrete with concrete curb & gutter and are in overall good condition. The  approach guardrail meets current MDOT standards. There is some denting of the guardrail beyond the  bridge.  RECOMMENDATIONS:   Clean out expansion joints.   Remove logs from north pier.