Loading...
HomeMy WebLinkAboutSN 3946 Narrative Willow Walkover over N MLK Jr 2017  BIENNIAL BRIDGE INSPECTION SUMMARY  WILLOW STREET WALKOVER  OVER NORTH MARTIN LUTHER KING JR.  STRUCTURE NUMBER – 3946  CITY OF LANSING, MI  October 12, 2017  Tetra Tech 401 South Washington Square, Suite 100, Lansing, MI 48933 Tel 517.316.3930 Fax 517.484.8140 www.tetratech.com The Willow Street Walkover over North Martin Luther King Jr. is a  single‐span painted steel truss constructed in 1966. The walkover is in  generally poor condition.  SUPERSTRUCTURE  At the west stair, there are no base plates or anchor bolts at the bottom of the stringers. The fence posts  appear to be cast into the concrete. There is some peeling paint on the stringers. There are rust holes on  the back side of the bottom stair tread. The support column base plates are slightly warped.  At the east stair, the intermediate platform is framed with steel channel members and supported on  four columns. On the west side of the platform, there is pack rust between the channel and the tube  member supporting the deck planking. The beam is bulged out from the pack rust and the beam web is  corroded with a number of holes. It appears that this member may have had previous damage and has a  welded repair at the same time the fencing was replaced. The columns have scattered flaking rust.   There is a small hole at the bottom south side of the southwest column. The southeast support column  base plate is warped and bent.  Also at the east stair, there are newer fence posts and fencing on the east side of the stairs and  intermediate platform.  The connection of lower stair stringer and the intermediate platform appears to  have been previously damaged and has a welded repair. On the west side of the lower stair run, the top  rail of the pedestrian fencing was replaced with a square tube. The tube has some rust spots and is bent.  On the north side of the intermediate platform, the top horizontal tube of the pedestrian fencing is  missing. Some of the fencing fabric is loose at the bottom.  Each main span support consists of two vertical columns and two diagonal braces. At the east main span  supports, the south vertical column base plate is warped. At the west main span support, there is a rust  hole on the bottom south side of the south diagonal brace. There are welded steel repair plates on the  west and north faces of both diagonal braces. There is pack rust under the northwest and southwest  base plates and the plates are bent.  The main span truss has scattered peeling paint and spotted rust throughout. The first bottom diagonal  brace from the east is rusted through at both the middle and at the northeast end. The first bottom  diagonal brace from the west has uniform rust along its entire length, is rusted through at the southwest  end, and is partially cut away with a welded repair plate at the northeast end. The second top diagonal  brace from the west has a rust hole in the bottom at its northwest end. Some pedestrian fencing is  loose.      Tetra Tech 401 South Washington Square, Suite 100, Lansing, MI 48933 Tel 517.316.3930 Fax 517.484.8140 www.tetratech.com FOUNDATIONS  At the east main span supports, there are chips on the corners of the concrete support pedestal.    RECOMMENDATIONS:   Perform steel repairs at west support columns and at main span diagonal braces, top and bottom.   Install new top fence rail at north side of east intermediate stair platform.    Reattach loose fencing.